AXE 810 Start Up Report
AXE 810 Start Up Report
TEST INSTRUCTION
E
Copyright
© Ericsson 2003
Disclaimer
The contents of this document are subject to revision without notice due to
continued progress in methodology, design and manufacturing. Ericsson shall
have no liability for any error or damage of any kind resulting from the use
of this document.
Abstract
This test report is unique for the Network Element noted in this table below.
Table 1
Network Element information
Type: MSC (__) HLR (__) SCP(__) BSC/TRC(__) TRC(__) BSC(__) Other:
___________(__)
Product no. Order no:
Exchange name:
SW-SP/AP: SW-CP:
Ericsson personnel
Tester 1, name (spelled): Tester 2, name (spelled):
The cases performed during this start up phase are specified in this report
-------------------------------
Ericsson Test Leader
Signature
Contents
1 General 1
2 Start Up Activities 3
3 REVISION INFORMATION 5
1 General
This document serves as a report from the Start Up activity. The purpose of
this test phase is to start up the AXE at the customer site. A final verification is
also performed.
Factory Test and Start Up are the two test phases performed to reach RFI
(Ready For Integration). The test reports serves as a basis for the acceptance
between Ericsson and the customer.
The tested Network Element has passed every signed part in this test report.
Not performed test (if any) is noted in this test report.
Any outstanding items will be tested in the next test phase, Integration Test.
2 Start Up Activities
When a Start Up case has been performed, the result should be signed in
the table below.
An outstanding item number should be assigned for NOT performed test cases.
Table 2
Start Up Instruction, AXE 810
68/1532-B/AXE 106 99 Uen Rev:_____
Chapter Title Signature (test Outstanding
OK) item no. (test
not performed)
6.1 Start up of IOG
6.2 Start up of APG40
6.3 Start up of APZ
6.4 Check of RPs, EMs and Group switch
6.5 Verification of alarm panel and external
alarms
6.6 Final Verification of Network Element
6.7 Start Up Report
3 REVISION INFORMATION