SN Description Location WIR

1 Earth work Cutting & Filling for Road Works in Road No.08 ,Area-02 (CH:00+00 to CH:00+273) Road No.08 ,Area-02
2 Backfilling For Road using imported natrual materail in Road No.2,Area-08 from (CH:00+00 to CH:00+273) @200mm each layer Road No.08 ,Area-02
3 Preparation of Excavated and Filled Surface in Road No.08 ,Area 02 to Receive the Formation Level from (CH:00+010 to Ch:00+150) Road No.08 ,Area-02

4 Earth work Cutting & Filling for Road Works in Road No.14 ,Area-04 (CH:00+0 to CH:00+282) Road No.14 ,Area-04
5 Backfilling For Road using imported natrual materail in Road No.14,Area-04 from (CH:00+00 to CH:00+282) @200mm each layer Road No.14 ,Area-04

6 Excavtion and formation for stormwater Gully in RoadN0.22, Area 04 (TE-G/101B , TE-G/101C ,TE-G/104,TE-G/103 ,TE-G/102) RoadN0.22, Area 04
7 Installation of stormwater Gully in Road N0.22, Area 04 (TE-G/101B , TE-G/101C ,TE-G/104,TE-G/103 ,TE-G/102) RoadN0.22, Area 04
8 Installation and Concrete casting for Backdrop of stormwater Gully in Road N0.22, Area 04 (TE-G/101B , TE-G/101C ,TE-G/104,TE-G/103 ,TE-G/102) RoadN0.22, Area 04
9 Excavation for stormwater Gully line for gully in Road N0.22, Area 04 (TE-G/101B , TE-G/101C ,TE-G/104,TE-G/103 ,TE-G/102) RoadN0.22, Area 04
10 Pipe laying Gully line 160mm including Y-Branch for gully in Road N0.22, Area 04 (TE-G/101B , TE-G/101C ,TE-G/104,TE-G/103 ,TE-G/102) RoadN0.22, Area 04

Rectification and adjust cover level of existing sewerage manhole in Area 2 : Road.3 (MH-176-9-1) ,Road No.9 (MH-176-16-8 & MH-176-9 ) , Road No.10 (MH-176-9-3) , Road
11 Road NO .3 &9&10&11&12
No.11 ( MH-176-16-3-4 & MH-176-16-3-3) , Road No.12 (MH-176-16-2& MH-176-16-3)