You are on page 1of 1

Project Checklist

Date:

Basic Information Project Information


Project Name: Application: Power Source ESS to work with:
Renewable Energy Smoothing Triditional Generation
Project Location: Peak Shaving (gas turbine, coal generation)
Backup Power PV
Customer Name: Frequency Regulation Wind Turbine
Microgrid Hydro Power
Contact Information:
Anciliary Service Diesel Generator
Project Description: Others Others
Connection Type: On-grid or Off-grid:
AC-oupled On-grid
DC-coupled Off-grid
Purcahse Order Date Expected: Both
Grid Frequency:
50Hz
60Hz
Esmaited Time of Delivery: Voltage of POI/POC:
400VAC LV V
COD Time: 480VAC MV V
600VAC HV V
Commercial Requirement Others

Incoterms Requirement: Load Profile or Use Case


EXW FOB CIF DDP Load Profile Avaliable: Load Profile Avaliable:
Yes(If yes, share it with this list.) 1 cycle/day
No 1.5 cycle/day
Warranty Requirement
2 cycle/day
Cubenergy Standard 3 years 5 years Max Charging/Discharging 3 cycle/day
10 years 15 years Power: kW Others

Others
Sizing and Environment
Maintenance Requirement: (PCS) Power Required:
Not required 5 years 10 years kW
15 years Others Battery Size Required:
kWh
Other Requirement
Specify other requirements: Scope of Supply Required : Environment :
Battery System Temperature ℃
Battery Container Humidity %
PCS Altitute m
MV Transformer Distance to sea m
Others Corrosion degree

www.absenenergy.com

You might also like