MEASUREMENT SHEET
W.O NO:-4300081663-MON/20.12.2023 Sl.No. 1
Name of Work :-Renovation of German Hangers of Warehouse at NRL Site. Date of Issue: 23.12.2023
Name of Contractor :-M/S DARSAN GOHAIN Bill No: RA-01
Location:-German Hangers (Warehouse) Permit No:
Billing Period: 23/12/2023 to 31/03/2024 Date of Completion: 22.06.2025
Height/
Sl.no Item Code Item Descriptions Unit Nos Length (L) Width (W) Quantity Remarks
Depth/Weight
1 10 Earth work in excavation
German Hanger 1 Footing M3 1 62 0.8 0.8 0.6 23.81
Drain Culvert (1,2,3) M3 1 3 7 1.2 0.6 15.12 Avg Height = 0.6 m
Total 38.93
2 20 Filling available excavated earth
German Hanger 1 Footing M3 (Total Excavation Qty - PCC+RCC+Column Area) 15.04
Drain Culvert (1,2,3) M3 2 3 7 0.15 0.4 2.52
Total 17.56
3 40 PCC 1:3:6 up to pl
German Hanger 1 footing M3 1 62 0.65 0.65 0.075 1.96
Drain Culvert 1,2,3 M3 1 3 7 0.9 0.075 1.42
Both side of GH Kerb wall M3 1 2 50 0.12 0.17 2.04
Total 3.38
4 60 Steel reinforcement TMT
German Hanger 1 Footing KG AS PER BBS 556.79
Drain Culvert 1,2,3 KG AS PER BBS 550.04
Total 1106.83
5 70 Shuttering foundation
German Hanger 1 PCC footing M2 4 62 0.65 X 0.075 12.09
German Hanger 1 RCC footing M2 4 62 0.6 X 0.225 33.48
Drain Culvert 1,2,3 PCC M2 2 3 7 X 0.075 3.15
Drain Culvert 1,2,3 PCC M2 2 3 0.9 X 0.075 0.41
Drain Culvert 1,2,3 RCC M2 2 3 7 X 0.2 8.40
Drain Culvert 1,2,3 RCC M2 2 3 0.9 X 0.2 1.08
Drain Culvert 2,3 RCC wall M2 2 4 7 X 0.4 22.40
Drain Culvert 2,3 RCC M2 2 4 0.4 X 0.3 0.96
Both side of GH Kerb wall M2 2 2 50 X 0.17 34.00
Total 115.97
6 90 Shttering in columns
German Hanger 1 Column M2 4 63 0.3 X 0.3 22.68
Total 22.68
7 140 Precoated gi profile sheets 0.50 mm
German Hanger 1 Sheet M2 1 2 49 X 3.3 323.40
Total 323.40
8 150 Structural steel work in builtup section
ISA 65 X 65 X6 Angle (GH-01) KG 1 63 3.75 5.8 1370.25
Plate KG 1 63 0.25 0.25 47.1 185.46
ISMC 100 (Culvert 2,3) KG 2 9 0.85 9.6 146.88
Total 1702.59
9 160 Providing add fixing bolts
Providing add fixing bolts GH-01 KG 4 63 0.226 56.95
Total 56.95
10 190 RCC 1:1.5:3 up to plinth level
German Hanger 1 footing M3 1 63 0.6 0.6 0.225 5.10
German Hanger 1 Column M3 1 63 0.3 0.3 0.3 1.70
Drain Culvert Raft (1,2,3) M3 1 3 7 0.9 0.2 3.78
Drain Culvert Wall(2,3) M3 2 2 7 0.3 0.4 3.36 Avg height= .4 m
Total 13.94
Sl.no Item Code Item Descriptions Unit Nos Length (L) Width (W)
4 40 PCC 1:3:6 up to pl
German Hanger 1 footing M3 1 63 0.65 0.65
Drain Culvert 1,2,3 M 3
1 3 7 0.9
Both side of GH Kerb wall 1 2 50 0.1
70 Shuttering foundation
German Hanger 1 PCC footing M2 4 63 0.65 X
German Hanger 1 RCC footing M2 4 63 0.6 X
Drain Culvert 1,2,3 PCC M2 2 3 7 X
Drain Culvert 1,2,3 PCC M 2
2 3 0.9 X
Drain Culvert 1,2,3 RCC M 2
2 3 7 X
Drain Culvert 1,2,3 RCC M2 2 3 0.9 X
Drain Culvert 2,3 RCC wall M 2
2 4 7 X
Drain Culvert 2,3 RCC M2 2 4 0.4 X
Both side of GH Kerb wall M 2
2 2 50 X
80 Shuttering in lintel,beams
90 Shttering in columns
German Hanger 1 Column M2 4 63 0.3 X
RA-01
Hot permit
Height/
Quantity Remarks
Depth/Weight
0.6 12.29
0.6 11.90
0.6 15.12 Avg Height = 0.6
Total 39.31
0.075 2.00
0.075 1.42
0.2 2.00
Total 3.41
0.075 12.29
0.225 34.02
0.075 3.15
0.075 0.41
0.2 8.40
0.2 1.08
0.4 22.40
0.3 0.96
0.2 40.00
Total 122.70
0.3 22.68
Total 22.68
5.8 1370.25
47.1 185.46
9.6 146.88
7.1 894.60
Total 2597.19
0.46 115.92
Total 115.92
0.225 5.10
0.3 1.70
0.2 3.78
0.4 3.36 Avg height= .4
Total 13.94