You are on page 1of 8

ABSTRACT SHEET

NAME OF WORK :-Renovation of German Hangers of Warehouse at NRL Site.


W.O NO:-4300081663-MON/20.12.2023
NAME OF CONTRACTOR :-M/S DARSAN GOHAIN
BILL NO: RA-01
Quantity Value of Work Amount
SOR
Sl.no Item no Item Description Unit Upto Since Total Upto Quantity Rate Upto SOR Amount
Since Previous Total Upto Date
Previous Previous Date Previous
1 10 Earth work in excavation M3 0.00 38.93 38.93 250 198.11 ₹ 0.00 ₹ 7,712.42 ₹ 7,712.42 ₹ 49,527.50
2 20 Filling available excavated earth M3 0.00 17.56 17.56 60 244.88 ₹ 0.00 ₹ 4,300.09 ₹ 4,300.09 ₹ 14,692.80
3 30 Filling with river sand M 3
0.00 0.00 0.00 40 2084.01 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 83,360.40
4 40 PCC 1:3:6 up to pl M 3
0.00 3.38 3.38 140 6589.35 ₹ 0.00 ₹ 22,272.00 ₹ 22,272.00 ₹ 922,509.00
5 50 RCC 1:1.5:3 avobe pl M 0.00
3
0.00 0.00 210 9821.29 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 2,062,470.90
6 60 Steel reinforcement tmt KG 0.00 1106.83 1106.83 3500 86.44 ₹ 0.00 ₹ 95,674.39 ₹ 95,674.39 ₹ 302,540.00
7 70 Shuttering foundation M2 0.00 115.97 115.97 100 296.95 ₹ 0.00 ₹ 34,437.29 ₹ 34,437.29 ₹ 29,695.00
8 80 Shuttering in lintel,beams M2 0.00 0.00 0.00 300 586.62 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 175,986.00
9 90 Shttering in columns M 2
0.00 22.68 22.68 20 775.53 ₹ 0.00 ₹ 17,589.02 ₹ 17,589.02 ₹ 15,510.60
10 100 Brickwork 1st class 1:6 above pl M 3
0.00 0.00 0.00 20 7992.34 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 159,846.80
11 110 Brickwork paster 1:6 12 mm M 2
0.00 0.00 0.00 300 271.92 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 81,576.00
12 120 Neat cement punning M2 0.00 0.00 0.00 100 65.37 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 6,537.00
13 130 Paver blockes 80 mm thick m30 M 2
0.00 0.00 0.00 80 843.91 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 67,512.80
14 140 Precoated gi profile sheets 0.50 mm M 2
0.00 323.4 323.40 2500 647.57 ₹ 0.00 ₹ 209,424.14 ₹ 209,424.14 ₹ 1,618,925.00
15 150 Structural steel work in builtup section KG 0.00 1702.59 1702.59 7000 84.46 ₹ 0.00 ₹ 143,800.75 ₹ 143,800.75 ₹ 591,220.00
16 160 Providing add fixing bolts KG 0.00 56.95 56.95 500 135.14 ₹ 0.00 ₹ 7,696.22 ₹ 7,696.22 ₹ 67,570.00
17 170 Unskilled manpower supply Day 0.00 0.00 0.00 1500 696.6 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 1,044,900.00
18 180 Epoxy painting M2 0.00 0.00 0.00 800 194.49 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 155,592.00
19 190 RCC 1:1.5:3 up to plinth level M3 0.00 13.94 13.94 10 8065.47 ₹ 0.00 ₹ 112,432.65 ₹ 112,432.65 ₹ 80,654.70
20 200 Brick work 1:4 upto pl M 3
0.00 0.00 0.00 10 6636.21 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 66,362.10
21 210 Cement based putty M 2
0.00 0.00 0.00 50 119.43 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 5,971.50
22 220 Water thinnable cement primer M2 0.00 0.00 0.00 50 62.15 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 3,107.50
23 230 Acrylic smooth exterior paint M 2
0.00 0.00 0.00 50 160.89 ₹ 0.00 ₹ 0.00 ₹ 0.00 ₹ 8,044.50
TOTAL ₹ 0.00 ₹ 655,338.98 ₹ 655,338.98 ₹ 7,614,112.10

Page 1 of 8
Page 2 of 8

MEASUREMENT SHEET
W.O NO:-4300081663-MON/20.12.2023 Sl.No. 1
Name of Work :-Renovation of German Hangers of Warehouse at NRL Site. Date of Issue: 23.12.2023
Name of Contractor :-M/S DARSAN GOHAIN Bill No: RA-01
Location:-German Hangers (Warehouse) Permit No:
Billing Period: 23/12/2023 to 31/03/2024 Date of Completion: 22.06.2025
Height/
Sl.no Item Code Item Descriptions Unit Nos Length (L) Width (W) Quantity Remarks
Depth/Weight
1 10 Earth work in excavation
German Hanger 1 Footing M3 1 62 0.8 0.8 0.6 23.81
Drain Culvert (1,2,3) M3 1 3 7 1.2 0.6 15.12 Avg Height = 0.6 m
Total 38.93
2 20 Filling available excavated earth
German Hanger 1 Footing M3 (Total Excavation Qty - PCC+RCC+Column Area) 15.04
Drain Culvert (1,2,3) M3 2 3 7 0.15 0.4 2.52
Total 17.56
3 40 PCC 1:3:6 up to pl
German Hanger 1 footing M3 1 62 0.65 0.65 0.075 1.96
Drain Culvert 1,2,3 M3 1 3 7 0.9 0.075 1.42
Both side of GH Kerb wall M3 1 2 50 0.12 0.17 2.04
Total 3.38
4 60 Steel reinforcement TMT
German Hanger 1 Footing KG AS PER BBS 556.79
Drain Culvert 1,2,3 KG AS PER BBS 550.04
Total 1106.83
5 70 Shuttering foundation
German Hanger 1 PCC footing M2 4 62 0.65 X 0.075 12.09
German Hanger 1 RCC footing M2 4 62 0.6 X 0.225 33.48
Drain Culvert 1,2,3 PCC M2 2 3 7 X 0.075 3.15
Drain Culvert 1,2,3 PCC M2 2 3 0.9 X 0.075 0.41
Drain Culvert 1,2,3 RCC M2 2 3 7 X 0.2 8.40
Drain Culvert 1,2,3 RCC M2 2 3 0.9 X 0.2 1.08
Drain Culvert 2,3 RCC wall M2 2 4 7 X 0.4 22.40
Drain Culvert 2,3 RCC M2 2 4 0.4 X 0.3 0.96
Both side of GH Kerb wall M2 2 2 50 X 0.17 34.00
Total 115.97
6 90 Shttering in columns
German Hanger 1 Column M2 4 63 0.3 X 0.3 22.68
Total 22.68
7 140 Precoated gi profile sheets 0.50 mm
German Hanger 1 Sheet M2 1 2 49 X 3.3 323.40
Total 323.40
8 150 Structural steel work in builtup section
ISA 65 X 65 X6 Angle (GH-01) KG 1 63 3.75 5.8 1370.25
Plate KG 1 63 0.25 0.25 47.1 185.46
ISMC 100 (Culvert 2,3) KG 2 9 0.85 9.6 146.88
Total 1702.59
9 160 Providing add fixing bolts
Providing add fixing bolts GH-01 KG 4 63 0.226 56.95
Total 56.95
10 190 RCC 1:1.5:3 up to plinth level
German Hanger 1 footing M3 1 63 0.6 0.6 0.225 5.10
German Hanger 1 Column M3 1 63 0.3 0.3 0.3 1.70
Drain Culvert Raft (1,2,3) M3 1 3 7 0.9 0.2 3.78
Drain Culvert Wall(2,3) M3 2 2 7 0.3 0.4 3.36 Avg height= .4 m
Total 13.94

Contractor Signature NRL Signature EIC Signature


MEASUREMENT SHEET
W.O NO:- Sl.No.
Name of Work :- Date of Issue:
Name of Contractor :- Bill No:
Notification No:- Permit type:
Location:-German Hangers (Warehouse) Permit No:
Date of Starting: Date of Completion:
Issued By: Job Recived By:

Sl.no Item Code Item Descriptions Unit Nos Length (L) Width (W)

1 10 Earth work in excavation


German Hanger 1 west side M3 1 32 0.8 0.8
German Hanger 1 East side M3 1 31 0.8 0.8
Drain Culvert (1,2,3) M 3
1 3 7 1.2

2 20 Filling available excavated earth

3 30 Filling with river sand

4 40 PCC 1:3:6 up to pl
German Hanger 1 footing M3 1 63 0.65 0.65
Drain Culvert 1,2,3 M 3
1 3 7 0.9
Both side of GH Kerb wall 1 2 50 0.1

50 RCC 1:1.5:3 avobe pl

60 Steel reinforcement TMT

70 Shuttering foundation
German Hanger 1 PCC footing M2 4 63 0.65 X
German Hanger 1 RCC footing M2 4 63 0.6 X
Drain Culvert 1,2,3 PCC M2 2 3 7 X
Drain Culvert 1,2,3 PCC M 2
2 3 0.9 X
Drain Culvert 1,2,3 RCC M 2
2 3 7 X
Drain Culvert 1,2,3 RCC M2 2 3 0.9 X
Drain Culvert 2,3 RCC wall M 2
2 4 7 X
Drain Culvert 2,3 RCC M2 2 4 0.4 X
Both side of GH Kerb wall M 2
2 2 50 X

80 Shuttering in lintel,beams

90 Shttering in columns
German Hanger 1 Column M2 4 63 0.3 X

100 Brickwork 1st class 1:6 above pl

110 Brickwork 1st class 1:6 above pl

120 Neat cement punning

130 Paver blockes 80 mm thick m3

140 Precoated gi profile sheets 0.50 mm

150 Structural steel work in builtup section


ISA 65 X 65 X6 Angle (GH-01) KG 1 63 3.75
Plate KG 1 63 0.25 0.25
ISMC 100 (Culvert 2,3) KG 2 9 0.85
ISMC 75 (Culvert 2,3) KG 2 9 7

160 Providing add fixing bolts


Providing add fixing bolts GH-01 KG 4 63

170 Unskilled manpower supply

180 Epoxy painting

190 RCC 1:1.5:3 up to plinth level


German Hanger 1 footing M3 1 63 0.6 0.6
German Hanger 1 Column M 3
1 63 0.3 0.3
Drain Culvert Raft (1,2,3) M 3
1 3 7 0.9
Drain Culvert Wall(2,3) M 3
2 2 7 0.3

200 Brick work 1:4 upto pl


210 Cement based putty

220 Water thinnable cement primer

230 Acrylic smooth exterior paint


1

RA-01
Hot permit

Height/
Quantity Remarks
Depth/Weight

0.6 12.29
0.6 11.90
0.6 15.12 Avg Height = 0.6
Total 39.31

0.075 2.00
0.075 1.42
0.2 2.00
Total 3.41

0.075 12.29
0.225 34.02
0.075 3.15
0.075 0.41
0.2 8.40
0.2 1.08
0.4 22.40
0.3 0.96
0.2 40.00
Total 122.70

0.3 22.68
Total 22.68

5.8 1370.25
47.1 185.46
9.6 146.88
7.1 894.60
Total 2597.19

0.46 115.92
Total 115.92

0.225 5.10
0.3 1.70
0.2 3.78
0.4 3.36 Avg height= .4
Total 13.94