LEGEND

C.1 THE FOUNDATIONS DESIGN IS DONE FOR AN ALLOWABLE BEARING


E.J. EXPANSTION JOINT CAPACITY OF 250 KPA ON ROCK
C.2 THE NATURAL SOIL/ROCK AT THE RECOMMENDED EXCAVATION LEVEL
RW RETAINING WALL SHOULD BE THOROUGHLY INSPECTED. ALL LOOSE LAYERS, SOFT
SPOTS, SILTY AND CLAYEY POCKETS OR ANY OTHER INFERIOR
RW-R RETAINING WALL ADJACENT TO ROAD MATERIAL SHOULD BE TOTALLY REMOVED AND REPLACED WITH
BACKFILL MATERIAL OR BLINDING CONCRETE AS PER SPECIFICATIONS
RW-T RETAINING WALL WITH TERRACE AND TO THE APPROVAL OF THE ENGINEER.
C.3 WHERE AN OPEN EXCAVATION CANNOT BE CARRIED OUT, ADEQUATE
LUP LUP EXCAVATION SUPPORTS AND PROTECTION SYSTEMS SHOULD BE
INSTALLED AND MONITORED, IN ORDER TO SAFELY SUPPORT THE
IDES OF THE EXCAVATION AND ANY EXISTING ADJACENT SURCHARGE,
PIPES CROSSING
WITHOUT DISTURBING THE UNDERLYING SOILS OR CAUSING ANY DAMAGE.
AREA TO BE ON
C.4 SURFACE WATER SHOULD BE PREVENTED FROM ENTERING EXCAVATIONS,
HOLD AWAITING
FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING THE
FINAL PIPES
PROJECT SITE.
LOCATION AND
C.5 IF NEEDED, A DEWATERING SYSTEM SHALL BE USED TO ALLOW FOR
LEVELS
DRY CONDITIONS BELOW THE FINAL EXCAVATION LEVEL AS PER THE
PROJECT SPECIFICATIONS. THE DEWATERING SYSTEM SHALL BE
DESIGNED INSTALLED,MONITORED AND MAINTAINED BY THE CONTRACTOR
TO THE APPROVAL OF THE ENGINEER AS SPECIFIED THE CONTRACTOR
IS ALSO RESPONSIBLE FOR REMOVING THE DEWATERING SYSTEM, WHEN
IT IS NO LONGER NEEDED
C.6 FOR ALL ADJACENT FOUNDATIONS AT DIFFERENT LEVELS AND WHERE
THE SLOPE REQUIREMENTS ARE NOT SATISFIED, LEAN CONCRETE
SHALL BE PLACED UNDERNEATH THE HIGHER FOUNDATION DOWN TO
THE BOTTOM LEVEL OF THE LOWER FOUNDATION.
C.7 AS PER THE APPROVED DETAILED GEOTECHNICAL REPORT (NUMBERED
PPH600010001P00B, GEOTECHNICAL FILE NO.:2020/158), PROBE
DRILLING UP TO A DEPTH OF 2"B" OR 10m. (WHICHEVER IS GREATER)
SHALL BE MADE UNDER FOUNDATIONS AT A RATE OF 1 PROBE UNDER
EACH SINGLE FOOTING OR 1 PROBE EACH 10 LINEAR METERS FOR
STRIP FOOTINGS. IF A CAVITY IS ENCOUNTERED DURING PROBE
DRILLING,THEN IT SHALL BE FILLED WITH CONCRETE OR GROUT AS
SPECIFIED.

83. 83.60
C.8 FILL MATERIAL, PLACEMENT, COMPACTION AND QUALITY CONTROL SHALL
FOLLOW THE PROCEDURE AND RECOMMENDATIONS SPECIFIED WITHIN THE
F&B

LUP
PROJECT SPECIFICATIONS REFERENCED AS SECTION 312000 OF
DOCUMENT NUMBER HE-000070
C.9 THE LEVELS SHOWN ON DRAWINGS IS THE BULK EXCAVATION LEVEL

80
CORPORATE AC AND IT IS ESTIMATED WITH THE CONSIDERATION OF 100mm THICK

ADEMY BLINDING. LOCATION, DIMENSIONS AND LEVELS OF THE EXTRA


EXCAVATIONS ARE NOT SHOWN ON THE DRAWINGS.
BUILDING C.10 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE
ADJACENT SERVICES, BUILDINGS, ROADS, OR UNDERGROUND
TO
STRUCTURES
OR UTILITIES OF ANY TYPE RESULTING FROM TEMPORARY WORKS. THE
SETTLEMENT OF THE ADJACENT GROUND OR BUILDINGS SHALL BE
F&B MAINTAINED BELOW THE VALUE THAT WOULD NOT CAUSE ANY DAMAGE
ACCORDING TO ITS CURRENT CONDITION.
C.11 THE WALLS NAMING ON DRAWINGS ARE ONLY FOR REINFORCEMENT AND
FOUNDATION SIZES GUIDANCE AS FOR THE EXACT TOP LEVEL OF THE WALL
IT SHOULD BE READ FROM THE LANDSCAPE DRAWINGS.

B MI
U
L

IL
I

D
IN
T

E
F&B

=
G

LUP
14 16
2
9

0 88
E

3
6 .2
X

.8 4
CLEANING MACHINE PARKING

0
C

3 6
0

7
A

84.0

84.60
V

83.8

.20

84.40
A
E

T
N

IO
=

84
=

N
14 16
2
9

0 47
1
0
4 .8
.5 0
7 3
2

LUP
E
N

=
=

4 911
14 6
2

0 40
0
4 .2
.3 5
7 1
1

D
T

R
-9
E

W
E

R
R
N

R
=

A
14 16
2

C
9

0 35

LUP
C
1

E
4 .9
.4 3
0 6
7
E

E
R
N

13-

N
=

=
RW
W
=

=
4 911

4
5

RW17-R
14 6

14 16
-T
2

2
0 31

0 77
0

1
T

3
4 .1

8 .6
.4 4

.4 1
3 5

7 8
R

.00
9

.80
R W5-T

.60

84.40
84.20
A

84.00
R

83.80
83.60
C

83.40
85

LUP
83.20
84
E
T

83.00
84

82.80
E
D
E

N
R

=
O
R
W

=
7

4
R

R
-R

14 16
2
A

0 67
O

3
C

4 .5
E

.3 4
A

8 9
=
R

0
7-
D

4
1
RW

14 16

C
2
RETAINING WALLS DETAILS ARE E.J.

0 62
1

2
25mm
PART OF THE CORPORATE

9 .3
.9 5
9 2
ACADEMY BUILDING

9
.
9 -R .J m
E m
RW 2
5
D

LU
P
REMOVABLE BOLLARD

LU
P

LU
P
D
A
O
R

LU
0 1.0 2.0 3.0 4.0 5.0 10.0

P
METERS

SCALE: 1:650

You might also like