WATERPROOF MEMBRANE TO
CONCRETE SUBSTRATE
OPENING TO PARKVIEW
SPECIFICATION FIXING OF REAR STORM
MOULD ANGLE TO PRECAST
FURRING CHANNEL FIXED VIA UNIVERSAL PLASTIC
FROM CONCRETE PRECAST ANCHOR & SECTION FIXING.
PANEL VIA FIXING CLIP TO PROPRIETRY TYPE OF FIXING
ACCOMMODATE 50mm & SPACING TO WIND LOADING
INSULATION BOARDS REGULATIONS. AS/NZS
1170.2 & VERIFIED BY
13mm PLASTERBOARD
FACADE ENGINEER.
LINING, SET & PAINT
FINISHED
END DAM OF SUBSILL WITH
SEALANT TO STRUCTURE
20mm AIR GAP
SET PLASTERBOARD
0701 REVEAL BELOW
20 13
50
283
200
SUITABLE WEATHERPROOFING
BARRIER TOP COAT. PAINT LINE OF SUBSILL
FINISH TO MANUFACTURER'S LINE OF WALL BELOW
SPECIFICATIONS
POWDERCOATED AL TRIM STORM
50mm FOILED FACED INSULATED PIR MOULD ANGLES BED IN
BOARD FIXED TO PRECAST CONCRETE SEALANT TO JAMB OR SUBJAMB
PANEL TOGETHER WITH FOIL TAPED TO SUIT PROPRIETRY WINDOW
JOINTS TO PROPRIETRY DETAILS FRAME. COLOUR MATCHED
RIVETS TO FRAME
200mm PRECAST CONCRETE WALL TO
SEALANT & BACKING ROD TO
STRUCTURAL ENGINEER'S DETAIL
WINDOW STORM MOULD ANGLES
PRIMER MEMBRANE TO TO WINDOW SUBCONTRACTORS
CONCRETE SUBSTRATE OPENING DETAILS & AS VERIFIED BY
TO PARKVIEW SPECIFICATION FACADE ENGINEER
EXTERIOR
4. WINDOW INSTALLED