You are on page 1of 1

club 3 asia projects inc.

A S B U I L T P L A N S
DOWEL TO MATCH
DOWEL TO MATCH CHB VERT. BARS SEE CONSTRUCTION NOTES
CHB VERT. BARS FOR MASONRY WALL REIN-
FORCEMENTS (TYPICAL)
WHERE SLAB
DEPRESSION OCCURS

1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS BITUMINOUS FILLER
OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET
SPECIAL CONDITIONS. 300 PRE-MOULDED EXPANSION JOINT
(TYP) DOWEL BARS TO MATCH FILLER (BITUMINOUS MATERIAL)
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL CHB VERT. BARS SLAB REINF.
STEEL, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FIN. FLR. LVL. FLR. LVL.
SLAB REINF.
FOR ENGINEER'S APPROVAL BEFORE FABRICATION.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN,
REMARKS
CHECK WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS, PIPE
SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE
SHORINGS AND BRACINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE
IMPOSED DURING CONSTRUCTION. GRAVEL BASE PEJ

VAPOR BARRIER SUBGRADE COMPACTED


VAPOR BARRIER SUBGRADE COMPACTED WHEN REQ.
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BULDING WHEN REQ. TO 95% OF MAXIMUM
TO 95% OF MAXIMUM
CODE OF AMERICAN CONCRETE INSTITUTE (ACI-318). DRY DENSITY @ OPTIMUM
MOISTURE @ OPTIMUM
MOISTURE CONTENT (MAX.
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE CONTENT (MAX. DEPTH
DEPTH OF COMPRESSED
END OF TWENTY EIGHT (28) DAYS WITH CORRESPONDING MAXIMUM SIZE OF COMPRESSED FILL
FILL = (200mm PER LAYER).
AGGREGATE AND SLUMPS AS FOLLOWS : = 200/LAYER)

LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP

CURBS & SLAB


ON GRADE 3000 PSI(210KG/CM )2 1 IN. (25MM.) 4 IN. (100MM.)
EXCEPT FOUND.
6@100, REST@200 TO CL
FOUNDATION & 3000 PSI(210KG/CM )2 3/4 IN. (19MM.) 4 IN. (100MM.)
RETAINING WALL
COLUMNS,BEAMS & 3000 PSI(210KG/CM )2 3/4 IN. (19MM.) 4 IN. (100MM.)
SUSPENDED SLABS

3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 (PNS 49) GRADE 40.
FOR DIA. 16 AND SMALLER BARS AND GRADE 60 FOR DIA. 20 AND LARGER BARS.
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE
DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO, UNLESS
OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:

SUSPENDED SLABS ..................................................... 3/4 IN. ( 19 MM. )

SLAB ON GRADE ......................................................... 1 1/2 IN. ( 38 MM. )


WALLS ABOVE GRADE ................................................. 1 IN. ( 25 MM. )
6@100, REST@200 TO CL
BEAM STIRRUPS AND COLUMN TIES .......................... 1 1/2 IN. ( 38 MM. )

WHERE CONCRETE IS EXPOSED TO EARTH WALL REINFORCING AT R.C.


BUT POURED AGAINST FORMS ................................... 2 IN. ( 50 MM. )
COLUMN/WALL WALL REINFORCING AT CORNER WALL REINFORCING AT INTERSECTION
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH ........................................... 3 IN. ( 75 MM. )
NOTE : BEAM:SPACED @ 3000 MM OC
6. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND IN COLUMN:SPACED @ 4000 MM OC
ACCORDANCE WITH TABLE 1 (TABLE OF LAP SPLICE AND ANCHORAGE LENGTH) UNLESS OTHERWISE SPECIFIED ON PLAN
UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED
WHENEVER POSSIBLE.
W=1200 MAX. W=1200 MAX.
7. ALL ANCHOR BOLTS, DOWELS,HOOKS AND OTHER INSERTS, SHALL BE PROPERLY (FOR W=1200 PLUS - CONSULT STRUCTURAL ENGR.)
POSITIONED AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. (FOR W=1200 PLUS - CONSULT STRUCTURAL ENGR.)
200 200
STIFF. BEAM
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, & COL. DET. FOR COL. BAR SPLICES
STOOLS, EQUIPMENTS, AND MECHANICAL BASES THAT ARE REQUIRED BY THE SEE TABLE OF MIN. LAP
ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
SPLICE LENGTH OF COL.
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN (7) REINFORCEMENT
CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP,
FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED METHODS.
10. STRIPPING OF FORMS AND SHORES:
FOUNDATION ................................................................ 24 HRS.
CON. HOR. REINF.
SUSPENDED SLAB EXCEPT WHEN CONTINUOUS HORIZONTAL
ADDITIONAL LOADS ARE IMPOSED ............................. 8 DAYS REINFORCEMENTS

WALLS ......................................................................... 18 HRS. DOOR


OPENING
BEAMS ........................................................................ 14 HRS. 1. AT ANY LEVEL NO MORE THAN
VERTICAL BARS ALTERNATE BARS SHOULD BE
SPLICED.
C. FOUNDATION
2. MIN. DISTANCE BETWEEN TWO
1. FOUNDATION IS DESIGNED FOR AN ASSUMED SOIL BEARING CAPACITY OF 96 KPa (2000 psf). ADJACENT BAR SPLICES SHALL
BE 600mm.
2. FOUNDATION SHALL REST ON NATURAL SOIL. UNLESS OTHERWISE NOTED BY L
THE ENGINEER, NO PART OF THE FOUNDATION SHALL REST ON FILL. CHB WALL
3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION L/4
HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN SBC. FLOOR LINE CHB VERT. REINF. (SEE
SCHED. OF REINF.) TOP BARS @ SUPPORT (CONT.)
DOOR OPENING ELEVATION REQ'D. BOT. BARS @ SUPPORT
1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT CHB VERT. REINF. DOWELS
NOT TO EXCEED 80 PCF. FOR LOAD BEARING TYPE CONCRETE BLOCKS, A WINDOW OPENING ELEVATION (TO MATCH VERT. REINF.)
1. D = USE MAXIMUM COLUMN DIMENSION,
MINIMUM COMPRESSIVE STRENGTH OF 6.90 MPA. (1,000 PSI) SHALL BE DEVELOPED. 1/6 CLEAR HEIGHT OR 18" (450mm)
WHICHEVER IS GREATER.

SUSPENDED SLAB 2. NUMBER OF HOOP TIES SAME AS PER


WALLS, AND EACH SIDE OF OPENINGS AS SHOWN. COLUMN TIES SCHEDULE.
EXTRA BOT. BARS 3. ALL CONCRETE REINFORCEMENT DETAIL
3. LINTEL BEAMS OR LINTEL BLOCKS SHALL BEAR AT LEAST 8 INCHES (200 MM.) @ MIDSPAN
0.165L SHOULD BE DONE IN ACCORDANCE WITH
ON EACH SIDE OF MASONRY WALL OPENING. LINE OF DEPRESSED SLAB @
SPLICE ACI DETAILING MANUAL 1980 PUB SP-66
BOT. BARS
PROPOSED PIPE SLEEVE LOCATIONS OTHER SIDE WHEN REQUIRED @ MIDSPAN
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
2d (NO PIPE SLEEVE SHALL BE SCH. 40 G.I. PIPE SLEEVE 0.22L
COLUMN ELEV. SHOWING
EXTRA TOP BARS
ALLOWED W/IN THIS ZONE (TYP.)) WALL BASE REINFORCING AT @ SUPPORT DOWELS AND TIES SPACING DETAIL
WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT 2 - EXTRA STIR. EA. SIDE
OF SLEEVE FLOOR W/ DEPRESSION
COLUMN LAP SPLICE AND EXT.
TOP BARS FACE OF
SUPPORT
GIRDER TO COLUMN CONNECTION DETAIL

CHB WALL TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES :


5. BLOCK WALL REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS
WHERE SPLICED, HORIZONTAL/VERTICAL DOWELS FROM FOOTINGS, COLUMNS/WALLS OR CHB VERT. REINF. (SEE
SCHED. OF REINF.) LAP SPLICE (m) MIN. LAP SPLICE
SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS OR A BAR ANCHORAGE STANDARD HOOK UNIT
BOT. BARS (TYPICAL) LENGTH OF COL. REINF.
(m)
MINIMUM OF 400 mm. WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL FACE OF STIR. AS SCHED. DIAMETER LENGTH TENSION BAR COMP. BAR WEIGHT INDIVIDUAL BARS1
REINFORCEMENTS OF WALL. SUPPORT
4d(minimum) SECTION CHB VERT. REINF. DOWELS
(mm) (m)
90 DEG 180 DEG 135 DEG TOP BAR BOT BAR TOP BAR BOT BAR
(Kg/m)
W/ TIES W/ SPIRAL
L/4 L/2 L/4 (TO MATCH VERT. REINF.)
BAR BUNDLE.
6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY LIMIT LOCATION OF PIPE SLEEVE 10 0.60 0.15 0.13 0.10 0.42 0.30 0.42 0.30 0.617 0.30 0.30
FILLED WITH CONCRETE GROUT. (REFER TO SPECIFICATIONS) L 12 0.60 0.20 0.15 0.12 0.42 0.30 0.42 0.30 0.889 0.30 0.30

SUSPENDED SLAB 16 0.60 0.25 0.18 0.14 0.73 0.52 0.87 0.62 1.580 0.52 0.47
PIPE SLEEVE THRU BEAM DETAIL 20 0.60 0.30 0.20 0.20 0.91 0.65 0.78 2.469 0.65 0.58
SPACING OF 4.00 METERS. SHALL BE 600 MM.
25 0.68 0.40 0.28 0.26 1.15 0.82 1.40 1.00 3.858 0.80 0.73
WALL BASE REINFORCING AT 28 0.86 0.48 0.38 1.45 1.03 1.53 1.09 4.840 0.90 0.82
REINFORCEMENT.
REST @ 150 TO C.L. (TYPICAL) HAVING A MAXIMUM SPACING OF 3.00 METERS. FLAT FLOOR 32 1.12 0.56 0.43 1.90 1.35 1.74 1.24 6.327 1.03 0.93
36 1.43 0.61 0.48 2.40 1.70 2.00 1.40 8.000 1.20 1.05

"SPECIFICATIONS AND CONTRACTS" BY MAX B. FAJARDO HOOKS.

ARCHITECT STRUCTURAL ENGINEER REVISIONS SHEET CONTENTS SHEET NO.


AS-BUILT PLAN
CONSTRUCTION NOTES
HOTEL VIDA AUXILIARY BUILDING
club 3 asia projects inc. M.A. ROXAS HIGHWAY, CSEZ, CLARKFIELD, PAMPANGA
STRUCTURAL DETAILS S3
ARCH. REYNOLD S. BASILIO
architects . interior designers . construction manager . builders
WIDUS INTERNATIONAL LEISURE, INC.,
2nd floor unit, 101- C FRDC Bldg. Greenfields Square,
Mc Arthur Highway, Sindalan City of San Fernando tel. no. 045-8614390
REG. NO.
PTR.
OO15407
2167316
T I N . 207 557 391000
DATE ISS. JAN. 22, 2009
REG.NO.
PTR.NO
TIN.
DATE ISS. OWNER
6

You might also like