Professional Documents
Culture Documents
INSTRUCTIONS:
1. It is intended to ensure continuous serviceability of aircraft to make the intended flight.
2. It is mandatory to carry out all the items and follow this task card during Transit/Pre-Flight Check and not to go
by memory.
3. It includes EDTO transit items and shall be carried out by EDTO qualified personnel in accordance with
applicable approved Air India EDTO Manual.
4. This complies with CAR M Subpart C ‘Continuing Airworthiness M.A. 301 and AMC M.A. 301(1) (pre-flight
inspection.)
5. “Critical task” are tasks, if improperly done, may lead to an un-airworthy condition and/or have an adverse
effect on operational safety.
6. “Satisfactory” means that the item has been checked for security, cleanliness, corrosion, deterioration, wear,
cracks, dents, scores, cuts, distortion, visual evidence of bowing, overheating, freedom from obstruction, leaks,
locking and any other damage.
7. Flight Dispatch will advise the EDTO routes.
8. Ensure that consumable fluids, gases etc. uplifted prior to flight are of the correct specification, free from
contamination, and correctly recorded.
S/No. DESCRIPTION
1. PRELIMINARY ITEMS:
Ensure that following tasks are accomplished:
A. All ground equipment positioned is in proper condition, properly locked & secured.
B. Wheel chocks & safety cones are in position.
C. Place towing lever in “Towing Position” and install pin (If aircraft towing or P/Back required).
D. Install engine covers, pitot, static covers, and landing gear locks & pins in case of adverse weather
warning or aircraft halt exceeds 2 hours.
2. GENERAL
A. Review PDR, DMR, CDR, PFR & AIDS (if generated) reports. Review STATUS on Lower ECAM. Take
action as necessary.
B. Check Validity of Layover Check/Weekly Check/400 FH check/higher inspection Schedules.
C. In case of ACARS inoperative, take print outs of AIDS Reports (01, 02 & 04).
D. Ensure that arrival, departure, “Aircraft hours/cycles since new”, and delay details are recorded in
the TLP.
E. Check Technical Logbook to ensure that the intended flight is not affected by any outstanding
deferred defects. Ensure that all required maintenance has been accomplished and that no required
maintenance action shown in the maintenance statement is overdue or will become due during the
flight.
F. Ensure that special operational requirements (EDTO, RNP RVSM, 8.33 KHz VHF channel spacing etc.)
if any, for the scheduled flight route are complied with.
G. Prior to departure, remove the pink copy of TLP and retain at station.
3. EMERGENCY EQUIPMENT
Check emergency equipment according to “Emergency Equipment Layout Chart” for condition, security and
presence
4. WALK AROUND INSPECTION
A. Carry out a Walk around inspection of the complete aircraft including engines, cabin and cockpit for
evidence of fuel, oil, hydraulic leaks, obvious damages and defects which may have occurred during
the last flight and raise DRS/NRC for corrective action taken if any. Ensure visible aircraft components