GE Power

LMS100
Power Plants
If it’s efficiency you’re looking for, search no more. Our LMS100 aeroderivative gas turbine is the highest simple cycle
efficiency gas turbine in the world. Its intercooled gas turbine system provides rapid startup, with an 8-minute start
to full load and emergency ramp speeds of up to 500 MW/minute. In high renewable penetration areas like California,
our LMS100 gas turbines are providing 2.8 GW of generation with more than 1,400 MW/minute of ramping capability.

117 MW SIMPLE CYCLE OUTPUT


>44% SIMPLE CYCLE EFFICIENCY
Capability Versatility Sustainability
Desalination capability from Available dual fuel capability Zero water option and lowest CO2
waste heat off intercooler can with fuel switching at full power emitting simple cycle gas turbine
generate up to 3,000+ gallons
per minute

gepower.com
117 MW SIMPLE CYCLE OUTPUT
>44% SIMPLE CYCLE EFFICIENCY
Frequency 50
LMS100
60
A spinning
ISO Base Rating (MW) 118 118
reserve can be
Gas Turbine Rating

Gross Heat Rate (Btu/kWh, LHV) 7,833 7,628


Gross Heat Rate (kJ/kWh, LHV) 8,265 8,048
Gross Efficiency (%, LHV)
Exhaust Temperature (°F)
43.6%
824
44.7%
810
generated by
Exhaust Temperature (°C) 440 432
Exhaust Energy (MM Btu/hr)
Exhaust Energy (MM kJ/hr)
377
398
361
380
combining an
Compression Pressure Ratio (X:1) 42.5 42.5
GT Generator Type (Cooling) Air Air LMS100 and
Gas Turbine Parameters

Number of Compressor Stages 20 20


Number of Turbine Stages
GT Turndown Minimum Load (%)
9
15%
9
15% a clutch. The
GT Ramp Rate (MW/min) 50 50
NOx (ppmvd) at Baseload (@15% O2)
CO (ppm) (@15% O2)1
25
95/250
25
95/250
synchronous
Wobbe Variation (%) +/-20% +/-20%
Startup Time (Hot, Minutes)
SC Net Output (MW)
8
117
8
117
condensing
Performance
SC Plant

SC Net Heat Rate (Btu/kWh, LHV) 7,925 7,718


SC Net Heat Rate (kJ/kWh, LHV) 8,362 8,143 that it creates
SC Net Efficiency (%, LHV) 43.1% 44.2%

requires zero fuel


CC Net Output (MW) 142 140
CC Net Heat Rate (Btu/kWh, LHV) 6,540 6,438
Performance
1x1 CC Plant

CC Net Heat Rate (kJ/kWh, LHV) 6,900 6,793


CC Net Efficiency (%, LHV)
Plant Turndown – Minimum Load (%)
52.2%
13%
53.0%
13% use and enables
Ramp Rate (MW/min) 50 50
Startup Time (Hot, Minutes)
Bottoming Cycle Type
30
2PNRH
30
2PNRH
an 8-minute
Condenser Type Once-Through Once-Through
1x1 CC Power Plant

Condenser Pressure (in.Hga) 1.2 1.2 return from


Features

HP Throttle Press. (psia/bar) 850/58.6 850/58.6


HP Throttle Temp. (°F/°C) 779/415 766/408
ST Configuration (Type) Condensing Condensing reactive to 100%
GT Generator Type (Cooling) Air Air

real power
ST Generator Type (Cooling) Air Air
CC Net Output (MW) 284 281
CC Net Heat Rate (Btu/kWh, LHV) 6,511 6,411
Performance
2x1 CC Plant

CC Net Heat Rate (kJ/kWh, LHV)


CC Net Efficiency (%, LHV)
6,870
52.4%
6,764
53.2%
generation.
Plant Turndown – Minimum Load (%) 6% 6%
Ramp Rate (MW/min) 100 100
Startup Time (Hot, Minutes) 30 30
Bottoming Cycle Type 2PNRH 2PNRH
Condensor Type Once-Through Once-Through
2x1 CC Power Plant

Condenser Pressure (in.Hga) 1.2 1.2


Features

HP Throttle Press. (psia/bar) 850/58.6 850/58.6


HP Throttle Temp. (°F/°C) 779/415 766/408
ST Configuration (Type) Condensing Condensing
GT Generator Type (Cooling) Air Air
ST Generator Type (Cooling) Air Air

1.) Ramp rates are Fast Ramp via AGC.


NOTE: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific
conditions and fuel.All performance figures based on Once-Through condenser with 1.2” Hga condenser pressure.
gepower.com
2PNRH = Two pressure, non-reheat; 3PRH = Three pressure, reheat.
© 2017 General Electric Company.
All rights reserved.

GEA32933 (11/2017)