3D VIEW
DRAWING LIST
IMPORTANT NOTES: DWG NO. DRAWING NAME
INSTALLATION.
M-07 PROPOSED BASEMENT DOMESTIC WATER LAYOUT
ALL DUCTWORK RUNNING IN UNHEATED SPACES SHALL BE INSULATED WITH
MIN R-12.
M-08 PROPOSED GROUND FLOOR DOMESTIC WATER LAYOUT
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL M-12 PROPOSED SECOND FLOOR SANITARY LAYOUT
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
GENERAL MECHANICAL CONDITIONS BALANCING AFTER CONSTRUCTION COMPLETED. SUBMIT THE AIR BALANCING REGARDING FIRE SPREAD PROPERTIES. INCLUDE FOR ALL NECESSARY ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
REPORT FOR ENGINEERS REVIEW. 9. THERMAL INSULATION SHALL BE 1-1/2" THICK BLANKET MINERAL FIBER OR 1" MODIFICATIONS AND TREATMENTS OF THE ABOVE MATERIALS AS REQUIRED TO CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
1. ALL DRAWINGS SHALL BE STUDIED BEFORE BID SUBMISSION. THICK RIGID MINERAL FIBERBOARD FOR WARM AIR DUCTS AND DUCTS BETWEEN MEET SUCH REQUIREMENTS IN FORCE AT TIME OF BIDDING.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
2. REMOVE ALL EXISTING DUCTWORK, DIFFUSERS AND FLEX CONNECTION AS OUTSIDE WALLS AND MIXING PLENUMS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
2. INSTALLATION OF MATERIALS SHALL BE IN COMPLIANCE WITH ALL APPLICABLE SHOWN ON THE DRAWING. 13. ALL COLD WATER PIPING SHALL BE COVERED WITH 1/2" THICK FIBERGLASS LOW BUILDER, AND ARCHITECT BEFORE INSTALLATION.
PROVINCIAL AND FEDERAL CODES, ONTARIO ELECTRICAL SAFETY CODES AND 10. THERMAL INSULATION FOR COLD AIR DUCTS SHALL BE 1-1/2" THICK RIGID PRESSURE PIPE COVERING AND FIRE RESISTANT VAPOUR BARRIER. ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
MUNICIPAL REQUIREMENTS. 3. CONSTRUCTION AND INSTALLATION OF ALL HVAC WORK TO BE BASED ON INSULATION, OR 2" THICK BLANKET MINERAL FIBRE. ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
ONTARIO BUILDING CODE, ONTARIO FIRE CODE, ASHRAE AND SMACNA. 14. COVER ALL FITTINGS AND ELBOWS TO MATCH ADJOINING INSULATION IN STANDARDS.
3. MAINTAIN LIABILITY INSURANCE TO PROJECT OWNER AND THE CONTRACTOR 11. VAPOUR-RETARDER MEMBRANE SHALL BE INSTALLED WITH INSULATION ON THICKNESS WITH INSULATING CEMENT OF FIBERGLASS AND FINISH WITH
FROM ANY CLAIMS UNDER THE WORKER'S COMPENSATION ACT. HVAC NOTES COLD, DUAL-TEMP AND FRESH AIR AIR SUPPLY DUCTS. ALUMINUM FOIL IN COMPLETE ACCORDANCE WITH THE MANUFACTURER'S REVISION DESCRIPTION DATE
RECOMMENDATIONS.
4. ALL MEASUREMENTS SHALL BE TAKEN FROM BUILDING AND ARCHITECTURAL 1. DUCTWORK SHALL BE CONSTRUCTED ACCORDING TO ASHRAE/SMACNA 12. ACCEPTABLE BLANKET MINERAL FIBER SHALL BE JOHNS MANVILLE MICROLITE 00 ISSUED FOR REVIEW 2022-08-29
DRAWINGS. CONTRACTOR TO REPORT ANY DISCREPANCIES TO THE ENGINEER. STANDARDS. DUCT WRAP TYPE 100 OR EQUIVALENT. 15. DRAINAGE WASTE AND VENT PIPING 01 ISSUED FOR PERMIT 2022-11-14
02 REISSUED FOR PERMIT 2024-04-02
5. ALL MATERIALS SHALL BE BRAND NEW AND IN COMPLIANCE WITH CSA AND CEC 1. ALL DUCT SIZES LISTED ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. 13. ACCEPTABLE RIGID MINERAL FIBERBOARD SHALL BE JOHNS MANVILLE 800 MATERIAL AS INDICATED ON DRAWINGS. IF MATERIALS HAVE NOT BEEN INDICATED
REQUIREMENTS. ALL MATERIALS USED SHALL HAVE CSA LABELS. SERIES SPIN-GLASS TYPE OR EQUIVALENT. ON DRAWINGS, THEN INSTALLATION SHALL ADHERE TO THIS SECTION:
2. ALL FLEXIBLE DUCTWORK TO DIFFUSERS SHALL BE ALUMINUM SPIRAL AND NOT
6. ALL EXISTING SERVICES MUST BE MAINTAINED DURING CONSTRUCTION PERIOD. EXCEED 10FT IN LENGTH. 14. SEAL ALL JOINTS WITH ULC LISTED SELF-ADHESIVE INSULATION TAPE FOR - ABOVE GROUND SANITARY LESS THAN 75mm AND VENT SHALL BE TYPE DWV TO
CONTRACTOR TO PROVIDE ALL NECESSARY TEMPORARY LINES, EQUIPMENT, ETC. INDOOR DUCTS AND INSULATION. ASTM B306 WITH CAST BRASS OR WROUGHT COPPER FITTINGS TO AN/CSA B125
TO CARRY OUT THE ABOVE. 3. SEAL ALL LOW PRESSURE DUCTS (<2IN.WC.) BASED ON SMACNA SEAL CLASS 'C' OR PVC TO CAN/CSA-B181.2 OR ABS TO CAN/CSA-181.1.
USING SEALANT OR ALUMINUM TAPE; OR A COMBINATION. 15. USE RIGID INSULATION AND DRYWALL TYPE CORNER BEADS IN AREAS WHERE - JOINTS FOR COPPER TUBE/ PIPE SHALL BE TIN-LEAD(50%Tn-50%Pb) SOLDER
7. IT IS CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE WORKFLOW AND INSULATION IS EASILY SUSCEPTIBLE TO DAMAGE. - JOINTS FOR PVC PIPE SHALL BE SOLVENT WELD TO ATSM D2564
WORKING HOURS WITH OWNER DURING THE INSTALLATION. ANY TYPE OF 4. HIGH PRESSURE DUCTS (=>2IN.WC.) SHALL BE CONSTRUCTED OF FACTORY - JOINTS FOR ABS PIPE SHALL BE SOLVENT WELD TO ASTM D2235
OPERATIONS AND ASSOCIATED WORK SHOULD NOT BE DISRUPTED OR HALTED. FABRICATED, SPIRAL WOUND, GALVANIZED STEEL WITH MATCHING FITTINGS 16. EXTERIOR DUCTWORK INSULATION SHALL BE COVERED BY A .04" THICK - JOINTS FOR PVC PIPE SHALL BE SOLVENT WELD TO ATSM D2564
THERE SHALL NOT BE ANY UNSCHEDULED SHUTDOWNS OR INTERRUPTIONS OF AND SPECIALS TO SMACNA. USE SPLIT TYPE JOINTS WITH SEALANT FOR DUCTS ALUMINUM JACKET (FORMING THE DOUBLE SKIN). ALL LONGITUDINAL SEAMS - JOINTS FOR ABS PIPE SHALL BE SOLVENT WELD TO ASTM D2235
ANY OPERATIONS. FAILURE TO DO SO, WILL RESULT ADDITIONAL COST FOR UP TO 36IN. SHALL BE FORMED ALONG THE BOTTOM. ENSURE THAT ALUMINUM JACKET IS - ABOVE GROUND SANITARY, STORM AND VENT GREATER THAN 75mm SHALL BE
CONTRACTORS. FASTENED WITH SECURE, WATERTIGHT MECHANICAL CONNECTIONS. APPLY CAST IRON TO CAN/CSA-B70 OR PVC TO CAN/CSA-B181.2 OR ABS TO
5. SEAL ALL NEW HIGH PRESSURE DUCTS (=>2IN.WC.) AND HIGH PRESSURE DUCT EXTERIOR GRADE SEALANT AT ALL SEAMS. CAN/CSA-181.1.
8. PROVIDE AND INSTALL ALL BASES, SUPPORTS, SLEEVES, CURBS, AND ETC. MODIFICATIONS TO SMACNA SEAL CLASS 'A' USING SEALANT. - JOINTS FOR CAST IRON SHALL BE HUB AND SPIGOT FOR STORM DRAIN ONLY,
REQUIRED AS PER SPECIFICATIONS AND SCHEDULES. ALL OPENINGS TO BE AIR 17. ACOUSTIC INSULATION SHALL BE PROVIDED WHERE INDICATED ON DRAWINGS AND MECHANICAL JOINT FOR SANITARY ONLY
TIGHT AND SEALED. 6. FLEXIBLE DUCTS (LOW PRESSURE) AND IN ALL RETURN AIR TRANSFER DUCTS. - JOINTS FOR PVC PIPE SHALL BE SOLVENT WELD TO ATSM D2564
PLUMBING SCOPE OF WORK - JOINTS FOR ABS PIPE SHALL BE SOLVENT WELD TO ASTM D2235
9. ALL PIPE WORK MUST BE LINED UP PARALLEL TO OR AT RIGHT ANGLE TO THE 7. NON-COLLAPSIBLE, COATED MINERAL BASE PERFORATED FABRIC TYPE - BURIED SANITARY, STORM AND VENT SHALL BE MINIMUM 75mm CAST IRON TO
BUILDING WALLS. EQUIPMENT MUST BE ACCURATELY SET, PLUMBED AND HELICALLY SUPPORTED BY AND MECHANICALLY BONDED TO STEEL WIRE WITH CAN/CSA-B70 OR PVC TO CAN/CSA-B181.2 OR ABS TO CAN/CSA-181.1
LEVELED. HANGER RODS MUST BE SIMILARLY IN TRUE VERTICAL ALIGNMENT. FACTORY APPLIED FLEXIBLE GLASS FIBRE ACOUSTIC INSULATION AND ENCASED 1. PROVIDE AND INSTALL NEW HOT WATER TANK, HOT WATER RECIRCULATION - JOINTS FOR CAST IRON SHALL BE HUB AND SPIGOT
IN ALUMINUM FOIL AND MYLAR LAMINATE VAPOUR BARRIER. PUMP, SANITARY SUMP PIT PUMP, PUMP, DOMESTIC HOT, RE-CIRCULATION AND - JOINTS FOR PVC PIPE SHALL BE SOLVENT WELD TO ATSM D2564
10. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED TO 860kPa OR 1.5 TIMES COLD WATER PIPE, SUMP PIT, MIXING VALVE, EXPANSION TANK, FLOOR DRAIN, - JOINTS FOR ABS PIPE SHALL BE SOLVENT WELD TO ASTM D2235
SYSTEM OPERATING PRESSURE FOR A DURATION OF 4 HRS UNLESS OTHERWISE 8. DO NOT USE FOR HIGH PRESSURE SYSTEMS. CLEANOUT, HOSE BIB, FLOOR MOUNTED, KITCHEN SINK, LAVATORY, CEILING
INDICATED; TEST, BALANCE AND ADJUST ALL AIR SYSTEMS TO OBTAIN THE AND UNDER GROUND SANITARY LINE WITH ALL ASSOCIATED AND BACK FLOW 20. PROVIDE TRAP PRIMERS WHERE REQUIRED AS PER ONTARIO BUILDING CODE.
DESIGN QUANTITIES. SUBMIT AIR SYSTEMS TEST AND BALANCE REPORT TO THE 9. FOR LOW PRESSURE SYSTEM: ELBOWS SHALL HAVE RADIUS OF NOT LESS THAN PREVENT.
LANDLORD, CONSULTANT, AND OWNER'S CO-ORDINATOR. INDICATE ALL TEST THE THE DUCT WIDTH. BARBER-COLEMAN "AIRTURNS", HART & COOLEY 21. PROVIDE VENTING WHERE REQUIRED AS PER ONTARIO BUILDING CODE.
RESULTS INCLUDING ENTERING AND LEAVING AIR TEMPERATURES. THIS WORK "DUCTURNS" TURNING VANES OR DUCTMATE TURNING VANES SHALL BE 2. THE WORK UNDER THIS SECTION SHALL INCLUDE ALL LABOR, MATERIALS,
SHALL BE PERFORMED BY AN APPROVED TESTING AND BALANCING PROVIDED IN ELBOWS OF LESSER RADIUS IN ALL DUCTWORK. PLANT, TOOLS, TRANSPORTATION, AND TESTING OF PLUMBING AND DRAINAGE 22. ALL INSTALLED PIPING SHALL BE HYDRAULICALLY TESTED AS SPECIFIED HEREIN
CONTRACTOR. SYSTEMS. THE WORK SHALL BE LEFT COMPLETE AND IN A SATISFACTORY OR AS REQUIRED BY THE APPLICABLE PLUMBING CODE TO THE SATISFACTION OF
10. FOR HIGH PRESSURE SYSTEM: SMOOTH RADIUS AND/OR 5-PIECE (FOR 90°), OPERATION. THE WORK GENERALLY CONSISTS OF, BUT IS NOT LIMITED TO THE THE PLUMBING INSPECTOR AND THE ENGINEER. ALL TESTS SHALL BE DONE
11. CONTRACTOR TO ENSURE THAT BACKFLOW PREVENTER IS INSTALLED AT THE 3-PIECE (FOR 45°) WITH CENTRELINE RADIUS AT 1.5 X DIAMETER. USE 45° FOLLOWING: PRIOR TO PIPE COVERING OR INSULATION.
CONNECTION OF WATER PIPE TO THE EXISTING MAIN DOMESTIC WATER PIPE. CONICAL TRANSITIONS FOR BRANCH CONNECTIONS.
- ALL PLUMBING AND DRAINAGE SYSTEMS. 23. HORIZONTAL RUNS OF ROOF DRAINAGE PIPING TO BE INSULATED AS PER
12. NO OPEN FLAMES OR WELDING IS PERMITTED WITHIN THE BUILDING WITHOUT 11. SHEET METAL CONTRACTOR TO BALANCE THE AIR SYSTEMS TO ACHIEVE THE - ALL COLD/HOT DOMESTIC WATER PIPING, VALVES, AND INSULATIONS. PARAGRAPHS 17 TO 21 ABOVE EXCEPT THICKNESS OF INSULATION SHALL BE 1".
WRITTEN PERMISSION BY THE OWNER AND THE CONSULTANT. AIRFLOW SHOWN. ACCEPTANCE OF BALANCING AND REPORT WILL BE SUBJECT - ALL MISCELLANEOUS PLUMBING WORK AS SPECIFIED AND AS SHOWN ON
TO ON SITE MEASUREMENT AND/OR VERIFICATION OF THE REPORT BY THE DRAWINGS. 24. IT IS THE OWNER'S RESPONSIBILITY TO CONFIRM THE AVAILABLE "RESIDUAL"
13. ALL DISSIMILAR METALS SHALL BE SEPARATED USING GASKET AND INSULATED ENGINEER. WATER PRESSURE PRIOR TO START OF ANY WORK. CONTRACTOR TO NOTIFY THE
WASHERS OR WATTS " DI-ELECTRIC" FITTINGS. PLUMBING NOTES OWNER IF THE AVAILABLE PRESSURE IS NOT ADEQUATE TO SERVICE THE
12. PROVIDE AND INSTALL MINIMUM [19]mm THICK NSN ELASTOMERIC PADS W/ PRESSURE SENSITIVE EQUIPMENT. IF WATER PRESSURE EXCEEDS 80 PSIG A
14. SUBMIT 4 COPIES OF SHOP DRAWINGS AND PRODUCT DATA FOR THE ENGINEER MOUNTS UNDER FLOOR MOUNTED HVAC EQUIPMENT AS PER MANUFACTURER 1. THE DRAWINGS INDICATE THE APPROXIMATE LOCATION OF THE EXISTING PRESSURE REGULATING VALVE SHALL BE PROVIDED AT THE WATER LINE
REVIEW COVERING ALL RELEVANT DETAILS AND DIMENSIONS. RECOMMENDATIONS. PIPING AND OTHER SERVICES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENTERING TO THE BUILDING.
VERIFY THE EXACT LOCATION ON SITE.
15. KEEP ACCURATE RECORD OF "AS-BUILT" DRAWINGS AND SUBMIT AS-BUILT 13. PROVIDE AND INSTALL [NEOPRENE][SPRING W/ ELASTOMERIC WASHER][SPRING 25. THE PLUMBING CONTRACTOR SHALL CLEAN , FLUSH, AND DISINFECT ALL
DRAWINGS IN CAD FORMAT TO ENGINEERS BEFORE FINAL CERTIFICATE OF W/ ELASTOMERIC ELEMENT] HANGERS FOR CEILING SUSPENDED EQUIPMENT, 2. ALL DOMESTIC WATER PIPING SHALL BE TYPE 'M' COPPER WITH CAST BRONZE COLD/HOT PIPING AND ALL FIXTURES PRIOR TO COMPLETION OF WORK.
COMPLETION. BURIED SERVICES MUST BE DIMENSIONED. DUCTWORK AND ACCESSORIES.(USE NEOPRENE FOR LOW FREQUENCY/HIGH OR WROUGHT COPPER SOLDER TYPE FITTINGS OR EQUAL TO BUILDING 26. VENTS THROUGH ROOF TO BE LOCATED 15' MINIMUM AWAY FROM ALL OUTSIDE
AMPLITUDE APPLICATIONS. USE SPRING W/ ELASTOMERIC WASHER FOR HIGH STANDARDS. AIR INTAKES.
16. ALL DEFICIENCIES MUST BE ADDRESSED AND RESOLVED, BALANCING REPORTS FREQUENCY/LOW AMPLITUDE APPLICATIONS. USE SPRING W/ ELASTOMERIC
AND DATA BOOK TO BE SUBMITTED, SYSTEM TO BE READY FOR OPERATIONS, ELEMENT FOR HIGH FREQUENCY/HIGH AMPLITUDE APPLICATIONS.) 3. SOLDER JOINTS IN COPPER PIPE WITH A BLOWTORCH. LEAD SOLDER IS NOT 27. PROVIDE SADDLES AND SHIELDS FOR SUPPORT OF INSULATION PIPING TO
PROVIDE AND INSTALL ALL TAGS, CHARTS AND NAMEPLATES. COMPLETE SPARE PERMITTED. PREVENT CRUSHING.
PARTS TO BE PROVIDED, ALL FIXTURES AND EQUIPMENT TO BE CLEANED AND 14. BALANCING DAMPERS SHALL BE MANUALLY OPERATED OPPOSED BLADE OR
CONTROL SYSTEMS TO BE OPERATIONAL. SPLITTER TYPE. SPLITTER DAMPERS SHALL BE COMPLETE WITH CONTROL ROD, 4. JOINTS FOR GALVANIZED PIPE TO COPPER PIPING SHALL BE MADE USING 28. ALL FLOOR AND FIRE RATED WALL PENETRATIONS SHALL BE SEALED WITH THE
PIVOT BRACKET AND BALL JOINT FITTING WITH LOCKING SETSCREW. APPROVED TYPE FITTINGS TO RETARD THE GALVANIC CORROSION OF THE TWO SAME LEVEL RATE AS OF THE FIRE RATED FLOOR OR WALL. REMOVE UNUSABLE
17. CO-OPERATE WITH ALL TRADES INSTALLING EQUIPMENT WHICH MAY AFFECT DISSIMILAR METALS. MATERIAL; BACK FILL WITH STABILIZED FILL AND MECHANICALLY COMPACT.
THE MECHANICAL WORK AND ARRANGE THE WORK IN PROPER RELATION WITH 15. SPLITTER DAMPERS SHALL BE INSTALLED ON ALL BRANCH DUCT CONNECTIONS
EQUIPMENT INSTALLED UNDER ALL DIVISIONS OF THE CONTRACT FOR THE (OR TAKE-OFFS) FROM DUCTS. 5. INSTALL ALL DRAIN PIPING WITH REQUIRED FITTINGS AS SHOWN ON
SATISFACTORY COMPLETION OF THE JOB. CO-ORDINATE WITH TENANT'S DRAWINGS. HORIZONTAL PIPING SHALL BE PITCHED ON AN EVEN GRADE OF
INTERIOR DESIGN PLANS AND REFLECTED CEILING PLAN. 16. OPPOSED BLADE DAMPERS SHALL BE USED FOR ALL DIFFUSER/GRILLE NOT LESS THAN 1/8" PER FOOT RUN. TURNS SHALL BE MADE WITH LONG RADIUS
BALANCING DAMPERS (WHERE INDICATED). BENDS OR 1/8 BENDS AND FITTINGS, AND 45 DEGREE ELBOWS.
18. PROVIDE WHERE SHOWN AND/OR REQUIRED BY SITE CONDITIONS, ALL ACCESS
DOORS COMPATIBLE WITH CEILING/WALL TYPES AND FINISHES. MARK IN AN 17. FIRE DAMPER (FRD) SHALL BE CURTAIN TYPE WITH 135°F FUSIBLE LINK SUITABLE 6. NO BULLHEADED TEES SHALL BE USED ON WATER PIPING.
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
APPROVED MANNER, T-BAR CEILING TILES WHICH ARE USED FOR ACCESS. FOR HORIZONTAL OR VERTICAL INSTALLATION, 1 ½ HR ULC RATED (AS PER
PROVIDE MILCORE, LEHAGE, OR APPROVED EQUAL ACCESS DOORS. IN ADDITION, ENCLOSURE FIRE RESISTANCE RATING). 7. ALL VALVES SHALL BE CRANE, JENKINS, NEWSMAN HATTERSLEY OR EMCO. NO SUPPLY AIR DUCT RISER (UP) S/A SUPPLY AIR
PROVIDE ACCESS DOORS TO ALL EXISTING BUILDING SYSTEMS CLEANOUTS ON OTHER VALVES MAY BE USED WITHOUT THE WRITTEN PERMISSION OF THE RETURN/EXHAUST AIR DUCT RISER (UP)
MECHANICAL ENGINEER
R/A
VERTICAL STACKS, BACKWATER VALVES AND CEILING SUSPENDED EQUIPMENT. 18. FRD SHALL BE RUSKIN MODEL DIBD2 STYLE B (OR EQUAL FOR DUCT HEIGHTS ENGINEER. VALVES SPECIFIED HEREINAFTER SHALL BE READ IN CONJUNCTION RETURN AIR
PROVIDE MINIMUM SIZE OF CEILING ACCESS OF 4 SQUARE FEET. NOT EXCEEDING 305mm, AND DIBD2 STYLE A (OR EQUAL) FOR DUCT HEIGHTS WITH THE PLANS. SUPPLY AIR DUCT RISER (DOWN)
O/A OUTDOOR AIR
OR HIDDEN DIFFICULTIES WILL NOT BE ACCEPTED. REQUIRED. GLOBE VALVES TO BE USED AT END OF SERVICE LINE. SUPPLY AIR DIFFUSER RTU ROOFTOP UNIT
20. COMBINATION FIRE AND SMOKE DAMPER (FSD) SHALL BE 1½ HR ULC RATED AHU AIR HANDLING UNIT
OPTIMAL ENGINEERING INC INFO@OPTIMALENG.CA
20. CONTRACTOR TO COORDINATE WITH OWNER FOR ANY SHUTDOWN OF WITH [120][24]V ELECTRONIC ACTUATOR [C/W 120V/24V TRANSFORMER]. 10. ALL VALVES SHALL BE SUITABLE FOR 200 P.S.I. WORKING PRESSURE AND UP TO RETURN AIR GRILLE
FCU FAN COIL UNIT 7030 WOODBINE AVE, UNIT 500 WWW.OPTIMALENG.CA
EXISTING SERVICES. ELECTRONIC ACTUATOR SHALL BE FACTORY INSTALLED BY DAMPER AND INCLUDING 2-1/2" SIZE SHALL BE ALL BRONZE. LARGER SIZES SHALL HAVE (647) 877 4787
MARKHAM, L3R 6G2
MANUFACTURER. FSD SHALL BE RUSKIN MODEL FSD60-II OR EQUIVALENT. IRON BODIES AND BRONZE TRIM. TRANSFER AIR GRILLE MUA MAKEUP AIR UNIT
21. ALL FIRE ALARM BYPASSES AND FIRE WATCHES ARE THE RESPONSIBILITY OF THE 11. ALL BRONZE GATE VALVES UP TO AND INCLUDING 2-1/2" SIZE SHALL BE JENKINS
VAV VARIABLE AIR VOLUME UNIT
MECHANICAL CONTRACTOR. THERMAL INSULATION FOR DUCTS FIG. #470 OR CRANE #430. GLOBE VALVES SHALL BE JENKINS #106 OR CRANE #7. FIRE DAMPER
STAMP TRUE NORTH
BALANCING DAMPER UH UNIT HEATER
22. ALLOW FOR RELOCATION, REMOVAL AND RE-INSTALLATION OF THE EXISTING 1. BLANKET OR RIGID THERMAL INSULATION ON INDOOR DUCTS SHALL BE 12. ALL VALVES ON COPPER PIPE SHALL BE BRONZE SOLDER JOINT GLOBE VALVES,
PROVIDED AND INSTALLED AS FOLLOW UNLESS OTHERWISE INDICATED. NON-RISING STEM FOR 150 P.S.I. WATER AND SHALL BE CRANE #1310 OR FH
HANGING RODS TO INSTALL THE DUCT WORK AS REQUIRED. DIFFUSER/REGISTER/GRILLE TAG
FAN HEATER
23. CONTRACTOR TO RETAIN BASE BUILDING FIRE ALARM CONTRACTOR FOR ANY 2. INSULATE FULL LENGTH OF FRESH AIR SUPPLY DUCTS. VAV BOX TAG
HRV HEAT RECOVERY VENTILATION
WORKS RELATED TO FIRE ALARM SYSTEM INCLUDING TRAINING FOR FIRE ALARM 13. SUPPLY AND INSTALL CLEANOUTS AT THE END OF ALL STRAIGHT RUNS OF
2024-04-02
BYPASS, IF REQUIRED. 3. INSULATE FIRST 10FT OF EXHAUST DUCTS FROM EXTERIOR WALL OR ROOF. DRAINS IN ALL HORIZONTAL BRANCHES, ON STRAIGHT HORIZONTAL RUNS ERV ENERGY RECOVERY VENTILATION
EXHAUST FAN
FIFTY FEET APART, ON EXPOSED OR ACCESSIBLE TRAPS, AND AT ALL POINTS OF FHC FIRE HOSE CABINET
24. NO FIRE ALARM BYPASS TO BE DONE WITHOUT WRITTEN PERMISSION OF 4. INSULATE FULL LENGTH OF SUPPLY AND RETURN DUCTS THAT ARE ROUTED THE SYSTEM WHERE SO INDICATED OR NECESSARY TO REMOVE OBSTRUCTIONS.
THERMOSTAT SM WATER SUB METER
ASSIGNED. THIS IS CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK. CONFINED WITHIN A CONDITIONED SPACE (INCLUDING RETURN PLENUM THICKNESS, PROPERTIES AND METHOD OF APPLICATION EQUAL TO THE PENDANT SPRINKLER
DHW DOMESTIC HOT WATER MECHANICAL SPECIFICATIONS
CEILINGS). INSULATION SPECIFIED SHALL BE EQUALLY ACCEPTABLE.
26. FIRE ALARM BYPASS DOCUMENTATION IS TO BE COMPLETELY FILLED OUT AND
CONCEALED SPRINKLER HWT HOT WATER TANK
AND SYMBOLS
FIRE EXTINGUISHER HWH HOT WATER HEATER
LEFT ON SITE AT THE FIRE ALARM PANEL. 6. ACOUSTICALLY LINED INTERIOR DUCTS NEED NOT TO BE THERMALLY 11. ALL COVERING SHALL BE APPLIED IN A NEAT AND WORKMANLIKE MANNER SO
CO CLEANOUT
INSULATED. THAT THE FINISHED JOB IS UNIFORM IN DIAMETER, SMOOTH IN FINISH, AND FIRE HOSE CABINET PROJECT ADDRESS:
CTE CONNECT TO EXISTING
HVAC SCOPE OF WORK ALL LONGITUDINAL SEAMS SHALL BE PLACED SO AS TO BE INVISIBLE. ALL
7. USE RIGID INSULATION AND DRYWALL TYPE CORNER BEADS IN AREAS WHERE CANVAS SHALL BE 6 OZ. PER SQUARE YARD. DEMOLITION
TAD TRANSFER AIR DUCT
10 KENNY COURT, BRAMPTON
1. PROVIDE AND INSTALL FURNACE, HEAT PUMP, AC, CU, HRV, KITCHEN HOOD, INSULATION IS EASILY SUSCEPTIBLE TO DAMAGE. FLOW ARROW BDD BACK DRAFT DAMPER
ELECTRIC BASEBOARD HEATER, EXHAUST FAN, DUCT WORK, SUPPLY DIFFUSERS, 12. ALL COVERINGS, JACKETS, CEMENTS, FINISHES, AND ETC., SHALL BE APPROVED CONTINUATION - -
RETURN GRILLES, BALANCING DAMPER AND VOLUME CONTROL DAMPER AS 8. INSULATION SHALL BE FOIL FACED HAVING FLAME SPREAD RATING OF 25 OR BY AND MEET THE REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION
SHOWN AND SPECIFIED ON DRAWINGS. PROVIDE AIR FLOW ADJUSTMENT AND LESS AND A SMOKE DEVELOPMENT CLASSIFICATION OF 50 OR LESS. FLOOR DRAIN - - PROJECT NUMBER: 2205780
CLEANOUT - - DESIGNED BY: A.Y.
CAP - - CHECKED BY: F.R.
DCW - DOMESTIC COLD WATER
SCALE: N.T.S.
DHW - DOMESTIC HOT WATER
02 M-01
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
EXPANSION TANK SCHEDULE ELECTRIC BASEBOARD HEATER SCHEDULE GENERAL PIPING GUIDELINE: Two Conquest® or Power VTX® Water Heaters
Refer to installation manual for full details. 6∅ THREADED BALL VALVES
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
VALVE UNION
TEMPERED TO BUILDING
BASIS OF DESIGN ELECTRICAL DATA DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
PRE-CHARGED MAXIMUM WORKING TANK ACCEPTANCE MAXIMUM MARK NO. LOCATION WATTS MANUFACTURER AND MODELS
MARK NO. LOCATION SERVE SYSTEM VOLUME (GAL) TANK SIZE DIA x L (IN) (V-PH-HZ) LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
PRESSURE (PSI) PRESSURE (PSI) VOLUME @ 12 PSI TEMPERATURE (F) BUILDER, AND ARCHITECT BEFORE INSTALLATION.
USE BALANCED OR REVERSE RETURN PIPING
MANUFACTURER MODEL HOT OUTLET REFER TO VALVE
SUCTION
CHECK VALVE
MIXING MANUFACTURER'S
LINE
IN-LINE CIRCULATOR ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
VALVE PIPING INSTRUCTIONS STRAINER
ECCENTRIC REDUCER
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
EB-01 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL BUILDING
RETURN 20∅ HOSE END BALL VALVE ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
PIPE T&P VALVE TO
BASEMENT DRAIN WITH NO SHUTOFF NOTE: STANDARDS.
ET HWT 01, HWT 02 10 25 150 10 240 10 X 37 THRMXTROL ST-35CL VALVES OR RESTRICTIONS
1 VALVES AND STRAINER TO BE PIPE LINE SIZE AS INDICATED ON SCHEMATIC
MECH. ROOM IN THE LINE;
OR PER LOCAL CODE
REQUIREMENTS.
BUILDING
CIRCULATOR 2 THE PREFERRED POSITION OF THE PUMP, IS TO MOUNT IN A VERTICAL
~5 gpm SECTION OF PIPE. FOLLOW MFR'S DATA FOR HORIZONTAL POSITIONING.
EB-02 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL
TYPICAL IN-LINE CIRCULATOR PUMP n.t.s.
T&P VALVE U/S OF STRUCTURE
REVISION DESCRIPTION DATE
IMPORTANT NOTES: SPRING ISOLATOR
01
DUPLICATE PIPING FOR EASY OBSERVATION BALL VALVE PUMP
- SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA. FOR T&P, DRAIN AND
6∅
ISSUED FOR PERMIT 2022-11-14
CONDENSATE DRAIN EXP.
TANK (1/4")
DRAIN
VALVE
SUCTION CHECK VALVE
ECCENTRIC REDUCER
EB-05 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL LINE
PUMP SCHEDULE
CONCENTRIC REDUCER
STRAINER
NOTE: 20∅ HOSE END BALL VALVE
LIQUID MOTOR DATA BASIS OF DESIGN EB-06 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL CONDENSATE DRAIN LINE FLOOR DRAIN
WITH NEUTRALIZER
MARK NO. LOCATION TYPE SERVE FLOW (GPM) HEAD (FT W.C.) TEMPERATURE (3HP AND LESS UNLESS INDICATED OTHERWISE ON DWGS.)
(F)
HP RPM VOLTAGE PHASE HZ MANUFACTURER MODEL
EB-07 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL 1 HOT WATER TAN S 2 T PI AL ERTI AL IN LINE PU P
- N.T.S. - N.T.S.
HWT 01 AND 1
P BASEMENT MECHANICAL ROOM CIRCULATOR 33 29 36-230 6 115 1 60 GRUNDFOS UPS26-99FC
HWT 02
EB-08 OCCUPIED ATTIC SPACE 2500 240/208-3-60 OULLETE OFM2500 OR EQUAL
IMPORTANT NOTES:
- PROVIDE SUMP PUMP WITH OIL SENSING CONTROL SYSTEM SWITCH AND ALARM PANEL. ALARM PANEL SHALL INCLUDE THE FOLLOWING: IMPORTANT NOTES: MINERAL WALL INSULATION SEAL BOTH SIDES WITH
OIL SMART ALARM SWITCH, LIQUID SMART SENSOR, AUDIBLE LIGHT ALARMS AND DRY CONTACTS, PRESET "ON" AND "OFF" POINTS TO DIFFERENTIATE OIL AND WATER, NEMA 4X WATERTIGHT ENCLOSURE, PUMP TIGHTLY PACKED FOR NON-HARDENING
FULL DEPTH OF WALL WATER PROOF CAULK
HAND-OFF-AUTO SWITCH, 20 FOOT PIGGYBACK ELECTRICAL SUPPLY CORD, ALARM TEST AND SILENCE SWITCHES, 204 SS PROBES, AND UL APPROVED SWITCH. - INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
- PROVIDE 2" DISCHARGE PIPING WITH CHECK VALVE. - SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA.
PIPE
COLD WATER
SUPPLY
METAL PIPE SLEEVE PARTITION
BALL VALVE
FUR 01 FURNACE 80'000 77'600 96 0.7 1263 120-1-60 TRANE S9V2B080U3PSAA OR EQUAL AC 01 TBD ON SITE 1.5 0.7 600 208-1-60 13 TRANE 4TTR3018H OR EQUAL SEALING AND
FINISHED WALL SURFACE
REDUCED PRESSURE
SEAL SLEEVE WITH TIGHTLY
ROOM ANCHORING COLLAR
PACKEDFIBERGLASS OR
METAL PIPE SLEEVE
PARTITION
BACKFLOW PREVENTER
OF BUILDING
BASEMENT BUILDING COAT EXTERIOR SURFACE
WITH TAR COMPOUND
FUR 03 FURNACE 80'000 77'600 96 0.7 1263 120-1-60 TRANE S9V2B080U3PSAA OR EQUAL AC 03 TBD ON SITE 3 0.7 1200 208-1-60 13 TRANE 4TTR3036H OR EQUAL CONTINUOUS WELD
STANDARD WEIGHT STEEL PIPE
BASEMENT
FUR 04 FURNACE 80'000 77'600 96 0.7 1263 120-1-60 TRANE S9V2B080U3PSAA OR EQUAL AC 04 TBD ON SITE 2.5 0.7 1000 208-1-60 13 TRANE 4TTR3030H OR EQUAL PIPE PENETERATION THROUGHT REDU ED PRESSURE BA FLOW
3 T PI AL PIPE SLEE E
ROOM - N.T.S. 4 NON FIRE RATED WALL 5 PRE ENTER
- N.T.S. - N.T.S.
SECOND FLOOR
FUR 05 60'000 58'200 96 0.7 1038 120-1-60 TRANE S9V2B060U3PSAA OR EQUAL AC 05 TBD ON SITE 2.5 0.7 1000 208-1-60 13 TRANE 4TTR3030H OR EQUAL
PRAY ROOM
INSULATION (PLACE
AROUND AND OVER
IMPORTANT NOTES: FAN HOUSING)
IMPORTANT NOTES: ROUND
ROD
DUCT
- INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. - INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
- SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA. - SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA. FAN PIPE CLAMP
(TYP.)
- SPEED SWITCH OF THE UNIT TO BE SET TO THE DESIGN AIRFLOW LISTED ABOVE. HOUSING
UNISTRUT
POWER
CABLE*
WALL
KEEP DUCT DECORATIVE CAP
RUNS SHORT
FLUE
HEAT PUMP (INDOOR UNIT) SCHEDULE HOT WATER TANK
INSULATED PIPE
- INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
- SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA.
HEAT PUMP (OUTDOOR UNIT) SCHEDULE - 18" CLEARANCE ALL SIDE. CHECK LOCAL AND NATIONAL CODES FOR ADDITIONAL CLEARANCE REQUIREMENTS.
- INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
- SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA. KH KITCHEN 370 6 7 120-3.1-60 BROAN RM523004 OR EQUAL
- SPEED SWITCH OF THE UNIT TO BE SET TO THE DESIGN AIRFLOW LISTED ABOVE.
IMPORTANT NOTES:
OPTIMAL ENGINEERING INC INFO@OPTIMALENG.CA
- INSTALLATION TO BE IN ACCORDANCE WITH ONTARIO BUILDING CODE AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
- SIMILAR UNIT CAN BE USED IF DATA OF THE PROPOSED UNIT MATCH THE ABOVE LISTED DATA. 7030 WOODBINE AVE, UNIT 500 WWW.OPTIMALENG.CA
PLUMBING SCHEDULE MARKHAM, L3R 6G2 (647) 877 4787
SANITARY IN (MM) CW IN (MM) HW IN (MM) OUTDOORS
TYPE FIXTURES REMARKS
HRV
STAMP TRUE NORTH
KITCHEN SINK MAXIMUM VENT LENGTH FEET (METERS)
KS 121 (40) 1
2 (15) 1
2 (15)
(SINGLE)
NUMBER OF 90°
ELBOWS
FURNACE
KITCHEN SINK
KS 121 (40) 1
2 (15) 1
2 (15) IPEX CONCENTRIC TERMINATION LOW PROFILE TERMINATION
(2-COMP)
HEAT RECOVERY VENTILATION SCHEDULE
KITCHEN SINK 1 1
KS 2 (50) 2 (15) 2 (15)
(3-COMP) EFFICIENCY EXTERNAL STATIC DESIGN AIRFLOW ELECTRICAL DATA
0 100 (30.0) 100 (30.0) MARK NO. LOCATION MANUFACTURER AND MODELS 2024-04-02
@32 F PRESSURE (IN W.C.) (CFM) (V-A-HZ)
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
100 CFM 67 CFM LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
10"X4" CEILING TYPE ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
SUPPLY REGISTER
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
(TYPICAL)
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
100 CFM
100 CFM 75 CFM
∅6"
∅6"
REVISION DESCRIPTION DATE
75 CFM
A E UP ROO
∅6" 00 ISSUED FOR REVIEW 2022-08-29
01 ISSUED FOR PERMIT 2022-11-14
02 REISSUED FOR PERMIT 2024-04-02
EXER ISE
ROO
∅6"
67 CFM BEDROO
43 CFM
∅6"
∅6"
WR
∅5"
SAUNA
EF
43 CFM ∅5"
8"X8"
SAUNA HEATER
SHOWER
74 CFM
89 CFM
EF
91 CFM
∅6"
12"X8" OR 2X∅8"
A HINE
10X8"
904 CFM
3X14"X5.5" STUD
89 CFM
74 CFM
FUR 04
14"X8"
∅6"
12"X8"
HALLWA HRV 03
26"X10"
FURNA E ROO 1 74 CFM 74 CFM BD 26"X8"
BD
BD FUR 03
26"X10"
26"X10"
FUR 01
22"X8"
102 CFM ∅6"
∅6"
∅6"
24"X8"
∅6"
∅6"
∅6" H A
FUR 02
BD
BD H A
SHAFT
HRV 02 HRV 01 10"X8" ∅6" SHAFT
BD
BD
28"X10"
16"X8"
22"X8"
26"X10"
89 CFM
STORAGE
LOSET
∅6"
43 CFM
∅5"
∅6"
78 CFM
EF
14"X8"
SUPPLY WR
RISER 30"X8" LOW WALL
26"X10" RETURN GRILLE
453 CFM
78 CFM 2X14"X5.5" STUD
THEATRE RETURN
E UIP ENT RISER
28"X10" 14"X8" OR
∅6"
2X∅7"
8"X8" 12"X8"
89 CFM
BD
BD 24"X8" LOW WALL
RETURN GRILLE
340 CFM
∅6"
∅6"
2X14"X5.5" STUD
∅6"
67 CFM
UNEX A ATED
UNEX A ATED
∅6"
∅6"
74 CFM
MECHANICAL ENGINEER
89 CFM
HO E THEATER
67 CFM
∅6"
SITTING AREA
∅6"
∅6"
STAMP TRUE NORTH
89 CFM ∅6" 89 CFM ∅6"
67 CFM 89 CFM
2024-04-02
OLD ROO
DRAWING TITLE:
PROPOSED BASEMENT
HVAC LAYOUT
02
PROJECT ADDRESS:
SCALE: 3/16"=1'
M-03
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
87 CFM 70 CFM LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
87 CFM 87 CFM 70 CFM ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
70 CFM
10"X4" CEILING TYPE ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
SUPPLY REGISTER
(TYPICAL) ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
W TERRA E
REVISION DESCRIPTION DATE
O
LO
PE
BE
N
TO
TO 00 ISSUED FOR REVIEW 2022-08-29
BE
N
PE PRA ER ROO
LO
O
W
01 ISSUED FOR PERMIT 2022-11-14
OGA ROO
02 REISSUED FOR PERMIT 2024-04-02
18"X8" LOW WALL ∅6" 62 CFM
RETURN GRILLE
10"X8"
∅6"
∅6"
∅6"
211 CFM
87 CFM
2X14"X5.5" STUD
∅6"
∅6"
62 CFM
∅6"
∅6"
∅4"
∅4"
84 CFM
∅5"
12"X8"
28 CFM
EF
ENSUITE
GUEST BEDROO
40 CFM
OPEN TO 8"X4" DUCT
MOUNTED SUPPLY ∅5"
ABO E REGISTER (TYPICAL)
28 CFM
JOIST LINER X2
84 CFM
37 CFM
ON RETE
∅5" 84 CFM
∅5" 37 CFM
∅5"
40 CFM
16"X8" LOW WALL BD
RETURN GRILLE SUPPLY
201 CFM RISER
2X14"X5.5" STUD 26"X10"
16"X8"
CU RETURN
28"X10" RISER
28"X10"
84 CFM
AC
06
37 CFM
CONTRACTOR TO CONFIRM LOCATION ∅5" BD
22"X8"
∅5"
OF AC AND CU WITH OWNER AND
37 CFM 14"X8"
∅6"
BUILDER PRIOR TO INSTALLATION. 28"X8" LOW WALL
CONTRACTOR TO ENSURE LENGTH OF RETURN GRILLE
REFRIGERANT PIPING TO BE AS PER 422 CFM ON STEPS
MANUFACTURER'S INSTALLATION AC 2X14"X5.5" STUD
INSTRUCTIONS. 05 LIBRAR
84 CFM
SELF
∅6"
∅6" ∅6" LOSING
DOOR
BD
AC
02 12"X8"
AC
∅5" ∅5" 84 CFM 04
10"X8"
AC
SUPPLY REGISTER
01 (TYPICAL)
∅5" 50 CFM
OPEN TO 84 CFM
AC
03
ABO E
22 CFM
114 CFM IT HEN
∅6"
∅4"
SPI E IT HEN 22"X8" LOW WALL
30"X12" LOW WALL
RETURN GRILLE
RETURN GRILLE
269 CFM
622 CFM
2X14"X5.5" STUD
3X14"X5.5" STUD
JOIST LINER X3
JOIST
∅5"
∅7"
LINER X2 WOOD STEPS AS
PER OB SB 7
KH
KH
22 CFM
WATERFALL
SUPPLY H A
RISER BD
26"X10" SHAFT
20"X8"
∅4"
PANTR 20"X8" 37 CFM ∅5"
139 CFM
2X14"X3.5" STUD
8"X8"
2X14"X5.5" STUD
SER ER
ROO
46 CFM
∅5"
2X14"X5.5" STUD
12"X8" OR GREAT FO ER
2X∅7"
46 CFM
46 CFM
SITTING AREA
∅5"
∅5"
∅5"
∅5"
∅5"
∅5"
∅5"
OID
OID STAMP TRUE NORTH
∅5"
46 CFM 46 CFM
46 CFM 46 CFM
45 CFM
50 CFM
2024-04-02
DRAWING TITLE:
SCALE: 3/16"=1'
M-04
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
63 CFM
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
50 CFM BUILDER, AND ARCHITECT BEFORE INSTALLATION.
50 CFM 63 CFM
63 CFM
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
41 CFM
EF
ENSUITE
REVISION DESCRIPTION DATE
∅5"
∅5" ∅5"
∅5" ∅5"
50 CFM 50 CFM
∅5"
41 CFM
∅5"
41 CFM
10"X8"
BEDROO 2
TERRA E
8"X8"
51 CFM
∅5"
WI
83 CFM
∅4"
∅6"
OPEN TO 33 CFM
BELOW
SEATING AREA
TE
∅5"
R
R
A
41 CFM
E
26"X8" LOW WALL
A
22"X8" HIGH WALL RETURN GRILLE
R
R
RETURN GRILLE 379 CFM
TE
276 CFM PANTR 2X14"X5.5" STUD
2X14"X5.5" STUD
83 CFM 51 CFM
D W
EF
EF
∅4" DRESSING AREA
29 CFM LAUNDR
SITTING AREA
∅5"
41 CFM 51 CFM
37 CFM
∅5"
12"X8"
BELOW 51 CFM
EF ENSUITE
∅6"
∅5"
59 CFM
PRA ROO
20"X8" LOW WALL
22"X10" RETURN GRILLE
10"X8" LOW WALL
RETURN GRILLE HRV 05 249 CFM
FUR 05 2X14"X3.5" STUD
59 CFM ∅5"
14"X3.5" STUD
56 CFM
18"X8"
10"X8" OR
24"X10"
16"X8" HIGH WALL
8"X8" OR ∅6"
∅5"
10"X8" RETURN GRILLE FOR
RETURN GRILLE 36 CFM
16"X8"
PRAYER ROOM.
202 CFM HRV 06 2X∅7"
MECHANICAL EQUIPMENT
2X14"X3.5" STUD 14"X8" WI
WILL BE LOCATED IN A
SEPARATED ROOM.
∅5"
∅5"
∅5"
∅5"
∅5"
30"X10" 20"X10" 12"X8"
83 CFM
∅5"
∅6" 20"X8" HIGH WALL
∅5"
RETURN GRILLE
239 CFM
LINE OF STUD
2X14"X5.5" STUD FUR 06
WALL ABO E
56 CFM
10"X8" 24"X10"
∅4"
ASTER BEDROO 1
ASTER BEDROO 2
16"X8"
35 CFM
EF
83 CFM
12"X8"
∅6"
56 CFM
∅5"
ENSUITE
BEDROO 1
∅5"
EF
33 CFM
∅4"
MECHANICAL ENGINEER
32 CFM
WI
10"X8"
BEDROO 3
WI
∅5"
∅4"
∅6" TERRA E
∅6"
∅6"
OPTIMAL ENGINEERING INC INFO@OPTIMALENG.CA
∅6"
∅5"
∅5"
∅4"
∅4"
GLASS ENTR
61 CFM 79 CFM
EF
93 CFM
7030 WOODBINE AVE, UNIT 500 WWW.OPTIMALENG.CA
SITTING AREA MARKHAM, L3R 6G2 (647) 877 4787
ENSUITE
SITTING AREA
OID
EF
OID OID
STAMP TRUE NORTH
24 CFM 24 CFM
61 CFM 61 CFM
75 CFM 75 CFM
STONE BEN H 51 CFM
OID
2024-04-02
02
DRAWING TITLE:
SCALE: 3/16"=1'
M-05
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
EB-01
EB-02 EB-08
HP
HP
TYP.
2
TYP.
O UPIED
ATTI SPA E
EB-03
EB-07
REFER TO ENG
SPE S
MECHANICAL ENGINEER
OPEN TO
EB-04
EB-06
BELOW
HP
HP
O UPIED
STAMP TRUE NORTH
ATTI SPA E
EB-05
2024-04-02
DRAWING TITLE:
PROJECT ADDRESS:
1. PROVIDE AND INSTALL NEW INDOOR HEAT PUMP UNIT COMPLETE WITH ASSOCIATED
REFRIGERANT PIPING, ELECTRICAL CONNECTION, BRANCH BOX AND HANGERS/SUPPORT.
INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER INSTALLATION INSTRUCTIONS. THE
EXACT LOCATION TO BE COORDINATED ON SITE. REFER TO SCHEDULE FOR DETAILS. 10 KENNY COURT, BRAMPTON
2. PROVIDE AND INSTALL NEW ELECTRIC BASEBOARD HEATER UNIT COMPLETE WITH ASSOCIATED
CONTROLS, ELECTRICAL CONNECTION AND WALL BRACKET. INSTALLATION TO BE IN ACCORDANCE
WITH MANUFACTURE INSTALLATION. THE EXACT LOCATION TO BE COORDINATED ON SITE. REFER
TO SCHEDULES FOR DETAILS.
SCALE: 3/16"=1'
M-06
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
A E UP ROO
REVISION DESCRIPTION DATE
00 ISSUED FOR REVIEW 2022-08-29
01 ISSUED FOR PERMIT 2022-11-14
02 REISSUED FOR PERMIT 2024-04-02
∅21" DHWR UP
EXER ISE
∅21" DHW UP
∅21" DHW UP
∅21" DCW UP
∅21" DCW UP
∅21" DHWR
ROO
BEDROO
∅21" DCW DN
∅21" DHW DN
∅21" DHWR
GROUND FLOOR
∅1" DOMESTIC WATER PLUMING TO SERVE GROUND FLOOR
GROUND FLOOR
∅43" DOMESTIC WATER PLUMING TO SERVE SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
SECOND FLOOR
∅43" DOMESTIC WATER PLUMING TO SERVE SECOND FLOOR
SECOND FLOOR
WR
BASEMENT
BASEMENT
∅1" DOMESTIC WATER PLUMING TO SERVE BASEMENT
∅21" DCW DN
SAUNA
∅21" DHW DN ∅21" DCW UP
10 ∅21" DHWR
SAUNA HEATER
SHOWER
∅21" DCW DN 9
∅21" DHW DN
∅21" DCW DN
∅21" DHWR
∅21" DHWR
TYP. ∅21" DCW DN
∅21" DHW DN
∅121" DCW 5
∅121" DHW DCW
∅43"
∅121" DHWR
UP
UP
UP
DCW
HWT 01 HWT 02 ∅43" DHWR
∅43" DHWR
∅43" DCW
∅43" DHW
∅43"
DHW
P ∅43"
MV DCW FUR R
DHW ∅43" DHW ∅43"
DHW DHW
4 ∅43" R 2
A HINE
∅21" ∅21"
ET
7 6
∅21 "
13
DCW
DHWR
∅43"
DN TYP.
∅21 " DCW DN
DHW
∅43"
∅121" DCW
HALLWA
DCW
∅43"
FURNA E ROO 1 8
TYP. ∅21" DCW DN
DCW
∅1"
DHW
3
∅1" DHWR
∅43"
DHWR
∅1"
2 DHW
W
∅43" H A ∅43"
H A
M
SHAFT
SHAFT DCW
∅43"
∅21" DCW UP
∅21" DHW UP
∅21" DHWR
∅21" DHWR
∅43" DCW UP
∅43" DHW UP
∅43 " DHWR DN
STORAGE
∅21" DCW DN
LOSET
∅21" DHWR
1
WR
11 TYP.
TYP.
∅21" DHWR
∅43" DHWR UP
THEATRE
∅43" DHW UP
∅43" DCW UP
E UIP ENT
∅21" DHWR
∅21" DCW DN ∅21" DCW UP
∅21" DHW DN ∅21" DHW UP ∅21" DHW UP ∅21" DCW UP
∅21" DHW UP
∅21" DCW UP
DCW DHWR UNEX A ATED
∅43" ∅43"
UNEX A ATED
∅21" DHW UP
∅21" DCW UP
∅21" DCW UP
DHW
∅43"
DHWR
∅21"
∅21" DHWR
∅21"
DN
∅43" DHWR UP MECHANICAL ENGINEER
∅43" DHW UP ∅43" DHWR UP
HO E THEATER ∅43" DCW UP ∅43" DHW UP DHWR DHW DCW
∅43" DCW UP ∅43" ∅43" ∅43"
SITTING AREA
12
DRAWING TITLE:
PROPOSED BASEMENT
DOMESTIC WATER LAYOUT
IMPORTANT NOTES: DESIGN NOTES:
7. PROVIDE AND INSTALL HOT WATER RECALCULATION PUMP AND ASSOCIATED VALVES AT THIS APPROXIMATE LOCATION. THE EXACT LOCATION TO BE
THE SIZES OF DOMESTIC WATER PIPES SHOWN ON DRAWING ARE BASED ON THE SIZE OF EXISTING WATER CONNECTION FROM CITY. PLUMBING CONTRACTOR 1. PROVIDE AND INSTALL NEW DOMESTIC COLD AND HOT WATER PIPE AND RE-CIRCULATION WATER PIPE AT BASEMENT CEILING LEVEL. INSTALLATION TO COORDINATED ON SITE. PROJECT ADDRESS:
IS RESPONSIBLE TO PERFORM A PRESSURE TEST AND VERIFY THE AVAILABLE WATER PRESSURE AT THE METER LOCATION. THE RESULT SHALL BE REPORTED TO BE COORDINATED WITH ALL NEW SERVICES.
ENGINEER BEFORE BID SUBMISSION AND INSTALLATION TO ENSURE THE PIPE SIZES SHOWN ON DRAWINGS ARE SUFFICIENT FOR REQUIRED GPM OF PLUMBING 8. PROVIDE AND INSTALL NEW SHUTOFF VALVE. CONTRACTOR TO CONFIRM THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID
FIXTURES. IF REQUIRED, NEW CITY WATER CONNECTION TO BE REQUESTED BASED ON PRESSURE TEST RESULT. 2. PROVIDE AND INSTALL NEW WATER METER COMPLETE WITH ASSOCIATED VALVES AT THIS APPROXIMATE LOCATION. THE EXACT LOCATION TO BE
COORDINATED ON SITE. CONTRACTOR TO CONFIRM THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
SUBMISSION.
10 KENNY COURT, BRAMPTON
CONTRACTOR TO CONFIRM THE MODEL OF ALL EQUIPMENT INCLUDING HOT WATER TANKS AND PLUMBING FIXTURES INCLUDE SINKS, TOILET AND FAUCET
9. PROVIDE AND INSTALL NEW STAND SHOWER COMPLETE WITH ASSOCIATED SHOWER HEAD AND CONTROL. CONTRACTOR TO CONFIRM THE MODEL
WITH OWNER BEFORE BID SUBMISSION AND INSTALLATION.
3. PROVIDE AND INSTALL BACKFLOW PREVENTER AND ASSOCIATED VALVES AT THIS APPROXIMATE LOCATION. THE EXACT LOCATION TO BE AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
COORDINATED ON SITE.
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO BE 10. PROVIDE AND INSTALL NEW COUNTER TOP SINK COMPLETE WITH FAUCET, UNDER SINK VALVES, TRAP AND FLEXIBLE HOSE. CONTRACTOR TO CONFIRM
PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS. 4. PROVIDE AND INSTALL NEW EXPANSION TANK (REFER TO M-03 FOR MORE DETAILS). CONTRACTOR TO CONFIRM THE MODEL AND MANUFACTURER WITH THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
PROJECT NUMBER: 2205780
ARCHITECT AND OWNER BEFORE BID SUBMISSION. DESIGNED BY: A.Y.
ALL DOMESTIC COLD AND HOT WATER PIPING PASSING THOUGH UNCONDITIONED SPACES TO BE EQUIPPED WITH HEAT TRACING AND INSULATION WITH 11. PROVIDE AND INSTALL NEW FLOOR MOUNTED TOILET COMPLETE WITH FLUSH TANK AND SEAT. CONTRACTOR TO CONFIRM THE MODEL AND
ALUMINUM/PVC JACKET. REFER TO SPECIFICATION FOR INSULATION REQUIREMENT. 5. PROVIDE AND INSTALL NEW HOT WATER TANKS COMPLETE WITH ALL ASSOCIATED VALVES AND EXPANSION TANK AT THIS APPROXIMATE LOCATION MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION. CHECKED BY: F.R.
(REFER TO SCHEDULE FOR MORE DETAILS). THE EXACT LOCATION TO BE COORDINATED ON SITE.
12. PROVIDE AND INSTALL NEW DOMESTIC COLD WATER PIPE AND CONNECT TO CITY DOMESTIC WATER NETWORK. THE EXACT LOCATION AND TIE-IN POINT
02
6. PROVIDE AND INSTALL MIXING VALVE AT THIS APPROXIMATE LOCATION. THE EXACT LOCATION TO BE COORDINATED ON SITE. TO BE VERIFIED ON SITE BY CONTRACTOR.
SCALE: 3/16"=1'
13. PROVIDE AND INSTALL NEW HOSE BIB WITH ASSOCIATED PIPING AND NON-FREEZ HYDRANT FOR ALL EXTERIOR MOUNTED HOSE BIBS. THE EXACT
LOCATION TO BE COORDINATED ON SITE. CONTRACTOR TO CONFIRM THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID
SUBMISSION.
M-07
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
∅21" DHW UP
∅21" DCW UP
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
∅21" DHWR
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
∅21" DCW UP ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
TERRA E
W
O
LO
PE
BE
N
TO
TO
∅21" DHW UP REVISION DESCRIPTION DATE
BE
N
PRA ER ROO
PE
LO
∅21" DHWR ∅21" DCW UP
O
W
00 ISSUED FOR REVIEW 2022-08-29
OGA ROO 01 ISSUED FOR PERMIT 2022-11-14
∅21" ∅21" DHWR
∅21" DHWR ∅21" DHW UP 02 REISSUED FOR PERMIT 2024-04-02
∅21" DCW UP ∅21" DCW UP
∅21" DHW UP ∅21" DHW UP ∅21" DHW DN
∅21" DHWR ∅21" DCW DN
∅21" DCW UP
∅21" DCW DN
∅21" DHW UP
∅21" DHW DN
∅21" DHWR DN
∅21" DHWR
∅21" DCW UP
4
ENSUITE
∅21" DCW DN
GUEST BEDROO
OPEN TO
ABO E
∅43"
ON RETE
WI
DE
∅43" DHWR DN
∅43" DCW DN
∅43" DHW DN
∅21" DHW UP
∅21" DCW UP
∅21" DHWR
∅21" DHW UP
∅21" DHW UP
∅21" DHW UP
∅21" DCW UP
∅21" DCW UP
∅21" DCW UP
∅21" DCW UP
∅21"
∅21" DCW DN
∅43" DHW
∅43" DCW
3
TYP.
∅21" DCW UP
OPEN TO
ABO E
∅21" DHW UP
IT HEN
∅
2
1
∅21" DCW DN
"
∅
D
1
H
2
"D
W
∅21" DHW DN
CW
D
N
D
N
SPI E IT HEN
∅43" DCW DN
∅43" DHW DN
∅43 " DHWR DN
WOOD STEPS AS
PER OB SB 7
STUD ROO
PANTR
∅21" DHW DN
R
∅21" DCW DN
WATERFALL ∅21" DCW UP
H A ∅21" DHW UP
SHAFT ∅21" DCW UP
PANTR
∅21" DHWR
5 FLOOR
1
TYP. ABO E
DHWR DN
∅21" DCW DN
DHW DN
TYP.
DCW DN
GARAGE
∅43"
∅43"
∅43"
∅21" DHW DN
∅21" DCW DN
∅21" DHW DN
∅21" DHW UP
∅21" DHW UP
∅21" DHW UP
∅21" DCW UP
∅21" DCW UP
∅21" DCW UP
∅21" DHWR
∅21" DHWR
∅21" DHWR
∅21" DHW DN
∅21" DCW DN
∅21" DCW DN
SER ER
ROO
TERRA E
∅21" DCW UP
DINING ROO
2
∅43" DHWR DN
∅43" DHW DN
∅43" DCW DN
∅43" DHWR DN
∅43" DHW DN
∅21" DHW UP
∅21" DCW UP
∅21" DHW UP
∅21" DCW UP
∅43" DCW DN
∅21" DHWR
∅21" DHWR
∅21" DCW UP
SITTING AREA
∅21" DHW UP
∅21" DHW UP
∅21" DHWR ∅21" DCW UP
∅21" DHWR
2024-04-02
DRAWING TITLE:
THE SIZES OF DOMESTIC WATER PIPES SHOWN ON DRAWING ARE BASED ON THE SIZE OF EXISTING WATER CONNECTION FROM CITY. PLUMBING CONTRACTOR 1. PROVIDE AND INSTALL NEW DOMESTIC COLD AND HOT WATER PIPE AND RE-CIRCULATION WATER PIPE AT GROUND FLOOR CEILING LEVEL. PROJECT ADDRESS:
IS RESPONSIBLE TO PERFORM A PRESSURE TEST AND VERIFY THE AVAILABLE WATER PRESSURE AT THE METER LOCATION. THE RESULT SHALL BE REPORTED TO INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES.
ENGINEER BEFORE BID SUBMISSION AND INSTALLATION TO ENSURE THE PIPE SIZES SHOWN ON DRAWINGS ARE SUFFICIENT FOR REQUIRED GPM OF PLUMBING
FIXTURES. IF REQUIRED, NEW CITY WATER CONNECTION TO BE REQUESTED BASED ON PRESSURE TEST RESULT.
2. PROVIDE AND INSTALL NEW COUNTER TOP SINK COMPLETE WITH FAUCET, UNDER SINK VALVES, TRAP AND FLEXIBLE HOSE. CONTRACTOR TO CONFIRM
THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
10 KENNY COURT, BRAMPTON
CONTRACTOR TO CONFIRM THE MODEL OF ALL EQUIPMENT INCLUDING HOT WATER TANKS AND PLUMBING FIXTURES INCLUDE SINKS, TOILET AND FAUCET
WITH OWNER BEFORE BID SUBMISSION AND INSTALLATION.
3. PROVIDE AND INSTALL NEW FLOOR MOUNTED TOILET COMPLETE WITH FLUSH TANK AND SEAT. CONTRACTOR TO CONFIRM THE MODEL AND
MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO BE
PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS. PROJECT NUMBER: 2205780
4. PROVIDE AND INSTALL NEW STAND SHOWER COMPLETE WITH ASSOCIATED SHOWER HEAD AND CONTROL. CONTRACTOR TO CONFIRM THE MODEL DESIGNED BY: A.Y.
AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
ALL DOMESTIC COLD AND HOT WATER PIPING PASSING THOUGH UNCONDITIONED SPACES TO BE EQUIPPED WITH HEAT TRACING AND INSULATION WITH
ALUMINUM/PVC JACKET. REFER TO SPECIFICATION FOR INSULATION REQUIREMENT. CHECKED BY: F.R.
5. PROVIDE AND INSTALL KITCHEN SINK ALONG WITH ASSOCIATED PIPING. CONTRACTOR TO CONFIRM MODEL AND MANUFACTURER WITH OWNER
BEFORE INSTALLATION.
SCALE: 3/16"=1'
02
M-08
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
∅21" DCW DN
∅21" DHW DN
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
4
∅21" DCW DN ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
TYP. STANDARDS.
ENSUITE
2
TYP. 1 ∅21" DHW DN REVISION DESCRIPTION DATE
∅21" DCW DN
TYP.
SHOWER 00 ISSUED FOR REVIEW 2022-08-29
01 ISSUED FOR PERMIT 2022-11-14
WI IRON
∅21" DHW DN 02 REISSUED FOR PERMIT 2024-04-02
∅21" DCW DN ∅21" DCW DN
∅21" DHW DN 3
TYP.
BEDROO 2
TERRA E
WI
OPEN TO
BELOW
SEATING AREA
TE
R
R
A
E
∅21" DHW DN
∅21" DCW DN
A
R
∅21" DHW DN
∅21" DHW DN
∅21" DHW DN
∅21" DCW DN
∅21" DCW DN
∅21" DCW DN
∅21" DCW DN
R
TE
PANTR
D W
DRESSING AREA
LAUNDR
SITTING AREA ∅21" DHW DN
∅21" DCW DN
OPEN TO
BELOW
ENSUITE
∅21" DCW DN
PRA ROO
∅21" DHW DN
WI
LINE OF STUD
∅21" DCW DN
WALL ABO E
ASTER BEDROO 1
ASTER BEDROO 2
∅21" DHW DN
∅21" DCW DN
ENSUITE
∅21" DHW DN
∅21" DHW DN
∅21" DHW DN
∅21" DCW DN
∅21" DCW DN
∅21" DCW DN
TERRA E
OPEN TO
BELOW
BEDROO 1
∅21" DCW DN
WI MECHANICAL ENGINEER
BEDROO 3
WI
∅21" DHW DN
∅21" DCW DN
∅21" DHW DN
∅21" DCW DN
∅21" DCW DN
∅21" DHW DN
∅21" DHW DN
TERRA E
∅21" DCW DN
GLASS ENTR
OID
2024-04-02
DRAWING TITLE:
THE SIZES OF DOMESTIC WATER PIPES SHOWN ON DRAWING ARE BASED ON THE SIZE OF EXISTING WATER CONNECTION FROM CITY. PLUMBING CONTRACTOR 1. PROVIDE AND INSTALL NEW COUNTER TOP SINK COMPLETE WITH FAUCET, UNDER SINK VALVES, TRAP AND FLEXIBLE HOSE. CONTRACTOR TO CONFIRM PROJECT ADDRESS:
IS RESPONSIBLE TO PERFORM A PRESSURE TEST AND VERIFY THE AVAILABLE WATER PRESSURE AT THE METER LOCATION. THE RESULT SHALL BE REPORTED TO THE MODEL AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
ENGINEER BEFORE BID SUBMISSION AND INSTALLATION TO ENSURE THE PIPE SIZES SHOWN ON DRAWINGS ARE SUFFICIENT FOR REQUIRED GPM OF PLUMBING
FIXTURES. IF REQUIRED, NEW CITY WATER CONNECTION TO BE REQUESTED BASED ON PRESSURE TEST RESULT.
2. PROVIDE AND INSTALL NEW FLOOR MOUNTED TOILET COMPLETE WITH FLUSH TANK AND SEAT. CONTRACTOR TO CONFIRM THE MODEL AND
MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
10 KENNY COURT, BRAMPTON
CONTRACTOR TO CONFIRM THE MODEL OF ALL EQUIPMENT INCLUDING HOT WATER TANKS AND PLUMBING FIXTURES INCLUDE SINKS, TOILET AND FAUCET
WITH OWNER BEFORE BID SUBMISSION AND INSTALLATION.
3. PROVIDE AND INSTALL NEW STAND SHOWER COMPLETE WITH ASSOCIATED SHOWER HEAD AND CONTROL. CONTRACTOR TO CONFIRM THE MODEL
AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO BE
PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS. PROJECT NUMBER: 2205780
4. PROVIDE AND INSTALL NEW STAND BATHTUB COMPLETE WITH ASSOCIATED SHOWER HEAD AND CONTROL. CONTRACTOR TO CONFIRM THE MODEL
AND MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
DESIGNED BY: A.Y.
ALL DOMESTIC COLD AND HOT WATER PIPING PASSING THOUGH UNCONDITIONED SPACES TO BE EQUIPPED WITH HEAT TRACING AND INSULATION WITH
ALUMINUM/PVC JACKET. REFER TO SPECIFICATION FOR INSULATION REQUIREMENT. CHECKED BY: F.R.
SCALE: 3/16"=1'
02
M-09
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
A E UP ROO
REVISION DESCRIPTION DATE
∅2"
00 ISSUED FOR REVIEW 2022-08-29
UP
01 ISSUED FOR PERMIT 2022-11-14
ST
02 REISSUED FOR PERMIT 2024-04-02
ST
EXER ISE
ROO
ST
∅2"
STORM
DN/UP BEDROO
∅121" UP ST
CO
215.00
∅1 21 " DN
ST
∅2" UP
ST
WR
∅4" ∅3" UP
ST
UP ∅1 21 " DN
SAUNA
ST
215.00
ST
∅3"
DN
∅2"
ST
STORM
SAUNA HEATER
SHOWER
∅2"
DN
ST
∅4" ∅1 21 " DN 214.95 ∅2"
FD DN
ST
∅3"
215.00 DN
ST
ST
1% SLOPPED
ST
∅4"
215.00 215.00
FUR R
R 2
ST
A HINE
1% SLOPPED
ST
∅4" ∅4"
∅4" ∅2"
ST
STACK
1% SLOPPED 1% SLOPPED
DN/UP 215.00
214.91
ST
∅4"
∅4" 214.94 ∅4"
HALLWA
ST
FURNA E ROO 1
ST
∅2"
∅4" ∅4" STORM
ST
FD UP
ED
PP
215.00 SL
O
3 1%
4"
1% SLOPPED
∅
ST ST ST ST ST
ST
∅3" ∅3"
∅4" ∅3" STORM
214.90 STACK
UP
H A UP
UP
ST
ST
H A
ST
SHAFT
SHAFT
ST
ST
ST
ST
∅121" UP
1
ST
214.82
ST
214.86
ST
∅121"
ST
UP ∅3"
STACK
UP
1% SLOPPED
ST
2 214.72
ST
∅2"
∅4"
STORM
ST
ST
STORAGE
∅3"
LOSET
STORM
ST
ST
1% SLOPPED
ST
∅4"
ST
215.00
ST
∅3"
ST
DN
ST
ST
WR
ST
ST
1% SLOPPED ∅3"
∅4" STORM ∅121" UP
UP ∅4"
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
THEATRE 1
∅4" STORM STACK
E UIP ENT ∅1 " DN
2 1% SLOPPED 1% SLOPPED
214.76 DN/UP
ST
214.61
ST
ST
∅4" ∅4"
∅2"
STORM CO
214.84 214.74 1% SLOPPED
∅1 21 " UP ∅2" UP
UP
ST
ST
∅4"
ST
2% SLOPPED
ST
∅2"
ST
ST ST ST
∅2"
STORM
ST
ST
ST
ST
UNEX A ATED
215.00
∅1 21 " DN
ST
ST
UNEX A ATED
ST
ST
ST
ST
∅4"
ST
ST
∅3" STACK
UP UP
ST
ST
∅3"
MECHANICAL ENGINEER
ST
STORM
ST
ST
UP
HO E THEATER
ST
ST
SITTING AREA
ST
ST
ST
ST
∅4"
ST
ST
∅4" STORM
ST
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
1% SLOPPED
1% SLOPPED
OPTIMAL ENGINEERING INC INFO@OPTIMALENG.CA
ST
∅4" ∅3"
214.67 STACK
UP
7030 WOODBINE AVE, UNIT 500 WWW.OPTIMALENG.CA
ST
∅4"
STORM
ST
ST
SUMP
PIT
5
2024-04-02
OLD ROO
BW
ST ST ST ST ST ST ST
214.63
217.00
4 DRAWING TITLE:
PROPOSED BASEMENT
SANITARY LAYOUT
IMPORTANT NOTES: DESIGN NOTES:
VENT PIPING IS NOT SHOWN IN THIS DRAWING AND SHALL BE INSTALLED BASED ON ONTARIO BUILDING CODE REQUIREMENT. PROJECT ADDRESS:
1. PROVIDE AND INSTALL NEW UNDERGROUND SANITARY PLUMBING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES.
ALL SANITARY SYSTEMS TO BE PROVIDED WITH CLEANOUTS IN ACCORDANCE WITH ONTARIO BUILDING CODE EVEN IF THEY ARE NOT SHOWN ON DRAWINGS.
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO
2. PROVIDE AND INSTALL NEW SANITARY PLUMBING AT BASEMENT CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES. 10 KENNY COURT, BRAMPTON
BE PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS. 3. PROVIDE AND INSTALL NEW FLOOR DRAIN. THE EXACT LOCATION TO BE COORDINATED ON SITE. CONTRACTOR TO CONFIRM THE MODEL AND
MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION.
ALL SANITARY AND STORM WATER PIPING PASSING UNCONDITIONED SPACE TO BE PROVIDED WITH INSULATION BY CODE.
4. NEW UNDERGROUND SANITARY TO BE CONNECTED TO CITY SANITARY NETWORK. THE EXACT LOCATION AND TIE-IN POINT TO BE VERIFIED ON SITE BY PROJECT NUMBER: 2205780
CONTRACTOR.
DESIGNED BY: A.Y.
CHECKED BY: F.R.
5. PROVIDE AND INSTALL NEW BACK WATER VALVE AT THIS APPROXIMATE LOCATION. INSTALLATION TO BE COORDINATED WITH NEW SERVICES AND IN
ACCORDANCE WITH MANUFACTURE INSTALLATION INSTRUCTIONS.
PROVIDE AND INSTALL NEW CLEAN OUT AT THIS APPROXIMATE LOCATION. INSTALLATION TO BE COORDINATED WITH NEW SERVICES AND IN
SCALE: 3/16"=1'
02 6.
ACCORDANCE WITH MANUFACTURE INSTALLATION INSTRUCTIONS.
M-10
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
∅121" UP
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
STANDARDS.
∅3" UP
TERRA E
W
O
LO
PE
BE
N
TO
TO
REVISION DESCRIPTION DATE
BE
N
PRA ER ROO
PE
LO
O
W
∅2"
FD 00 ISSUED FOR REVIEW 2022-08-29
OGA ROO 01 ISSUED FOR PERMIT 2022-11-14
ST
∅2" UP
ST
∅121" DN
ST
∅121" UP
ST
∅2"
STORM
∅121" DN DN
∅3"
∅2"
DN
∅3"
∅4" DN
STACK
DN
ENSUITE
GUEST BEDROO
OPEN TO
ABO E
ON RETE
ST
WI
DE
ST
ST
ST
ST
ST
∅121" UP 4 ∅2" UP
TYP.
ST
∅3" ∅3" UP ∅3"
ST ST ST ST ST ST ST ST ST ST
STACK
∅2"
ST
∅2" UP ∅3" DN/UP
STACK STORM ∅2" UP
UP ON STEPS
ST
LIBRAR ∅121" UP
ST
SELF
LOSING
ST
∅2" DOOR
ST
STORM
ST
DN
ST
∅121" UP ∅3"
∅3" DN
ST
STACK
ST ST ST ST
DN
∅3"
OPEN TO STORM
DN
ABO E
∅121" DN
IT HEN
SPI E IT HEN
∅121" DN
∅121" ∅3"
STACK
1 DN
PANTR
∅121" DN
R
WATERFALL
H A ∅121" UP
∅3" UP
SHAFT ∅3"
STACK
UP
PANTR
FLOOR 3
ST ST ST
ABO E ∅3"
∅2"
DN ∅4"
STORM
∅121" ∅121" STACK
DN DN DN
ST
GARAGE
∅4" ∅2" UP
STORM ∅1 21 " DN
DN ∅2"
STACK ∅3"
DN STORM
∅2" ST ST ST
FD ∅121" UP
SER ER
ROO
∅4"
STACK
DN ∅121" DN
TERRA E ∅3"
∅3" STACK
DINING ROO DN ST ST ST ST ST ST ST ST ST ST ST ST ST ST
DN ∅2"
∅3" UP 2 ∅3"
STORM STORM
DN
GREAT FO ER TYP. MECHANICAL ENGINEER
SITTING AREA
∅121" UP
∅121" UP ∅121" UP
∅2" UP
∅3"
UP 7030 WOODBINE AVE, UNIT 500 WWW.OPTIMALENG.CA
STACK
DN
MARKHAM, L3R 6G2 (647) 877 4787
∅2" UP OID
OID ∅3"
UP
2024-04-02
DRAWING TITLE:
VENT PIPING IS NOT SHOWN IN THIS DRAWING AND SHALL BE INSTALLED BASED ON ONTARIO BUILDING CODE REQUIREMENT. 1. PROVIDE AND INSTALL NEW SANITARY PLUMBING AT BASEMENT CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES. PROJECT ADDRESS:
ALL SANITARY SYSTEMS TO BE PROVIDED WITH CLEANOUTS IN ACCORDANCE WITH ONTARIO BUILDING CODE EVEN IF THEY ARE NOT SHOWN ON DRAWINGS.
2. PROVIDE AND INSTALL NEW SANITARY PLUMBING AT GROUND FLOOR CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES.
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO BE 10 KENNY COURT, BRAMPTON
PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS. 3. PROVIDE AND INSTALL NEW FUNNEL DRAIN FOR WINE CELLAR. THE EXACT LOCATION TO BE COORDINATED ON SITE.
ALL SANITARY AND STORM WATER PIPING PASSING UNCONDITIONED SPACE TO BE PROVIDED WITH INSULATION BY CODE.
4. PROVIDE AND INSTALL NEW STORM PLUMBING AT GROUND FLOOR CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES.
PROJECT NUMBER: 2205780
DESIGNED BY: A.Y.
CHECKED BY: F.R.
02
SCALE: 3/16"=1'
M-11
IMPORTANT NOTES:
THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE THE EXCLUSIVE PROPERTY OF OPTIMAL
ENGINEERING AND MUST NOT BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT
OF OPTIMAL ENGINEERING.
CONTRACTOR TO CAREFULLY EXAMINE SITE AS WELL AS EXISTING SERVICES (IF ANY) AND NOTIFY
DESIGNER ABOUT ANY CHANGES AND/OR DISCREPANCIES BEFORE INSTALLATION.
DRAWINGS ARE NOT TO BE SCALED; REFER TO ARCHITECTURAL DRAWINGS FOR ALL MEASUREMENTS.
∅121" DN LOCATION OF EQUIPMENT ARE APPROXIMATE AND MUST COORDINATED WITH OTHER TRADES, OWNER,
BUILDER, AND ARCHITECT BEFORE INSTALLATION.
ALL EQUIPMENT AND MATERIALS USED SHALL MEET THE REQUIREMENTS OF ONTARIO BUILDING CODE,
ONTARIO ELECTRICAL SAFETY CODES, AND ALL OTHER APPLICABLE CODES AND STANDARDS.
ALL INSTALLATION TO COMPLY WITH ONTARIO BUILDING CODE AND ALL OTHER APPLICABLE CODES AND
∅3" STANDARDS.
DN
ENSUITE
∅3" BEDROO 2
STACK
DN
TERRA E
WI
∅2"
OPEN TO FD
BELOW
ST
SEATING AREA
TE
ST
R
R
A
E
ST
E
ST
A
R
R
TE
PANTR
ST
3
ST
∅121" DN ∅3"
STACK ∅2" DN
∅3" 2 TYP. DN D W
ST
∅3"
STACK DN
∅2"
DN TYP. FD
ST ST ST ST ST ST ST ST ST ST
∅2" DN
ST
DRESSING AREA ∅2"
∅2" FD LAUNDR ∅121"
SITTING AREA FD
ST
DN
ST
ST
∅4"
ST
ST
OPEN TO
∅2" BELOW
ENSUITE STORM
DN
ST
∅121" DN
ST
PRA ROO ST ST ST ST
∅4"
STORM
DN
WI
LINE OF STUD
WALL ABO E
ASTER BEDROO 1
ASTER BEDROO 2
∅121" DN
∅3"
STACK ∅3"
DN DN
∅2"
FD
1
ENSUITE
TYP.
∅2" DN
∅121" DN
TERRA E
OPEN TO
BELOW
∅3" BEDROO 1
STACK
DN
∅3" ST ST ST ST ST ST ST ST ST ST ST ST ST
DN ∅2" ∅2"
STORM FD
DN
WI MECHANICAL ENGINEER
BEDROO 3
WI
∅121" DN
TERRA E
∅121" DN ∅121" DN
∅2" DN
GLASS ENTR
∅2" DN
OID ∅3"
OID
DN
OID
2024-04-02
DRAWING TITLE:
VENT PIPING IS NOT SHOWN IN THIS DRAWING AND SHALL BE INSTALLED BASED ON ONTARIO BUILDING CODE REQUIREMENT. 1. PROVIDE AND INSTALL NEW SANITARY PLUMBING AT GROUND FLOOR CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES. PROJECT ADDRESS:
ALL SANITARY SYSTEMS TO BE PROVIDED WITH CLEANOUTS IN ACCORDANCE WITH ONTARIO BUILDING CODE EVEN IF THEY ARE NOT SHOWN ON DRAWINGS.
2. PROVIDE AND INSTALL NEW FLOOR DRAIN. THE EXACT LOCATION TO BE COORDINATED ON SITE. CONTRACTOR TO CONFIRM THE MODEL AND
CONTRACTOR IS TO COMPLY WITH NATIONAL AND ONTARIO FIRE CODE FOR ALL PENETRATIONS ON FRR FIRE SEPARATION SLABS AND WALLS. FIRE STOP TO BE MANUFACTURER WITH ARCHITECT AND OWNER BEFORE BID SUBMISSION. 10 KENNY COURT, BRAMPTON
PROVIDED ON ALL PENETRATIONS WITH THE SAME FIRE RATING AS INDICATED ON ARCHITECTURAL DRAWINGS FOR ASSOCIATED SLABS AND/OR WALLS.
3. PROVIDE AND INSTALL NEW STORM PLUMBING AT GROUND FLOOR CEILING. INSTALLATION TO BE COORDINATED WITH ALL NEW SERVICES.
ALL SANITARY AND STORM WATER PIPING PASSING UNCONDITIONED SPACE TO BE PROVIDED WITH INSULATION BY CODE.
SCALE: 3/16"=1'
M-12