Professional Documents
Culture Documents
PROJECT INFORMATION
THE SCOPE OF THE WORK IS TO CREATE
PERMIT DRAWINGS FOR A MOTEL
PROPOSED SITE
PROJECT MANAGER
VICINITY MAP
GENERAL NOTES
1.1. ALL WORK TO BE IN COMPLIANCE WITH ALL APPLICABLE NATIONAL, STATE, & LOCAL BUILDING AND ZONING CODES. CONTRACTOR SHALL NOTIFY THE HOME OWNER OF ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS
AND CODE REQUIREMENTS BEFORE STARTING WORK.
1.2. ALL TRADE STANDARDS AND MANUFACTURER'S INSTRUCTIONS REFERENCED IN THE CONSTRUCTION DOCUMENTS SHALL BE THE LATEST EDITION. Sheet List
1.3. ALL FIRE RATED ASSEMBLIES INDICATED IN THE CONSTRUCTION DOCUMENTS SHALL REFERENCE THE LATEST EDITION OF UNDERWRITERS LABORATORIES (UL), NATIONAL GYPSUM ASSOCIATION AND ICC-ES EVALUATION REPORTS.
1.4. ALL CONTRACTOR(S) PERFORMING WORK SHALL HAVE APPLICABLE LICENSES AND INSURANCE AS REQUIRED BY THE PROJECT OWNER AND LOCAL JURISDICTION Sheet No Sheet Name
1.5. CONTRACTOR(S) IS RESPONSIBLE FOR OBTAINING BUILDING PERMITS UNLESS NOTED OTHERWISE (U.N.O.) IN CONTRACT DOCUMENTS. 1.6. CONTRACTOR(S) IS RESPONSIBLE FOR OBTAINING MECHANICAL, ELECTRICAL, PLUMBING &
SPRINKLER PERMITS U.N.O.
1.7. .ANY MECHANICAL, ELECTRICAL, PLUMBING, FIRE SAFETY SYSTEMS OR OTHER ENGINEERING SYSTEMS IS DESIGNED BY OTHERS AND COORDINATED BY OTHERS IN THE ARCHITECTURAL DOCUMENTS.
1.8. CONTRACTOR(S) IS RESPONSIBLE FOR NOTIFYING THE BUILDING INSPECTOR A MINIMUM OF 24 HOURS PRIOR TO COMMENCING WORK. CONTRACTOR(S) IS RESPONSIBLE FOR CONTACTING THE BUILDING INSPECTOR FOR ANY / ALL
A111 SECTIONS
REQUIRED INSPECTIONS FOR THE DURATION OF THE PROJECT. A112 SECTIONS
1.9. CONTRACTOR IS RESPONSIBLE FOR ENGAGING QUALIFIED INSPECTORS TO PERFORM CODE REQUIRED SPECIAL INSPECTIONS. WHERE APPLICABLE, REPORTS MUST BE ISSUED TO AUTHORITY HAVING JURISDICTION. NOTIFY HOME OWNER
OF ANY FAILED INSPECTIONS OR DISCREPANCIES FROM CONTRACT DOCUMENTS. A113 DETAILS
1.10. SUBMITTALS ARE REQUIRED FOR STRUCTURAL, MECHANICAL, ELECTRICAL AND OTHER SPECIALIZED CONSTRUCTION. SUBMITTALS SHALL BE REVIEWED BY HOME OWNER FOR CONFORMANCE OF DESIGN. WHERE DRAWINGS DO NOT
INDICATE APPROACH, CONTRACTORS SHALL COMPLY WITH PUBLISHED TRADE STANDARD A114 DETAILS
PROTOCOL.
1.11. CONTRACTOR IS TO VERIFY EXISTING SITE CONDITIONS PRIOR TO COMMENCING WORK, NOTIFY HOME OWNER IMMEDIATELY REGARDING ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND ARCHITECTURAL DOCUMENTS. A115 ELECTRICAL PLANS
1.12. CONTRACTOR TO VERIFY AND COORDINATE ALL DIMENSIONS ON PLANS, COORDINATE UTILITY LOCATIONS, STACKS, CONDUIT, AND OTHER BUILDING SYSTEMS. COORDINATE ELEVATION OF GRADE WITH FOUNDATION AND /OR SLAB PROJECT NUMBER
ELEVATION.
A116 ELECTRICAL PLANS
0001
1.13. CONTRACTOR SHALL BRING ERRORS AND OMISSIONS WHICH MAY OCCUR IN CONTRACT DOCUMENTS TO THE ATTENTION OF THE HOME OWNER IN WRITING AND WRITTEN INSTRUCTIONS SHALL BE OBTAINED BEFORE PROCEEDING A117 MECHANICAL PLANS
WITH THE WORK. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE RESULTS OF ANY ERRORS,
DISCREPANCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS, OF WHICH THE CONTRACTOR FAILED TO NOTIFY THE HOME OWNER BEFORE CONSTRUCTION AND/OR FABRICATION OF THE WORK. A118 MECHANICAL PLANS
1.14. DO NOT SCALE DRAWINGS.
1.15. CONTRACTORS SHALL KEEP THE PREMISES CLEAN, FREE OF ALL TRASH, DEBRIS AND SHALL PROTECT ALL ADJACENT WORK FROM DAMAGE, SOILING, PAINT OVER-SPRAY, ETC. ALL FIXTURES, EQUIPMENT, GLAZING, FLOORS, ETC. SHALL BE A119 SCHEDULES
LEFT CLEAN AND READY FOR OCCUPANCY UPON COMPLETION OF THE PROJECT.
1.16. CONTRACTOR(S) IS RESPONSIBLE FOR PROVIDING REQUIRED SITE FENCING AND PEDESTRIAN PROTECTION AROUND PERIMETER OF JOB SITE AS PER OSHA AND MUNICIPALITY REQUIREMENTS AND GUIDELINES. A101 COVER PAGE SCALE
1.17. CONTRACTOR(S) IS RESPONSIBLE TO ACQUIRE ANY / ALL STREET & SIDEWALK CLOSURE PERMITS AS WELL AS ANY REQUIRED DUMPSTER PERMITS.
1.18. CONTRACTOR PROVIDE ALL MATERIALS, LABOR, EQUIPMENT AND SERVICES (BOTH TEMPORARY AND PERMANENT) REQUIRED TO COMPLETE WORK. UNLESS OTHERWISE INDICATED IN CONTRACT DOCUMENTS. JOBSITE TOILET AND
A102 NOTES AND LEGENDS
TELEPHONE TO BE PROVIDED, AS REQUIRED BY OWNER. A103 SITE PLAN SHEET NAME
1.19. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND SUPERVISING SUB-CONTRACTORS WORK, AND PROVIDING SHAFTS, CHASES, RECESSES AND OTHER MEANS OF ACCESS FOR TRADE WORK. SUB CONTRACTOR
TO FIX, PATCH ANY WORK CUT OR DAMAGED DURING INSTALLATION THAT RESULTS IN AN A104 FOUNDATION PLAN
UNSATISFACTORY CONSTRUCTION CONDITION AND IS NON CONFORMING WITH CONSTRUCTION DOCUMENTS.
1.20. THE HOME OWNER IS NOT RESPONSIBLE FOR THE CONTRACTOR(S) MEANS AND METHODS OF CONSTRUCTION. A105 FIRST FLOOR PLAN COVER PAGE
1.21. OPERATION AND MAINTENANCE DATA SHALL BE HANDED OVER TO OWNER UPON COMPLETION OF PROJECT
1.22. THE PHRASE "OR EQUAL" SHALL BE ASSUMED WHEN CONSTRUCTION DOCUMENTS CALL OUT A SPECIFIC PRODUCT A106 SECOND FLOOR PLAN
A107 ROOF PLAN DATE
SHEET NUMBER
A101
SCALE
DRAWN BY
PROJECT MANAGER
MUNICIPALITY. 72" WIDE SHALL REST ON A SINGLE JACK-STUD. EACH
WALL MOUNT LIGHT END OF A HEADER FOR WALL OPENINGS GREATER
THAN 72" SHALL REST ON (2) JACK-STUDS, UNLESS
DISPOSAL 1. ELECTRICAL CONTRACTOR TO PLACE STANDARD G8 PROVIDE WOOD BLOCKING BEHIND CEILING FANS
NOTED OTHERWISE.
RECESSED EYEBALL LIGHT WALL OUTLETS AND SMOKE DETECTORS PER LOCAL
CODE.
EXHAUST FAN G9 USE 2X4 BLOCKING @ 36", 54", 78" A.F.F. TO CENTER LINE 6. MULTIPLE WINDOW OPENINGS SHALL HAVE (2) STUDS TO
2. ALARM PADS TO BE PLACED BY CONTRACTOR. OF BLOCK FOR KITCHEN CABINETS AND @ 30" A.F.F. TO MATCH WALL WIDTH BETWEEN WINDOW UNITS UNLESS
FAN / LIGHT COMBO CENTER LINE OF BLOCK FOR BATHROOM CABINETS. NOTED OTHERWISE.
3. PRE WIRE STANDARD FOR GARAGE DOOR OPENERS.
CEILING FAN w/ LIGHT KIT 7. SHEATHING ON ALL FIREPLACE CHASES SHALL BE 7/16"
4. ELECTRICAL CONTRACTOR TO PLACE DISHWASHER G10 CLOSETS TO HAVE 1 ROD AND 1 SHELF WHERE SHOWN O.S.B. FIREPLACE OPENING SHALL BE FRAMED IN
SWITCH PER LOCAL CODE. UNLESS NOTED OTHERWISE
ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS
STANDARD PREWIRE
OPTIONAL CEILING FAN / LIGHT FIXTURE 5. 220V OUTLET FOR STOVE AND DRYER PER FOR SIZE AND CLEARANCE OF OPENING.
G11 1R&1S - SHELF 69" A.F.F. 2R&1S-SHELF & 80" A.F.F. 2nd ROD
COMMUNITY SPEC. 38" A.F.F.
FLOODLIGHT 8. ALL EXTERIOR CORNERS (INSIDE AND OUTSIDE
6. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR,
GARAGE DOOR BUTTON MATERIALS, EQUIPMENT AND NECESSARY ITEMS AND OBTAIN AND G12 LINEN CLOSETS AND PANTRIES TO HAVE (5) 16" DEEP CORNERS) SHALL BE BRACED WITH 7/16" O.S.B.
PAY FOR ALL FEES AND PERMITS REQUIRED TO INSTALL A SHELVES UNLESS NOTED OTHERWISE. FIRST SHELF TO BE PLYWOOD. NAILING SCHEDULE SHALL BE:
COMPLETE ELECTRICAL SYSTEM. @ 36" AFF W/ SHELF SPACING 12" O.C. ABV. - 8d COMMONS AT 6" o.c. AT ALL EDGES.
24"x12" FLUORESCENT LIGHT FIXTURE
7. IT IS THE INTENT OF THESE PLANS FOR THE ELECTRICAL - 8d COMMONS AT 12" o.c. AT ALL INTERMEDIATE STUDS.
CONTRACTOR TO PROVIDE A COMPLETE SYSTEM, REGARDLESS OF
48"x24" FLUORESCENT LIGHT FIXTURE WHETHER EACH INDIVIDUAL COMPONENT IS MENTIONED OR NOT. G13 UTILITY ROOM TO HAVE (1) 16" SHELF AT 60" A.F.F. ABOVE 9. OPTION - APPROVED DIAGONAL CORNER BRACES
WASHER & DRYER. CABINETS ARE PER COMMUNITY BOTH DIRECTIONS AT ALL CORNERS.
8. WORK PERFORMED BY THE ELECTRICAL CONTRACTOR SHALL
SPECS.
COMPLY WITH THE STANDARDS OF THE FOLLOWING CODES AND
ELECTRICAL WIRE ORDINANCES: 10. ROOF DECKING SHALL BE 7/16"O.S.B. PLYWOOD
G14 DOOR INTO THE HOUSE FROM THE GARAGE TO BE
A. NFPA N. 70, "NATIONAL ELECTRIC CODE" LATEST EDITION. WEATHERSTRIPPED SOLID CORE MINIMUM.
FLOOR BREAK B.
C. NECA "STANDARD OF INSTALLATION"
DOOR CHIME D. THE ELECTRICAL UTILITY COMPANY SERVICE STANDARDS. G15 ALL MIRROR WIDTHS TO BE 3" LESS THAN OVERALL HEADER NOTES:
E. UNDERWRITER'S LABORATORY STANDARDS. VANITY WIDTH. MIRROR HEIGHTS ARE PER COMMUNITY
OTHER LOCAL CODES, ORDINANCES AND LAWS APPLICABLE TO SPECS
THE LOCATION OF THIS PROJECT. H1 HEADER MATERIAL TO BE A MIN. # 2 S.Y.P.
9. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH G16 CENTER OF TOILET TO BE A MIN. OF 15" FROM THE H2 HEADERS, LONGER THAN 9'-0", IF NOT
TELEPHONE COMPANY AND THE ELECTRIC UTILITY COMPANY. VERTICAL SURFACE OF SIDE WALLS, CABINETS OR OTHER
SPECIFIED ON PLANS, ARE TO BE DESIGNED
10. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR
OBSTRUCTION. PROVIDE A MIN OF 21" CLEAR FROM
BY A REGISTERED PROFESSIONAL ENGINEER.
TOILET TO THE VERTICAL FACE OF A TUB OR OTHER
TIMELY PLACEMENT OF ALL CONDUITS, OUTLET BOXES, CABINETS,
OBSTRUCTION. EDGE OF TOILET TO BE A MIN. FO 4" FROM H3 LOCATE HEADER DIRECTLY ABOVE OPENING.
AND OTHER WIRING DEVICES IN FLOORS, WALLS, CEILINGS, ETC.
AS THE CONSTRUCTION PROGRESSES. PEDESTAL OR WALL MOUNTED LAV. PROVIDE CRIPPLE FRAMING FROM TOP
PLATES TO HEADER AS REQUIRED.
11. OUTLET BOXES SHALL BE LOCATED AS FOLLOWS: G17 FACE EDGE OF SHOWER UNITS TO HAVE A MIN. 24"
A. WALL SWITCHES - 4'-0" ABOVE FINISH FLOOR CLEAR TO ANY VERTICAL SURFACE. H4 TABLE APPLIES TO ALL EXTERIOR WALLS PROJECT NUMBER
B. CONVENIENCE OUTLETS - 1'-4" (16") A.F.F (CENTER) AND LOAD BEARING INTERIOR WALLS. FOR
C. EQUIPMENT OUTLETS AS REQUIRED (VERIFY) G18 A/C PADS ARE TO BE 36"x36" OR 36"x72" FOR 2-UNIT A/C PAD NON-LOAD BEARING INTERIOR WALLS, USE 0001
12. CONDUCTORS SHALL BE COPPER, TYPE THWN/THHN. 2-2x4'S CUT FROM STUDS.
13. CONVENIENCE RECEPTACLES SHALL BE 15 (20)AMP., 125 VOLT G19 STUB GAS LINE 6" AFF AT CENTERLINE OF RANGE DO NOT USE TABLE IF HEADERS SUPPORT
H5
NEMA 5-15(20)R. CONCENTRATED LOADS.
14. WALL SWITCHES SHALL BE 20 AMP. 120/277 V. AC, SINGLE POLE OR
AS INDICATED ON THE DRAWING. FIREPLACE ROUGH OPENING HEADERS
HEADER SCHEDULE SCALE
15. CIRCUIT BREAKER PANELS SHALL BE BY SQUARE D, SIEMENS, OR G20 FP ROUGH OPENING SCHEDULE
GENERAL ELECTRIC. SPAN: FRAMING: LABEL:
16. GROUNDING OF ELECTRICAL SYSTEMS SHALL BE IN ACCORDANCE FP BOX SIZE: OPNG WIDTH:OPNG HEIGHT:
WITH THE N.E.C. AND LOCAL REQUIREMENTS. 36" BOX 42" UP TO 6'-6" 2-2x10 HDR-A
34 5 8" SHEET NAME
17. ALL MATERIAL SHALL BE NW AND U.L. APPROVED AND LABELED. 6'-7" TO 9'-0" 2-9 1/4" LVL HDR-B
42" BOX 48" 34 5 8"
OVER 9'-0" BY ENGINEER ENG.
18. ALL ELECTRICAL EQUIPMENT AND SYSTEMS SHALL BE TESTED AND
ADJUSTED FOR PROPER OPERATION. COMPLETE WIRING SYSTEM
SHALL BE FREE OF SHORT CIRCUITS. NOTES AND
19. THE ELECTRICAL CONTRACTOR SHALL MAKE COMPLETE LEGENDS
CONNECTIONS TO ALL EQUIPMENT. COORDINATE WITH
EQUIPMENT SUPPLIER FOR EXACT LOCATIONS AND
DRAINAGE NOTES:
REQUIREMENTS. D1 PROVIDE SITE DRAINAGE AS REQUIRE BY DATE
SITE TOPOGRAPHY
Issue Date
D2 FINISH FLOOR SHALL BE A MIN. OF 8" ABOVE
ADJ. FINISH GRADE FINISH GRADE SHALL
SLOPE 5% FOR A MIN. DISTANCE OF 10'-0"
FROM HOUSE TO AN APPROVED DRAINAGE
SYSTEM.
SHEET NUMBER
A102
SCALE
DRAWN BY
TOP OF CURB
T.C 30.1
WARWICK SOUTHERN BAPTIST CHURCH (28.4)
'
148.92
3 15 PROFILE 2 20' x 10' x 7'' CONCRETE
15'' W
N 17 37' DUMPSTER PAD
3 00 PROFILE 3
0.0
T .C 3
(27.7) D
T.C. 30.0'
T.C. 30.0'
EXISITNG GRADE
29.4
299.69'
28.6
300.00'
PROJECT MANAGER
NOW OR FORMERLY
CHARLES PATTEN PROPOSED
48 UNITS MOTEL NOW OR FORMERLY
CHARLES PATTEN
CONCRETE
TRANSFORMER PAD
LOCATION & SIZE AS SPECIFIED
BY VEPCO
REGRADE DITCH ON
DO NOT BLOCK
0.23% SLOPE.
N 79 39'10''E
DRAINAGE
NOTES
S 79 39'10''W
TOTAL AREA = 1.020 ACRES
ZONING = C-2
A103
1 SITE
1" = 20'-0"
PLAN
SCALE
1" = 20'-0"
DRAWN BY
A B C D E F G H I J
107' - 7"
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
0' - 4" 4' - 0" 0' - 4" 14' - 1" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 14' - 1" 4' - 0" 4' - 0"
0' - 4"
4' - 10"
5' - 4"
5' - 0"
5' - 4"
5' - 4"
0' - 6"
2
PROJECT MANAGER
7' - 8"
12' - 5"
14' - 9"
THICKENED SLAB
24' - 1"
0' - 8"
12' - 9"
3' - 3"
0' - 8"
8' - 0"
12' - 9"
0' - 8"
48' - 10"
48' - 10"
49' - 6"
60' - 2"
60' - 2"
1' - 6"
12' - 9"
3' - 6"
THICKENED SLAB
0' - 8" 3' - 3"
12' - 9"
24' - 1"
24' - 1"
12' - 5"
PROJECT NUMBER
0001
7' - 8"
3
0' - 6"
5' - 4"
5' - 4"
SCALE
5' - 0"
5' - 0"
5' - 4"
3/16" = 1'-0"
4
0' - 4"
SHEET NAME
FOUNDATION
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 8' - 4"
PLAN
112' - 11"
DATE
Issue Date
FOUNDATION PLAN
SHEET NUMBER
3/16" = 1'-0"
DRAWN BY
6 7 8 9 A111
10 11 12 13 14 15
112' - 9"
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
4' - 5" 4' - 4" 5' - 0" 6' - 7" 5' - 7" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 3' - 8" 8' - 9"
5
5' - 4"
5' - 4"
5' - 4"
5' - 4"
5' - 4"
16
12' - 5"
11' - 9"
14' - 9"
14' - 9"
16' - 1"
HALL
PROJECT MANAGER
59 SF SUITE 13 SUITE 12 SUITE 11 SUITE 10 SUITE 9 SUITE 8
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
LINEN ROOM 261 SF 261 SF 261 SF 261 SF 261 SF 265 SF
127 SF
-
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
24' - 5"
0' - 8"
---
3' - 0"
13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 3"
9' - 9" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 10"
2' - 1"
2' - 1"
2' - 1"
2' - 1"
2' - 1"
8' - 0"
5' - 6"
79 SF
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
42 SF 42 SF 42 SF
3' - 5"
3' - 5"
3' - 5"
3' - 5"
3' - 5"
8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1"
49' - 6"
49' - 6"
60' - 2"
60' - 2"
19
8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1"
8' - 3"
3' - 5"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
BATH 2 BATH 3
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
42 SF 42 SF BATH 4 BATH 5 BATH 6 BATH 7
7' - 2"
42 SF 42 SF
8' - 9"
42 SF 42 SF
2' - 0"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
2' - 1"
BATH 1
12' - 7"
36' - 5"
72 SF
4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 10"
1' - 11"
13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 3"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
0' - 8"
13' - 3"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
SUITE 1 SUITE 2 SUITE 3 SUITE 4 SUITE 5 SUITE 6 SUITE 7
14' - 5"
17 PROJECT NUMBER
UP 0001
5' - 4"
5' - 4"
5' - 4"
5' - 4"
5' - 4"
18
8' - 9" 4' - 10" 6' - 3" 6' - 0" 14' - 7" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 3' - 8" 8' - 9"
SCALE
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
3/16" = 1'-0"
8' - 9" 95' - 3" 8' - 9" SHEET NAME
112' - 9"
FIRST FLOOR
PLAN
DATE
Issue Date
SHEET NUMBER
FIRST
1 3/16" = 1'-0" FLOOR PLAN A105
SCALE
3/16" = 1'-0"
DRAWN BY
6 7 8 9 A111
10 11 12 13 14 15
112' - 9"
4' - 4" 27' - 2" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
8' - 9" 5' - 0" 6' - 7" 5' - 7" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 14' - 7" 3' - 8" 4' - 3"
5
5' - 4"
5' - 4"
5' - 4"
5' - 4"
5' - 4"
16
SUITE 27
221 SF
14' - 9"
15' - 0"
SUITE 26 SUITE 25 SUITE 24 SUITE 23 SUITE 22 SUITE 21
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
20' - 7"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
24' - 5"
--- 13' - 3"
3' - 0"
5' - 9"
30' - 10"
13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 3"
7' - 6"
4' - 3"
5' - 5"
1' - 5" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 10"
6' - 1"
LINEN RM.
2' - 1"
2' - 1"
2' - 1"
2' - 1"
2' - 1"
44 SF
8' - 2"
5' - 6"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
39 SF 42 SF 42 SF 42 SF 42 SF
3' - 5"
3' - 5"
3' - 5"
3' - 5"
3' - 5"
8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1"
49' - 6"
60' - 2"
60' - 2"
19
8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1" 8' - 1"
8' - 1"
3' - 5"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 6"
3' - 8"
BATH 15 BATH 16
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
5' - 2"
BATH 14 42 SF 42 SF BATH 17 BATH 18 BATH 19 BATH 20
42 SF 42 SF 42 SF 42 SF 42 SF
1' - 10"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
2' - 1"
8' - 5" 4' - 10" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 8" 4' - 8" 8' - 5" 8' - 5" 4' - 10"
4' - 0"
13' - 3" 13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 1" 13' - 3"
30' - 6"
28' - 11"
DN
24' - 5"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
23' - 6"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
SUITE 14 SUITE 15 SUITE 16 SUITE 17 SUITE 18 SUITE 19 SUITE 20
265 SF 261 SF 261 SF 261 SF 261 SF 261 SF 265 SF
16' - 6"
PROJECT NUMBER
17 0001
5' - 4"
5' - 4"
5' - 4"
5' - 4"
18
SCALE
4' - 4" 4' - 10" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 6' - 0" 6' - 3" 8' - 4" 6' - 3" 3' - 8" 4' - 4" 4' - 5"
3/16" = 1'-0"
95' - 3" 8' - 9"
SHEET NAME
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
SECOND
FLOOR PLAN
DATE
Issue Date
SECOND
1 3/16" = 1'-0" FLOOR PLAN SHEET NUMBER
A106
SCALE
3/16" = 1'-0"
DRAWN BY
6 7 8 9 A111
10 11 12 13 14 15
105' - 11"
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
1' - 0" 4' - 4" 95' - 3" 4' - 4" 1' - 0"
1' - 0"
1' - 0"
5
5' - 4"
5' - 4"
5' - 4"
5' - 4"
16
PROJECT MANAGER
1" / 12"
1" / 12"
-
1" / 12"
24' - 9"
24' - 5"
24' - 5"
---
49' - 6"
62' - 2"
62' - 2"
19
1" / 12"
1" / 12"
1" / 12"
24' - 5"
24' - 5"
24' - 9"
PROJECT NUMBER
0001
17
5' - 4"
5' - 4"
5' - 4"
5' - 4"
SCALE
18 3/16" = 1'-0"
1' - 0"
1' - 0"
SHEET NAME
1' - 0" 4' - 4" 95' - 3" 4' - 4" 1' - 0"
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
DATE
Issue Date
SHEET NUMBER
A107
ROOF
1 3/16" = 1'-0" PLAN
SCALE
3/16" = 1'-0"
DRAWN BY
23 24 25 26 27 28 29 30 31 32
105' - 11"
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
1' - 0" 4' - 4" 95' - 3" 4' - 4" 1' - 0"
1' - 1"
1' - 0"
1' - 0"
22
2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0"
5' - 4"
5' - 4"
5' - 4"
5' - 4"
33
PROJECT MANAGER
1" / 12"
1" / 12"
1" / 12"
24' - 9"
24' - 5"
24' - 5"
49' - 6"
62' - 2"
62' - 2"
36
1" / 12"
1" / 12"
1" / 12"
24' - 5"
24' - 5"
24' - 9"
0001
34
5' - 4"
5' - 4"
5' - 4"
5' - 4"
SCALE
35
1' - 0"
1' - 0"
3/16" = 1'-0"
1' - 1"
1' - 0" 4' - 4" 95' - 3" 4' - 4" 1' - 0" SHEET NAME
4' - 4" 13' - 9" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 5" 13' - 9" 4' - 4"
105' - 11"
ROOF
FRAMING
PLAN
DATE
Issue Date
SHEET NUMBER
ROOF
1 3/16" = 1'-0" FRAMING PLAN A108
SCALE
3/16" = 1'-0"
DRAWN BY
23
6 24
7 25
8 26
9 27
10 28
11 29
12 30
13 31
14 32
15
ROOF LEVEL
24' - 9"
1" / 12"
1" / 12"
1" / 12"
SECOND FLOOR CEILING
21' - 0"
PROJECT MANAGER
FIRST FLOOR CEILING
10' - 0"
N.G.L
-1' - 0"
South
1 3/16" = 1'-0" Elevation
5 16 19 17 18
ROOF LEVEL
24' - 9"
PROJECT NUMBER
0001
Issue Date
SHEET NUMBER
West
2 3/16" = 1'-0" Eelevation
A109
SCALE
3/16" = 1'-0"
DRAWN BY
OLIVIAdesign
32
15 31
14 30
13 29
12 28
11 27
10 26
9 25
8 24
7 23
6
ROOF LEVEL
24' - 9"
1" / 12"
SECOND FLOOR CEILING
1" / 12"
1" / 12"
21' - 0"
PROJECT MANAGER
FIRST FLOOR LEVEL
0' - 0"
N.G.L
-1' - 0"
North
1 3/16" = 1'-0" Elevation
18 17 19 16 5
ROOF LEVEL
1" / 12" 1" / 12"
24' - 9"
PROJECT NUMBER
0001
SHEET NUMBER
2 East Elevation
3/16" = 1'-0" A110
SCALE
3/16" = 1'-0"