CONSTRUCTION NOTES DEMOLITION NOTES ABBREVIATIONS
Drawing List
1. THE SCOPE OF WORK FOR THE PROJECT SHALL INCLUDE ALL LABOR, MATERIALS, DEVICES, SUPPLIES,
EQUIPMENT, AND OTHER FACILITIES NECESSARY FOR AND INCIDENTAL TO THE EXECUTION AND
1. REMOVE ALL EXISTING FINISHES & REPAIR & PREPARE ALL SURFACES FOR FINISHES
ACST ACOUSTIC JAN JANITOR No. Description
COMPLETION OF WORK DESCRIBED IN THESE DOCUMENTS. 2. MATERIAL HAVING SALVAGE VALUE SHALL BECOME THE PROPERTY OF THE OWNER ALL OTHER AD AREA DRAIN JT JOINT
MATERIAL AND DEBRIS ACCUMULATED AS A RESULT OF DEMOLITION SHALL BECOME THE AGGR AGGREGATE
2. THE CONTRACTOR SHALL SECURE AND PAY FOR THE BUILDING PERMIT AND OTHER PERMITS AND PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PREMISES BY THE A.C. AIR CONDITIONING LAM LAMINATED A0.1 Title Sheet
GOVERNMENT FEES, LICENSES AND INSPECTIONS NECESSARY FOR PROPER EXECUTION AND COMPLETION CONTRACTOR AND DISPOSED OF IN A LEGAL AND PROPER MANNER. AL ALUMINUM LAV LAVATORY
A1.0 Existing/Demo Floor Plans
OF WORK. A.C.T. ACOUSTICAL CEILING LP LOW POINT
3. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL TIMES TEMPORARY TILE LT WT LIGHT WEIGHT A1.1 Existing/Demo Floor Plans
ASST. ASSISTANT architect seal
3. THE CONTRACTOR SHALL PAY ALL FEDERAL, STATE, LOCAL AND ALL OTHER TAXES THAT ARE APPLICABLE PROTECTION REQUIRED TO ENSURE SAFETY FOR PERSONS AND PROPERTY DURING DEMOLITION A2.0 Proposed Floor Plans
TO THIS CONTRACT. AND REMOVAL WORK. ATM AUTOMATED TELLER M MEN
MACHINE MACH MACHINE
A2.1 Proposed Floor Plans
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME GENERALLY FAMILIAR WITH THE JOB SITE 4. FURNISH, INSTALL, AND MAINTAIN DUST COVERINGS TO PREVENT THE SPREAD OF DUST MAX MAXIMUM A3.0 Proposed Reflected Ceiling Plans
AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL VERIFY ALL BEYOND THE IMMEDIATE AREA WHERE DEMOLITION IS BEING PERFORMED. BD BOARD MECH MECHANICAL
No. Description Date
A3.1 Proposed Reflected Ceiling Plans
DIMENSIONS AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIESTO THE ARCHITECT BLK'G BLOCKING MTL METAL 1 Issued for Permit 4.25.18
BEFORE PROCEEDING WITH THE WORK. 5. REMOVE EXISTING ELECTRICAL OUTLETS AND WIRING AS REQUIRED IN WALLS, FLOORS AND BOT BOTTOM MIN MINIMUM A4.0 Basement Interior Elevations
FURNISHINGS TO BE DEMOLISHED. B.O.F. BOTTOM OF FOOTING MO MASONRY OPENING A4.1 1st Floor Interior Elevations
5. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. WHERE LACK OF INFORMATION, OR MP MID POINT
A4.2 2nd Floor Interior Elevations
ANY DISCREPANCY SHOULD APPEAR IN THE DRAWINGS OR SPECIFICATIONS, THE G.C. SHALL REQUEST 6. ALL WALLS, DOORS, WINDOWS, FURNISHINGS AND EQUIPMENT DENOTED WITH DASHED CAB CABINET MSR MEMBER SERVICE REP.
WRITTEN INTERPRETATION FROM THE ARCHITECT BEFORE PROCEEDING WITH THAT PORTION OF THE LINES ARE TO BE REMOVED. REFER TO PROPOSED PLAN LAYOUT FOR CLARIFICATION. CAULK CAULKING A4.3 3rd Floor Interior Elevations
WORK. CB CATCH BASIN N NORTH A4.4 4th Floor Interior Elevations
7. ALL ELECTRICAL, PLUMBING AND MECHANICAL WORK (DEMOLITION AND NEW) IS TO BE CEM CEMENT NIC NOT IN CONTRACT
C.L. CENTER LINE NO. NUMBER
A4.5 5th Floor Interior Elevations
6. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE FROM THE DRAWINGS OR PERFORMED BY LICENSED, COMPETENT CONTRACTORS.
SPECIFICATIONS WITHOUT FIRST SECURING WRITTEN PERMISSION FROM THE ARCHITECT. CLG CEILING NTS NOT TO SCALE
8. PRIOR TO THE START OF DEMOLITION WORK GENERAL CONTRACTOR SHALL DETERMINE THE CLO CLOSET ND NIGHT DEPOSITORY
7. ITEMS LABELED NIC ARE "NOT IN CONTRACT". THE G.C., HOWEVER, IS RESPONSIBLE FOR ALL R.O., LOCATION OF LOAD BEARING PARTITIONS AND COLUMNS AND PROVIDE TEMPORARY SUPPORTS COL COLUMN
NECESSARY BLOCKING AND COORDINATION OF WORK. AS REQUIRED BY REMOVAL OR RELOCATION OF SUCH PARTITIONS. G.C. TO ENSURE ALL CONC CONCRETE O.C. ON CENTER
TEMPORARY SUPPORTS ARE CARRIED TO SUFFICIENT BEARING MATERIALS. CONST CONSTRUCTION O.D. OUTSIDE DIAMETER
8. WHERE A SYSTEM OR ASSEMBLY IS CALLED FOR, ALL NECESSARY PARTS AND MATERIALS REQUIRED FOR CORR CORRIDOR OFF OFFICE
A COMPLETE INSTALLATION/SYSTEM SHALL BE PROVIDED AND INSTALLED ACCORDING TO THE 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND TEMPORARY RELOCATION CRS COURSES OPNG OPENING
MANUFACTURERS INSTRUCTIONS. OF ALL LIFE SAFETY SYSTEMS INCLUDING FIRE/SMOKE ALARM AS REQUIRED DURING C.T. CERAMIC TILE OPP OPPOSITE
DEMOLITION AND CONSTRUCTION PHASES. CSR CUSTOMER SERVICE REP
9. ALL SYSTEMS & MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS CONF CONFERENCE PART PARTITION
RECOMMENDATIONS, INSTRUCTIONS AND SPECIFICATIONS. 10. ALL EXISTING SIDING, TRIM, FASCIA BOARDS, RAKE BOARDS, CORNER COARDS, ETC IS TO BE PL PLASTIC LAMINATE
REMOVED AND REPLACE WITH NEW PVC. DET DETAIL PLAS PLASTIC
10. PROVIDE ADEQUATE CONCEALED BLOCKING AND ANCHORING FOR ALL CEILING AND WALL MOUNTED DF DRINKING FOUNTAIN POL POLISHED
EQUIPMENT, HARDWARE AND ACCESSORIES. COORDINATE WITH ALL TRADES THE LOCATIONS OF SLEEVES, 11. ALL EXISTING WINDOWS & DOORS INTERIOR & EXTERIOR ARE TO BE REMOVED. REFER TO DIA DIAMETER PT PRESSURE TREATED
BLOCKING OR OTHER PRESET ACCESSORIES INVOLVING OTHER TRADES. PROPOSED PLAN LAYOUT FOR CLARIFICATION. DIM DIMENSION PDT PAINTED
DN DOWN
11. CONTRACTOR TO COORDINATE AND SCHEDULE WORK OF ALL TRADES SO AS TO NOT DELAY AT ANY 12. ALL EXISTING ROOF SHINGLES ARE TO BE REMOVED & REPACED WITH NEW PER PLAN. DWG DRAWING QT QUARRY TILE
PHASE OF COMPLETION, CONSTRUCTION DUE TO INTERCONNECTING WORK OR LATE SCHEDULING. IT IS DW DISH WASHER QTY QUANTITY
THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE THAT ALL SUB-TRADES ARE FAMILIAR 13. REFER TO STRUCTURAL DRAWINGS FOR ALL STRUCTURAL DEMOLITION LOCATIONS & DU DRIVE UP
WITH THE COMPLETE CONSTRUCTION DOCUMENTS PACKAGE INCLUDING WORK THAT MAY OR MAY NOT BE DETAILS. R RADIUS
PART OF THEIR SCOPE. ELE ELEVATION R RISER
ELEC ELECTRIC(AL) RD ROOF DRAIN
12. ALL WORK SHALL BE PERFORMED WITH THE BEST ACCEPTED PRACTICES OF THE RESPECTED TRADES. ELEV ELEVATOR REF REFER/ REFERENCE
EXISTING TO REMAIN ENT ENTRANCE REINF REINFORC(ED/ING)
13. ALL MATERIALS TO BE NEW (UNLESS OTHERWISE NOTED ON DRAWINGS), FIRST CLASS, IN EVERY EQ. EQUAL REQ'D REQUIRED
RESPECT, AND SHALL CONFORM TO CONTRACT DOCUMENTS. EQUIP. EQUIPMENT RM ROOM
EWC ELEC. WATER COOLER
14. CONTRACTOR TO COORDINATE CUTTING & PATCHING OF ALL TRADES. MATCH EXISTING MATERIALS AS EXIST EXISTING SAN SANITARY
REQUIRED. EXISTING TO BE REMOVED EXP EXPANSION SEC SECTION
15. CONTRACTOR TO COORDINATE KEYING SYSTEMS AND ALL HARDWARE FUNCTIONS WITH OWNER.
EXT
EC
EXTERIOR
ELEC. CONTRACTOR
SIM
SPEC
SIMILAR
SPECIFICATION
Singh Residence
EJ EXPANSION JOINT SS STAINLESS STEEL
16. CONTRACTOR TO COORDINATE THE INSTALLATION OF ALL ELECTRICAL, ALARM, SECURITY, DATA AND ST STAIR
TELEPHONE LINES. CONCEAL ALL NEW UTILITIES IN FINISHED AREAS AS REQUIRED. TELEPHONES TO BE FC FIRE CODE STL STEEL
FURNISHED AND INSTALLED BY OWNER. FD FLOOR DRAIN STOR STORAGE Interior Renovation
FDN FOUNDATION STRUC STRUCTURAL
17. LIFE SAFETY SYSTEMS SHALL BE INSTALLED AS REQUIRED, PER N.F.P.A., AND LOCAL REGULATIONS. FEC FIRE EXTINGUISHER SUSP SUSPENDED 11 Chestnut Street
CABINET SECY SECRETARY Boston, MA
18. CONTRACTOR TO COORDINATE ALL DELIVERY SCHEDULES AND LOCATIONS FOR ALL OWNER FURNISHED FHC FIRE HOSE CABINET
ITEMS WITH EACH SUPPLIER. VERIFY SUCH OWNER FURNISHED ITEMS WITH OWNERS REPRESENTATIVE, FHR FIRE HOSE RACK T TREAD
G.C. TO PROVIDE SOLID WOOD BLOCKING AS REQUIRED. FIN FINISH TEL TELEPHONE
19. CONTRACTOR SHALL REMOVE ALL TEMPORARY ITEMS, TRASH, TOOLS, AND EXCESS MATERIALS AT THE
DRAWING REFERENCE FIX
FL
FIXTURE
FLOOR
TOBJ
TOS
TOP OF BAR JOIST
TOP OF SLAB
COMPLETION OF WORK AND LEAVE THE ENTIRE PROJECT SITE IN A NEAT, CLEAN, ACCEPTABLE CONDITION.
SIM
FLSH'G
FTG
FLASHING
FOOTING
TOSTL
TOW
TOP OF STEEL
TOP OF WALL
Title Sheet
1
20. PRIOR TO TURNING THE COMPLETED PROJECT OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE DETAIL KEY A101 GA GAUGE TYP TYPICAL
ALL GREASE, DUST, DIRT, STAINS, LABELS, FINGERPRINTS AND OTHER FOREIGN MATERIALS FROM SIGHT, G.W.B. GYPSUM WALL BOARD 1/2" G.W.B. EACH SIDE
AND SWEEP, WET-MOP AND VACUUM ALL FLOORS. GL GLASS UL UNDERWRITERS LABORATORY
GR GRADE UNEXEC. UNEXCAVATED 2x4 WOOD STUDS Project Number 2018-009
21. THE CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL POWER AND LIGHTING AS REQUIRED. Room name GYP GYPSUM U.N.O. UNLESS NOTED OTHERWISE @ 16" O.C.
ROOM NAME/NUMBER
101 SOUND INSUL
Date 4.25.18
22. THE GENERAL CONTRACTOR SHALL MAINTAIN A SAFE AND SECURE SITE DURING ALL PHASES OF HDW HARDWARE V.C.T. VINYL COMPOSITION TILE AS REQUIRED
CONSTRUCTION. HM HOLLOW METAL VENT VENTILATION
HORZ HORIZONTAL VERT VERTICAL
WALL TYPE 1i
HP HIGH POINT VEST VESTIBULE
Drawn By VJS
4 1/2"
23. ALL WORK PERFORMED SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL BUILDING CODES AND
REQUIREMENTS, AS WELL AS THE MOST RECENT REQUIREMENTS OF THE APPLICABLE ACCESSIBILITY HR HOUR VP VENT PIPE
CODES. HT HEIGHT VWC VINYL WALL COVERING
DOOR NUMBER 101 Checked By VJS
H.P. HORSE POWER VAC VACUUM MIOSTURE RESISTANT G.W.B AT
24. THE GENERAL CONTRACTOR SHALL SUBMIT A WRITTEN GUARANTEE FOR THEIR MATERIALS AND JANITOR/RESTROOM PARTITIONS
WORKMANSHIP FOR ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE OF OWNER. ID INSIDE DIAMETER W WOMEN
WALL TYPE 1
A0.1
WINDOW TYPE 1t INCIN INCINERATOR W/ WITH
25. DISRUPTED ELECTRICAL AND WATER LINES RE-ROUTED DURING PROJECT CONSTRUCTION ARE TO INFO INFORMATION WD WOOD
REMAIN IN CONTINUOUS SERVICE. INSUL INSULATION W/O WITHOUT TYPICAL INTERIOR WALL
1 INT INTERIOR WP WATER/WEATHER PROOFING
26. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE PROPERLY DISCONNECTED, PLUGGED OR CAPPED, INVEST INVESTMENT
AS REQUIRED BY CODE AND SOUND CONSTRUCTION PRACTICE. EXTERIOR & INTERIOR 4 A101 2
ELEVATION Scale As indicated
27. UNLESS OTHERWISE NOTED, ELECTRICAL CONDUITS, PLUMBING LINES, ETC., SHALL BE RUN CONCEALED 3
AND FRAMING SHALL BE ADEQUATE SIZE TO ACCOMPLISH RESULT WITHOUT CAUSING ANY VARIATIONS DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
IN THE WALL PLANE. VERIFY ALL DIMENSIONS ON SITE.
REF architect seal
DN
EL: -12"
DN
DN DN
UP
UP
EL: -16" EL: 0"
DN UP
Singh Residence
EXISTING FLOOR TO
BE EXCAVATED & LOWERED 12"
(VERIFY ELEVATION IN FIELD) Interior Renovation
11 Chestnut Street
EXISTING MASONRY SUPPORT Boston, MA
PIERS TO BE REMOVED (DASHED)
Existing/Demo
Floor Plans
Project Number 2018-009
Date 4.25.18
Drawn By VJS
Checked By VJS
A1.0
Scale 1/4" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
DEMOLITION NOTES
1. REMOVE ALL EXISTING FINISHES & REPAIR & PREPARE ALL SURFACES FOR FINISHES
2. MATERIAL HAVING SALVAGE VALUE SHALL BECOME THE PROPERTY OF THE OWNER ALL OTHER
MATERIAL AND DEBRIS ACCUMULATED AS A RESULT OF DEMOLITION SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PREMISES BY THE
CONTRACTOR AND DISPOSED OF IN A LEGAL AND PROPER MANNER.
4. FURNISH, INSTALL, AND MAINTAIN DUST COVERINGS TO PREVENT THE SPREAD OF DUST
BEYOND THE IMMEDIATE AREA WHERE DEMOLITION IS BEING PERFORMED.
5. REMOVE EXISTING ELECTRICAL OUTLETS AND WIRING AS REQUIRED IN WALLS, FLOORS AND
FURNISHINGS TO BE DEMOLISHED.
6. ALL WALLS, DOORS, WINDOWS, FURNISHINGS AND EQUIPMENT DENOTED WITH DASHED
LINES ARE TO BE REMOVED. REFER TO PROPOSED PLAN LAYOUT FOR CLARIFICATION.
8. PRIOR TO THE START OF DEMOLITION WORK GENERAL CONTRACTOR SHALL DETERMINE THE
LOCATION OF LOAD BEARING PARTITIONS AND COLUMNS AND PROVIDE TEMPORARY SUPPORTS
AS REQUIRED BY REMOVAL OR RELOCATION OF SUCH PARTITIONS. G.C. TO ENSURE ALL
TEMPORARY SUPPORTS ARE CARRIED TO SUFFICIENT BEARING MATERIALS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND TEMPORARY RELOCATION
OF ALL LIFE SAFETY SYSTEMS INCLUDING FIRE/SMOKE ALARM AS REQUIRED DURING
DEMOLITION AND CONSTRUCTION PHASES.
10. ALL EXISTING SIDING, TRIM, FASCIA BOARDS, RAKE BOARDS, CORNER COARDS, ETC IS TO BE
REMOVED AND REPLACE WITH NEW PVC.
11. ALL EXISTING WINDOWS & DOORS INTERIOR & EXTERIOR ARE TO BE REMOVED. REFER TO
PROPOSED PLAN LAYOUT FOR CLARIFICATION.
12. ALL EXISTING ROOF SHINGLES ARE TO BE REMOVED & REPACED WITH NEW PER PLAN.
13. REFER TO STRUCTURAL DRAWINGS FOR ALL STRUCTURAL DEMOLITION LOCATIONS & architect seal
DETAILS.
EXISTING TO BE REMOVED
RELOCATE EXISTING
ELEC PANEL
DN DN
UP UP
Singh Residence
Interior Renovation
11 Chestnut Street
Boston, MA
Existing/Demo
Floor Plans
Project Number 2018-009
Date 4.25.18
Drawn By VJS
Checked By VJS
4' - 0"
BARBEQUE 3' - 6"
AREA
NEW WINDOW
Exterior
Patio 3'-6"x7'-0"
KITCHEN ISLAND
7' - 0"
W/ BAR SEATING
NEW DOUBLE
DOORS (72"W)
TO REMAIN LOCKED
3' - 11" NEW BI-FOLD DOORS
WITH POCKET ON EITHER
SIDE OF OPENING (68"W) FLOOR TO CEILING
BUILT-INS
NEW CURVED
Elevator EXISTING FIREPLACE
COUNTER & SINK
Formal
Dining Room
Elev Machine Room
EXISTING STRUCTURE
(SHADED BLACK) EXISTING FIREPLACE
TO REMAIN
DN
DECORATIVE WALL
Storage DN
TREATMENT
2' - 5 7/8"
BILLIARDS TABLE
NEW BUILT-IN
24"
(BY OWNER)
STORAGE
16' - 0"
EXISTING SLAB TO BE
EXCAVATED & LOWERED
(VERIFY ELEVATION IN FIELD) UP
CUSTOM ARCH
Singh Residence
3' - 0"
TOP WINDOW
Foyer Great Room
EQ EQ Interior Renovation
TOWEL STORAGE
11 Chestnut Street
Living Room Boston, MA
5' - 0"
4' - 9"
TO REMAIN
Date 4.25.18
Checked By VJS
A2.0
Scale 1/4" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
OPEN SHELVING
FIREPLACE
TO REMAIN
12' - 7 3/8"
MINIMIZE
Home Gym
EXIST MANTEL
13' - 1 1/4"
NEW STAND-UP
SHOWER
architect seal
Bath
RELOCATED
13' - 11 1/2"
Elevator
Bedroom ELEC PANEL
CARPET FLORING Storage
IN CLOSET
BUILT-INS
EXIST FIREPLACE
TO BE ABANDONED
ON THIS FLOOR DN
EXIST FP
TO REMAIN
EQ
LIGHT WINDOW
EQ
Closet Closet
31' - 10"
17' - 9"
RELOCATED HIDDEN DOOR WITH
EXISTING DOOR CONCEALED HINGES
UP
INFILL EXIST
NEW CASED Kitchen NEW COUNTER WITH
INFILL EXISTING GAS OPENING SINK & BASE CABS
DOOR OPENING Alcove
DOOR FIREPLACE
EQ
EQ
Laundry
INFILL 5TH FLOOR NOTE:
Bedroom
Singh Residence
26' - 6 1/2"
DISTRURBING EXISTING
Bathroom Boston, MA
EXIST FP PLUMBING LAYOUT
EXISTING FIREPLACE Master TO REMAIN
NEW DOUBLE SINK NEW WATER CLOSET
TO REMAIN
Bath VANITY
NEW DOOR Bathroom Proposed Floor
6' - 0"
Plans
14' - 7 3/8"
NEW WATER CLOSET
Linen LOCATION Project Number 2018-009
Date 4.25.18
Drawn By VJS
Checked By VJS
Proposed 3rd Floor Proposed 4th Floor Proposed 5th Floor
1 2 3
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
0 2' 4' 8' 0 2' 4' 8' 0 2' 4' 8'
A2.1
Scale 1/4" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
CEILING NOTES
1. WHERE BEAMS, PIPES AND OR OTHER CONSTRUCTION DETAILS PREVENT THE USE OF
STANDARD RECESSED FIXTURES, SHALLOW RECESSED FIXTURES SHALL BE USED.
(FIXTURE CUTS SHALL BE SUBMITTED FOR APPROVAL BY ARCHITECT OR ENGINEER.)
2. THE G.C. AND ELECTRICAL CONTRACTORS SHALL CHECK ALL CEILING HEIGHTS AND
CEILING PLENUM CONDITIONS FOR CLEARANCES OF ALL DUCTWORK, LIGHTING AND
OTHER CEILING HEIGHTS SHOWN ON THE CONTRACT DRAWINGS. ANY DISCREPANCIES
SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION.
4. PRIOR TO CLOSING UP ANY CEILING, ANY PLENUM SYSTEMS (HVAC, PLUMBING &
ELECTRICAL) SHALL BE INSPECTED AND WHERE REQUIRED, TESTED BY CONTRACTORS,
ENGINEERS AND PROPER AUTHORITIES HAVING JURISDICTION TO INSURE THEIR
PROPER INSTALLATION AND FUNCTION.
2' - 9"
6" DIA RECESSED
5. ALL JOINTS IN THE TILE FIELD SHALL BE SQUARE, LEVEL AND PERFECTLY ALIGNED LED CAN FIXTURES
WITH EACH OTHER AND WITH RECESSED LIGHTING FIXTURES. (TYPICAL)
8"
6. CEILING CONTRACTOR TO COORDINATE ACCESS TILES/PANELS WITH OTHER TRADES.
4' - 0"
7. ALL DIFFUSERS AND REGISTERS IN ALL AREAS SHALL BE SET PER STARTING POINTS (3) DECORATIVE 6" DIA RECESSED
ON THE ARCHITECTS REFLECTED CEILING PLANS PENDANTS OVER LED CAN FIXTURES
ISLAND (TYPICAL)
8, ALL DRYWALL SOFFITS AND FASCIAS ARE TO BE COMPLETED AS INDICATED ON PLANS.
8"
9. ALL LIGHTING, CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. SHALL BE LOCATED
IN THE CENTER OF CEILING TILES.
4' - 0"
RECLAIMED WOOD
BEAMS ABOVE -
REFLECTED CEILING PLAN KEY EXISTING SKYLIGHT
NON STRUCTURAL
8"
CEILING TO REMAIN
4' - 0"
6" DIA. RECESSED LED FIXTURE
architect seal
8"
SUSPENDED DECORATIVE FIXTURE - TBD
3' - 5"
No. Description Date
1 Issued for Permit 4.25.18
DECORATIVE SUSPSNDED
FIXTURE OVER BILLIARDS
TABLE - TBD
DECORATIVE SUSPSNDED
FIXTURE - TBD
Proposed
Reflected Ceiling
Plans
DECORATIVE SUSPSNDED Project Number 2018-009
FIXTURE - TBD
Date 4.25.18
Drawn By VJS
Checked By VJS
A3.0
Scale 1/4" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
CEILING NOTES
1. WHERE BEAMS, PIPES AND OR OTHER CONSTRUCTION DETAILS PREVENT THE USE OF
STANDARD RECESSED FIXTURES, SHALLOW RECESSED FIXTURES SHALL BE USED.
(FIXTURE CUTS SHALL BE SUBMITTED FOR APPROVAL BY ARCHITECT OR ENGINEER.)
2. THE G.C. AND ELECTRICAL CONTRACTORS SHALL CHECK ALL CEILING HEIGHTS AND
CEILING PLENUM CONDITIONS FOR CLEARANCES OF ALL DUCTWORK, LIGHTING AND
OTHER CEILING HEIGHTS SHOWN ON THE CONTRACT DRAWINGS. ANY DISCREPANCIES
SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION.
4. PRIOR TO CLOSING UP ANY CEILING, ANY PLENUM SYSTEMS (HVAC, PLUMBING &
ELECTRICAL) SHALL BE INSPECTED AND WHERE REQUIRED, TESTED BY CONTRACTORS,
ENGINEERS AND PROPER AUTHORITIES HAVING JURISDICTION TO INSURE THEIR
PROPER INSTALLATION AND FUNCTION.
5. ALL JOINTS IN THE TILE FIELD SHALL BE SQUARE, LEVEL AND PERFECTLY ALIGNED
WITH EACH OTHER AND WITH RECESSED LIGHTING FIXTURES.
7. ALL DIFFUSERS AND REGISTERS IN ALL AREAS SHALL BE SET PER STARTING POINTS
ON THE ARCHITECTS REFLECTED CEILING PLANS
9. ALL LIGHTING, CEILING MOUNTED DEVICES, SPRINKLER HEADS, ETC. SHALL BE LOCATED
IN THE CENTER OF CEILING TILES.
architect seal
SUSPENDED DECORATIVE FIXTURE - TBD
EXISTING SKYLIGHT
OVER STAIRS TO REMAIN
Singh Residence
Proposed
6" DIA RECESSED
LED CAN FIXTURES
Reflected Ceiling
(TYPICAL)
Plans
Project Number 2018-009
Date 4.25.18
Drawn By VJS
3rd Floor RCP 4th Floor RCP 5th Floor RCP
1 2 3
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
Checked By VJS
A3.1
Scale 1/4" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
2' - 6" 2' - 6"
7' - 10"
4' - 9 1/4"
7' - 10"
INTERIOR WINDOW
(CUSTOM)
CENTERLINE OF
2' - 0"
MUSIC ROOM
Elevation B1 Elevation B2
1 2
1/4" = 1'-0" 1/4" = 1'-0"
7' - 10"
7' - 10"
architect seal
Elevation B3 Elevation B4
3 4
1/4" = 1'-0" 1/4" = 1'-0"
Storage/Mech
Laundry/Stor
Singh Residence
Interior Renovation
11 Chestnut Street
Boston, MA
Music Room
4
Basement Interior
3 A4.0 1 Elevations
2
Project Number 2018-009
Date 4.25.18
Drawn By VJS
Checked By VJS
WC
A4.0
Scale As indicated
Basement Key
5 DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
3/16" = 1'-0" VERIFY ALL DIMENSIONS ON SITE.
NEW BI-FOLD DOORS
W/ RECESSED POCKETS
EITHER SIDE
NEW KITCHEN
MILLWORK
9' - 0"
9' - 0"
9' - 0"
7' - 9"
Elevation 1a Elevation 1b Elevation 1c
1 2 3
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
architect seal
9' - 0"
9' - 0"
9' - 0"
No. Description Date
1 Issued for Permit 4.25.18
Exterior
Patio
3 A4.1 1
Formal
Dining Room
Interior Renovation
11 Chestnut Street
Boston, MA
Checked By VJS
Living Room
Entry
A4.1
Scale As indicated
1st Floor Key DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
7 VERIFY ALL DIMENSIONS ON SITE.
3/16" = 1'-0"
10' - 10"
10' - 10"
10' - 10"
10' - 10"
Elevation 2a Elevation 2b Elevation 2c Elevation 2d
1 2 3 4
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
VIF
10' - 10"
10' - 10"
10' - 10"
architect seal
VIF
1 Issued for Permit 4.25.18
7 A4.2 5
6
10' - 10"
10' - 10"
10' - 10"
Library
Balcony
4
Singh Residence
3 A4.2 1
2 Interior Renovation
11 Chestnut Street
Billiards Boston, MA
10' - 10"
10' - 10"
8' - 4"
8' - 4"
Great Room
A4.2
Scale As indicated
2nd Floor Key DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
13 VERIFY ALL DIMENSIONS ON SITE.
3/16" = 1'-0"
5' - 9"
5' - 9"
8' - 10"
8' - 10"
8' - 10"
8' - 10"
2' - 6"
2' - 6"
Elevation 3a Elevation 3b Elevation 3c Elevation 3d
1 2 3 4
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
8' - 10"
8' - 10"
8' - 10"
architect seal
Home Gym
9
A4.3
VIF
8' - 10"
8' - 10"
VIF
Elevation 3h Elevation 3i
8 9
1/4" = 1'-0" 1/4" = 1'-0"
Master Walk-In
Closet
8
7 A4.3 5
6
Singh Residence
Interior Renovation
11 Chestnut Street
Boston, MA
4
Master Checked By VJS
Bath
A4.3
Scale As indicated
3rd Floor Key
10 DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
3/16" = 1'-0" VERIFY ALL DIMENSIONS ON SITE.
4' - 6"
4' - 6"
8' - 0"
8' - 0"
8' - 0"
2' - 0"
2' - 0"
Elevation 4a Elevation 4b Elevation 4c Elevation 4d
1 2 3 4
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
4' - 6"
8' - 0"
8' - 0"
8' - 0"
2' - 4"
architect seal
5 A4.4 7
Singh Residence
Bedroom
Interior Renovation
11 Chestnut Street
Boston, MA
4
Date 4.25.18
Drawn By VJS
A4.4
Scale As indicated
4th Floor Key
9
3/16" = 1'-0" DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.
EXISTING ROOF PITCH
& STRUCTURE TO REMAIN &
BE VERIFIED IN FIELD
VERIFY IN FIELD
VERIFY IN FIELD
3' - 0"
3' - 6"
4' - 9"
3' - 0"
3' - 6"
Elevation 5a Elevation 5b Elevation 5c
1 2 3
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
architect seal
Elevation 5d
4
1/4" = 1'-0"
Singh Residence
Storage
Interior Renovation
11 Chestnut Street
Boston, MA
Den Space
5th Floor Interior
4
Elevations
3 A4.5 1
Project Number 2018-009
2
Date 4.25.18
Drawn By VJS
Checked By VJS
Bath
A4.5
5th Floor Key
Scale As indicated
5
3/16" = 1'-0"
DO NOT SCALE DRAW ING, USE DIMENSIONS SHOWN.
VERIFY ALL DIMENSIONS ON SITE.