Professional Documents
Culture Documents
MN301-100-QC-SSR-0030 Closure
MN301-100-QC-SSR-0030 Closure
VDRS Code
Client Number 3550-95-SRV-8003
Contractor Document 014&665
Number
Worley Document Number CW2129031 /C-007B/-Q999-0036
Subject of Revision Issued for Information
Revision 1
Date 18//202
PROJECT: Oyu Tolgoi Underground Project: 02. Client. No:3550-95-SRV-8003 03.Worley. No:CW2129031 /C-007B/-
˃ˁʸ:ʽ̱̀ ˃̨̨̣̜̐ ʧ̛̦̜ ˄̵̱̬̜̦̌ ˃ഓ̭ഓ̣ Q999-0036
04. Location / ʥ̛̜̬̹̣̌: 05. Contractor Name/ Activity (ʧ̬̯̾̾̾ ̶̸̜̯̐̾̐̾̐ / ಲ̜̣ ̛̙̣̣̌̌̐̌ĂͿ: 06. Date/ ʽ̨̨̦̐: 07. Discipline / ˋ̛̣̣̐̾:
3550- Column Flotation ENKA / Shim Installation 05 March 2024 STRUCTURAL STEEL
08. Contract Number (ʧ̛̬̦̜̾̾̾ ̱̔̐̌̌ƉͿ: 09. Package Number (ʥ̶̼̦̌̐ ̱̬̔̐̌̌): 10. Subsystem (ʤ̙̣̼̦ ̔̾̔ ̬̌̔̌̐̌̌̚Ϳ:
CW2129031 C-007B 3550-105-01
3550- 15-S1-9027-15 / 3550-15-S1-9027-15 / SFIC15_040 Structural Steel levelling Plate and Shim Installation
12. RESULT: Follow up required X Satisfactory
ಲˀ ʪಲʻ͗ ʤ̬̐̌ ̵̥̙̾̾̾ ̵̌̏̌ ̹̬̣̯̜̌̌̔̌̐̌̌ ˌ̵̵̶̬̣̦̱̜̌̌̔̌̐̌̌̐̌
13. Description of Item and inspected work/ Observations / Deficiency (ʤ̛̙̣̣̯̐̌ / ಲ̣̾̐̚ ̵̛̜̭̦̾ ̛̙̣̌ / ʯ̛̜̣̭̜̦ ˃̜̣̌̍̌ƉͿ͗
During Surveillance in 3550- Column Flotation, it was found that Structural Steel column had been installed without “Shim
Installation” inspection.
See attachments:
x shown in drawing
x photos
ĞLJŶĞůzŝůĚŝnjͬϬϲ͘Ϭϯ͘ϮϬϮϰ
L.P.Nathan / 05/03/2024
QAQC Manager or Delegate Approval / Date
Surveillance Personnel / Date
ˋ̦̬̌̌ ̵̶̛̬̱̭̦̌̌ ̥̖̦̖̙̖̬ ̭̣̾̏̾ ̸̨̨̬̣̐ / ʽ̨̦̐Ž
ʤ̛̙̣̣̯̐̌ ̵̛̜̭̦̾ ̛̙̣̯̦̌̌ / ʽ̨̨̦̐
Verified By Approved by
Name: L.P.Nathan Name:Davut Koru
Date: 18.03.2024 Date:18.03.2024
Signature: Signature:
01. ENKA SRV No:
MN301-100-QC-SSR-00027
SITE SURVEILLANCE REPORT Issued To: ENKA (Internal)
PROJECT: Oyu Tolgoi Underground Project: 02. Client. No:3550-95-SRV-8003 03.Worley. No:CW2129031 /C-007B/-Q999-0036
˃ˁʸ:ʽ̱̀ ˃̨̨̣̜̐ ʧ̛̦̜ ˄̵̱̬̜̦̌ ˃ഓ̭ഓ̣
04. Location / ʥ̛̜̬̹̣̌ 05. Contractor Name/ Activity (ʧ̬̯̾̾̾ ̶̸̜̯̐̾̐̾̐ / 06. Date/ ʽ̨̨̦̐: 07. Discipline / ˋ̛̣̣̐̾:
3550- Column Flotation ಲ̜̣ ̛̙̣̣̌̌̐̌ĂͿ: 05 March 2024 STRUCTURAL STEEL
ENKA / Shim Installation
08. Contract Number (ʧ̛̬̦̜̾̾̾ ̱̔̐̌̌ƉͿ: 09. Package Number (ʥ̶̼̦̌̐ ̱̬̔̐̌̌): 10. Subsystem (ʤ̙̣̼̦ ̔̾̔ ̬̌̔̌̐̌̌̚Ϳ:
CW2129031 C-007B 3550-105-01
Photo-1 – Column Installed Grid – Grid - CA/C5 Photo -2 – Column Installed – Grid - CA/C5
Contractor/Supplier/Vendor Technical
Document and Drawing Review for SN1809A0 -
OT Underground Project
5 Certified
6 Cancelled
7 Closed
8 Superseded
Equipment Tag No
5 Certified
6 Cancelled
7 Closed
8 Superseded
Equipment Tag No