NOTES:-

OUTER FACE

EARTH FACE
OUTER FACE

EARTH FACE
γ

G.L.

FAVOURABLE BOND CONDITION


REINFORCEMENT DETAILS OF TOE WALL
CROSS SECTION OF TOE WALL

UNFAVOURABLE BOND CONDITION

FAVOURABLE ZONE:-

UNFAVOURABLE ZONE:-

EXPANSION GAP SHELL BE PLACED


AT EVERY 10m INTERVAL
OUTER FACE

EARTH FACE

THE DRAWING IS APPLICABLE ONLY


WHEN THE TOE WALL PLACED MORE
THAN 3m FROM ROAD EDGE

OUTER FACE

EARTH FACE
G.L.

REINFORCEMENT DETAILS OF TOE WALL


CROSS SECTION OF TOE WALL

CLIENT:- CONTRACTOR :- INDEPENDENT ENGINEER:- SAFETY CONSULTANT:- DESIGN CONSULTANT :- TITLE:- DRAWING NUMBER:- DATE:- 28.03.2024
DRAWN D.K DIMENSION & REINFORCEMENT DETAIL OF
SA INFRASTRUCTURE CONSULTANTS 188-2826-DRG-MISC-03
NATIONAL HIGHWAYS RCC TOE WALL (WITHOUT SURCHARGE) SCALE:- AS SHOWN
PRIVATE LIMITED IN ASSOCIATION DESIGNED GPV
AUTHORITY OF INDIA H.G. INFRA ENGINEERING LTD. H.G. INFRA ENGINEERING LTD.
WITH ROTRANS INFRA PROJECT
III Floor, Sheel Mohar Plaza, A-1, PRIVATE LIMITED III Floor, Sheel Mohar Plaza, A-1, PROJECT:- SHEET:- 01 OF 01
(Ministry of Road, Transport & CHECKED S.S DEVELOPMENT OF SIX LANE BAUNSAGUAR - BARAJA SECTION OF NH-130-CD ROAD FROM KM
Highways) Government of India Tilak Marg, C-Scheme, Jaipur, 1101A, 11TH FLOOR, TOWER A-II Tilak Marg, C-Scheme, Jaipur, REV:-
R0 28.03.2024 293+000 TO KM 338+500 UNDER RAIPUR-VISAKHAPATNAM ECONOMICS CORRIDOR IN THE STATE R0
ISSUED FOR APPROVAL G - 5 & 6, Sector - 10,New Delhi - 110075 Rajasthan – 302001 CORPORATE PARK, PLOT NO. 7A/A, Rajasthan – 302001
SECTOR-142, NOIDA - 201301 (UP) APPROVED S.R OF ODISHA ON HYBRID ANNUITY MODE (PACKAGE-OD-6) (LENGTH 45.500 KM) SIZE:-
REV DATE DESCRIPTION OF REVISIONS A2
E:\HG DOCUMENT DATA\DINESH\OD-6\TOE WALL\MISC-03 RCC TOE WALL 01 OD-6.dwg 28-Mar-24 User