You are on page 1of 21

Coal Concession Summary

PT. Fabrik Komponen Industri Energi


1
LICENSING AND PERMIT

IUP OP (Exploitation Permit) until 2034 (20 yrs)


October 2014, No. Kpts. 434.a/X/2014

Kelayakan Lingkungan Hidup (Environmental Feasibility Permit)


September 2014, No. 540/DESDEM/IX/2014/194

Izin Lingkungan Penambangan Batubara


May 2014, No: Kpts. 290/V/2014

Persetujuan AMDAL u/ 9822Ha


January 2014, No: Kpts.149/I/2014

PT. Fabrik Komponen Industri Energi


2
LOCATION
• Located in Cerenti District of Kuantan Singingi Regency, Riau Province.
• Concession Area 9822 Ha
• Focus area of JORC Exploration in 869 Ha.

PT. Fabrik Komponen Industri Energi


3
EXPLORATION AREA

• JORC Exploration
area focus in 869 Ha
• JORC Exploration
focus area in Temp
(Formasi Palembang
Tengah) is a coal
bearing formation

PT. Fabrik Komponen Industri Energi


4
DEVELOPMENT POTENTIAL

PT. Fabrik Komponen Industri Energi


5
DEVELOPMENT POTENTIAL

Rencana
Lokasi PLTU
869 ha
Kecamatan
Cerenti

Areal
Penambangan

Penambangan
Tahap I

PT. Fabrik Komponen Industri Energi


6
BOREHOLE

PT. Fabrik Komponen Industri Energi


7
BOREHOLE

TOTAL 119 BOREHOLE

PT. Fabrik Komponen Industri Energi


8
JORC EXPLORATION ACTIVITIES

Seams Measured Indicated Total


Avg Volume Tonnage (t) Avg Volume Tonnage (t) Tonnage (t)
Thick (bcm) Thick (bcm)
(m) (m)
B2 0.60 238,545 299,679 0.83 175,540 220,527 520,205
B1 0.50 28,856 36,550 0.50 7,331 9,286 45,836
B 3.85 18,461,647 22,635,262 3.80 2,072,768 2,541,358 25,176,619
A 4.48 26,261,132 32,156,113 3.13 2,166,686 2,653,054 34,809,167
A1 0.60 104,178 130,533 0.60 77,214 96,748 227,281
Total 45,094,358 55,258,138 4,499,539 5,520,972 60,779,110

PT. Fabrik Komponen Industri Energi


9
QUALITY COAL OF SEAM

Gross Gross
Total Inherent Ash Volatile Fixed Total
Calorific Calorific
Moisture Moisture Content Matter Carbon Sulfur
Seam Value Value

Kcal/Kg Kcal/Kg
% ARB % ADB % ADB % ADB % ADB % ADB
ADB ARB
Typical 46.98 15.39 8.30 40.39 35.92 0.38 5042 3155
B 36.86- 29.28-
Range 45.35-53.46 13.07-22.85 5.16-11.02 0.11-2.35 4341-5346 2751-3340
42.78 40.36
Typical 44.93 13.36 13.42 39.10 34.12 0.29 4783 2968
A-Inband 11.02- 34.25- 29.99-
Range 43.99-46.49 12.64-13.86 0.14-2.34 4099-4966 2404-3106
22.64 40.18 37.23
Typical 46.81 14.35 7.26 41.32 37.07 0.30 5145.08 3181
A-Exband 35.25- 33.25-
Range 43.99-49.67 11.43-24.78 5.07-13.00 0.14-2.56 4632-5317 2854-3242
42.26 41.66

PT. Fabrik Komponen Industri Energi


10
STAGE PLANS

PT. Fabrik Komponen Industri Energi


11
STAGE PLANS

PT. Fabrik Komponen Industri Energi


12
STAGE PLANS

PT. Fabrik Komponen Industri Energi


13
STAGE PLANS

PT. Fabrik Komponen Industri Energi


14
ULTIMATE PIT

PT. Fabrik Komponen Industri Energi


15
ULTIMATE OB DUMP PLAN

PT. Fabrik Komponen Industri Energi


16
MINE INFRASTRUCTURE

PT. Fabrik Komponen Industri Energi


17
HAULING ROAD FROM STOCK ROOM TO JETTY KUALA CENAKO

HAULING ROAD FROM STOCKROOM TO JETTY KUALA CENAKO 138 KM

PT. Fabrik Komponen Industri Energi


18
JORC MINE MOUTH (COAL)

PT. Fabrik Komponen Industri Energi


19
Coal Concession Summary

2022

You might also like