V PARKING AREA
1 Measurement of bowplank 6 M2 45,000 270,000.00
2 Excavation soil 9 M3 150,000 1,350,000.00
3 Foundation stone installing 4.5 m3 550,000 2,475,000.00
4 Slab akses installing 1.5 m1 800,000 800,000.00
5 screet floor 7 m2 45,000 315,000.00
6 paving brick installing 6 m2 160,000 960,000.00
7 stair 1.5 m1 1,400,000 1,400,000.00