You are on page 1of 12

G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

DRAWING LIST (BUILDING G1 AREA 11)


NO SHEET NUMBER Sheet Name

1 PSBR01_ART_G1_DR_ST001_GE011 DRAWING LIST


2 PSBR01_ART_G1_DR_ST100_LL011 AREA 11 LOADING PLAN AT LEVEL 0.00
3 PSBR01_ART_G1_DR_ST100_FOU011 AREA 11 FOUNDATION PLAN
4 PSBR01_ART_G1_DR_ST100_FRA21 AREA 11 GROUND FLOOR FRAMING PLAN
5 PSBR01_ART_G1_DR_ST100_FRA22 AREA 11 ROOF FRAMING PLAN
6 PSBR01_ART_G1_DR_ST100_FRA23 AREA 11 ROOF PURLIN PLAN
7 PSBR01_ART_G1_DR_ST200_FRA011 AREA 11 FRAMING ELEVATION
8 PSBR01_ART_G1_DR_ST300_FRA011 AREA 11 FRAME SECTION
9 PSBR01_ART_G1_DR_ST500_FOU11 AREA 11 FOOTING DETAILS
10 PSBR01_ART_G1_DR_ST500_COL11 AREA 11 COLUMN SCHEDULE REINFORCEMENT
11 PSBR01_ART_G1_DR_ST500_BEA11 AREA 11 BEAM SCHEDULE REINFORCEMENT
12 PSBR01_ART_G1_DR_ST900_GE0011 AREA 11 3D MODEL

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

DRAWING LIST

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST001_GE011 NTS

SHEET SIZE REV. NO.


DATE PRINTED 25/04/2024 9:25:55 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

62200

6700 6100 4000 5200 5200 9000 9000 8500 8500

11.1
SSL=+0.200
SSL=+0.200 SSL=+0.200
SBS
3500

PHOSPHORIC
HCL CITRIC
SSL=+0.200

SSL=+0.200 SSL=+0.200
11.2

SSL=+0.000
11250

4050

FeCL3 ACETIC ACID LABORATORY CONTROL ROOM MCC-VFD ROOM

11.3
SSL=+0.200
BIOCIDE SSL=+0.000
SSL=+0.200 I S S U E S
3700

ANTIFOAM HYPO KMno4 CAUSTIC


ANTISCALANT
SSL=+0.200 SSL=+0.200
SSL=+0.200 SSL=+0.200 SSL=+0.200

11.4

No. Date Description Chk'd By


R E V I S I O N
PROJECT :
AREA 11 LOADING PLAN AT LEVEL 0.00
1 Scale 1 : 100 PURE SALMON LAND-BASED
ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 LOADING PLAN AT LEVEL


0.00
LEGENDS:

1000 kg/m2 DRAWN BY CHECKED BY APPROVED BY DATE


Eurocode 1 - Tab.6.2
PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_LL011
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:25:55 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

62200

6700 6100 4000 5200 5200 9000 9000 8500 8500

2000
300 F1
400
850 850 -1650
FTB1
F1 F1 F1 F1 F1 F1 F1 F1 F1
850

FTB1 FTB1 FTB1 FTB1


11.1 FTB1 FTB1 FTB1 FTB1
2000

2000

2000

2000

2000

2000

2000

2000

2000

2000
300
850

FTB1 FTB1
3500

FTB1

FTB1 2000 FTB1 2000 2000 2000 2000 FTB1 FTB1 2000 FTB1 2000 FTB1 2000 FTB1 2000
FTB1
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
FTB1 FTB1 FTB1
FTB1 FTB1 FTB1 FTB1 FTB1
2000

2000

2000

2000

2000

2000

2000

2000

2000

2000
11.2

2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
11250
4050

FTB1 FTB1
FTB1

FTB1 FTB1 FTB1 FTB1 FTB1 FTB1


FTB1
FTB1
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
FTB1 FTB1 FTB1 I S S U E S
FTB1 FTB1 FTB1 FTB1 FTB1
2000

2000

2000

2000

2000

2000

2000

2000

2000

2000
11.3

FTB1
FTB1 FTB1 FTB1
2000 2000 FTB1 2000 2000 2000 2000 2000 FTB1 2000 2000 2000
3700

FTB1 FTB1
FTB1

FTB1
FTB1
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
FTB1 FTB1
FTB1 FTB1 FTB1 FTB1 FTB1 FTB1
2000

2000

2000

2000

2000

2000

2000

2000

2000

2000
11.4
No. Date Description Chk'd By
R E V I S I O N
2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

AREA 11 FOUNDATION PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

LEGENDS:
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
F1 - FOOTING MARK Daerah Brunei - Muara,
Negara Brunei Darussalam
400 - FOOTING THICKNESS (mm)
-1.500 - BOTTOM OF FOOTING LEVEL (m) DRAWING TITLE :

AREA 11 FOUNDATION PLAN


NOTE:
- SOIL SHALL BE MEET THE FOLLOWING
PROPERTIES:
+ ALLOWABLE BEARING CAPACITY: 200 KPA
DRAWN BY CHECKED BY APPROVED BY DATE
+ ALLOWABLE SETTLEMENT LIMIT: 50 MM
- SOIL IMPROVEMENT SHALL BE DONE AS STATED PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5 IN CONSTRUCTION DRAWINGS BY SUPPLIER
JOB NO. DRAWING NO. SCALE
EXPERTISE
SCALE m PSBR01 1:100
1: 100 - ALL RELEVANT CONTRACTORS SHALL ST100_FOU011
COORDINATE TOGETHER BEFORE PROCEEDING SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:00 am
THE WORKS, ESPECIALLY PIPING SYSTEM. A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

62200

6700 6100 4000 5200 5200 9000 9000 8500 8500


570 3500 450 1900 520 5100 250 3500 1370 3000 830 1370 3000 830
C2 C2 C2
C2 C1 C2
C1 C1 C1 C1 C1 C1 C1 C1 C1
11.1
200

SSL=+0.200
SSL=+0.200 SSL=+0.200
2800

SBS
3500

PHOSPHORIC
HCL CITRIC
SSL=+0.200 C2
C2 C2 C2
C2
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1
SSL=+0.200 SSL=+0.200
11.2

SSL=+0.000
11250

4050

FeCL3 ACETIC ACID LABORATORY CONTROL ROOM MCC-VFD ROOM

C2 C2 C2
C1 C1 C1 C1 C1 C1 C1 C2 C1 C2 C1 C1 I S S U E S
11.3
SSL=+0.200
BIOCIDE SSL=+0.000

2639
SSL=+0.200
3700

ANTIFOAM HYPO KMno4 CAUSTIC


2850

ANTISCALANT C2 C2
SSL=+0.200 SSL=+0.200 C2 C2
C1 SSL=+0.200 C1 SSL=+0.200 C1 SSL=+0.200 C1 C2 C1 C1 C1 C1
865
C1
196

11.4
C1 No. Date Description Chk'd By
1200 1900 2500 1100 775 1900 700 1900 825 1000 2600 400 3500 700 3500 700
R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

AREA 11 GROUND FLOOR FRAMING PLAN


1 Scale 1 : 100

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

LEGENDS:
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
SOG - SLAB ON GRADE MARK Daerah Brunei - Muara,
150 - SLAB ON GRADE THICKNESS (mm) Negara Brunei Darussalam

0.000 - TOP OF SLAB ON GRADE LEVEL (m) DRAWING TITLE :


ALL RELEVANT CONTRACTORS SHALL
COORDINATE TOGETHER BEFORE PROCEEDING AREA 11 GROUND FLOOR FRAMING
THE WORKS, ESPECIALLY PIPING SYSTEM. PLAN

LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
COLUMNS & WALLS BELOW JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST100_FRA21
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:01 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 16 18


19
11.J

B2 CD2 G2

P
K6
62200
K5 RV
E1 F
A B1 C1 D1

6700 6100 4000 5200 5200 9000 9000 8500 8500 K4

M
K2 K3 J U

1
K8 N K1

G2 G2 G2 G2 G2 G2 G2
L G1
K7
G2 ST300_FRA011
G2
C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1
O

11.1

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


3500

NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,


G1

G1

G1

G1

G1

G1

G1

G1

G1

G1
G2 G2 G2 G2 G2 G2 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
G2 G2 G2 PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
11.2

2
ST300_FRA011
11250
4050

G1

G1

G1

G1

G1

G1

G1

G1

G1

G1
G2 G2 G2 G2 G2 G2
G2 G2 G2
C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1
11.3
3700

G1

G1

G1

G1

G1

G1

G1

G1

G1

G1
G2 G2 G2 G2 G2 G2
G2 G2 G2
C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1 G1 C1

11.4

AREA 11 FRAMING PLAN @ EL +5.00M


1 Scale 1 : 100

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

62200
6700 6100 4000 5200 5200 9000 9000 8500 8500
I S S U E S
1
ST300_FRA011
SC1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
11.1
3500

SB1

SC1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 No. Date Description Chk'd By
11.2 R E V I S I O N
PROJECT :
2
ST300_FRA011
PURE SALMON LAND-BASED
11250
4050

SB1

ATLANTIC SALMON FARM

SC1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
11.3
SB1
3700

CONSULTANT :
SC1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1

11.4 ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

AREA 11 ROOF FRAMING PLAN PLAN


2 Scale 1 : 100 PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

AREA 11 STEEL COLUMN SCHEDULE DRAWING TITLE :

NAME
SECTION
WEIGHT MATERIAL AREA 11 ROOF FRAMING PLAN
(kg/m)
SC1 HA 300x300x8x12 73.9 S355
HA300X250X8X12 64.4

DRAWN BY CHECKED BY APPROVED BY DATE


AREA 11 STEEL BEAM SECTION SCHEDULE
PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5 NAME WEIGHT MATERIAL
SECTION JOB NO. DRAWING NO. SCALE
(kg/m)
SCALE m PSBR01 1:100
1: 100 SB1 HA 300x200x8x12 73.9 S355 ST100_FRA22
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:02 am HA300X250X8X12 64.4
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

DELETE THE SAG ROD AT


THE CENTER
62200

6700 6100 4000 5200 5200 9000 9000 8500 8500


Z220X2 SPACED
@ 600 OC

11.1
3500

12 SAG ROD 10mm SAG ROD

11.2
11250
4050

11.3
3700

I S S U E S

11.4

PROVIDE SAG ROD AT


EVERY MIDDLE THIRD
No. Date Description Chk'd By
R E V I S I O N
PROJECT :

AREA 11 ROOF PURLIN PLAN PURE SALMON LAND-BASED


1 Scale 1 : 100
ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 ROOF PURLIN PLAN

DRAWN BY CHECKED BY APPROVED BY DATE


AREA 11 PURLIN SECTION SCHEDULE
PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5 NAME WEIGHT MATERIAL
SECTION JOB NO. DRAWING NO. SCALE
(kg/m)
SCALE m PSBR01 1:100
1: 100 Z220X2 Z 220x75x2x2 6.3 S355 ST100_FRA23
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:03 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1

11.1 11.2 11.3 11.4 11.4 11.3 11.2 11.1 K7

11250 NOTES
11250
3500 4050 3700 3700 4050 3500 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
+6.300 +6.300
g1.11 TOP OF ROOF g1.11 TOP OF ROOF

1300

1300
SB1
SB1 SC1
UPDATE THE +5.000 SC1 SB1 +5.000 G1 G1 G1
ELEVATION AND g1.11 TOP OF BEAM g1.11 TOP OF BEAM
HEIGHT FOR ALL G1SC1 G1 SC1 G1
SECTION VIEW

6300

6300
6800

5000

5000
5500

+0.200 LEAN CONCRETE (TYP.)


C1 +0.000 C1 LEAN CONCRETE (TYP.) +0.000
+0.000 C1 C1 +0.000 C1 C1 C1 C1
150

150
g1.11 +0.000 g1.11 +0.000
1100

1100
1500

1500
-0.150 -0.150
g1.11 -0.150 g1.11 -0.150
F1 FTB1 F1 FTB1 F1 FTB1 F1 F1 FTB1 F1 FTB1 F1 FTB1 F1

2000 2000 2000 2000 2000 2000 2000 2000

AREA 11 FRAMING ELEVATION @ GRID 11.A AREA 11 FRAMING ELEVATION @ GRID 11.J
1 Scale 1 : 100 2 Scale 1 : 100

11.J 11.I 11.H 11.G 11.F 11.E 11.D 11.C 11.B 11.A

I S S U E S
62200
8500 8500 9000 9000 5200 5200 4000 6100 6700

+6.300
g1.11 TOP OF ROOF
1300

+5.000 G1 G1 G1 G1 G1 G1 G1 G1 G1 SC1
SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
g1.11 TOP OF BEAM
No. Date Description Chk'd By
R E V I S I O N
6300

PROJECT :
5000

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
500mm THK. EQUIPMENT PAD (TYP.)
LEAN CONCRETE (TYP.) +0.200 +0.200
C1 +0.000 C1 +0.000 C1 +0.000 C1 +0.000 C1 C1 C1 C1 C1 C1
+0.000
150

g1.11 +0.000
1100
1500

-0.150
g1.11 -0.150
F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 F1 FTB1 F1 F1 FTB1 F1 FTB1 F1

2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS
AREA 11 FRAMING ELEVATION @ GRID 11.1
3 Scale 1 : 100
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 FRAMING ELEVATION

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST200_FRA011
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:07 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

11.1 11.2 11.3 11.4 L


K8
G1
N K1

K7

11250
NOTES
3500 4050 3700
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
+6.300 DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
g1.11 TOP OF ROOF BEFORE PROCEEDING THE WORK.

1300
SB1
SB1 SB1
+5.000
g1.11 TOP OF BEAM
G1 G1 G1

6300
5000
C1 C1 +0.000 C1 C1
+0.000

150
g1.11 +0.000

1100
1500
-0.150
g1.11 -0.150
F1 FTB1 F1 FTB1 F1 FTB1 F1

2000 2000 2000 2000


LEAN CONCRETE (TYP.)

AREA 11 FRAMING SECTION 1


1 Scale 1 : 100

11.A 11.B 11.C 11.D 11.E 11.F 11.G 11.H 11.I 11.J

62200
6700 6100 4000 5200 5200 9000 9000 8500 8500 I S S U E S

+6.300
g1.11 TOP OF ROOF
1300

SC1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1 SB1
+5.000 G1 G1 G1 G1 G1 G1 G1 G1 G1
g1.11 TOP OF BEAM

No. Date Description Chk'd By


6300

R E V I S I O N
5000

PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
+0.200 +0.200 500mm THK. EQUIPMENT PAD (TYP.)
C1 C1 C1 C1 C1 C1 +0.000 C1 +0.000 C1 +0.000 C1 +0.000 C1
+0.000
150

g1.11 +0.000
1100
1500

-0.150
g1.11 -0.150
F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1 FTB1 F1

2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
LEAN CONCRETE (TYP.)

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809
AREA 11 FRAMING SECTION 2
2 Scale 1 : 100
SCHEMATIC DESIGN PHASE
BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 FRAME SECTION

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
1 0 1 2 3 4 5
JOB NO. DRAWING NO. SCALE
SCALE m PSBR01 1:100
1: 100 ST300_FRA011
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:08 am
A1
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2
CONCRETE SLAB
+0.000 P
K5 K6
RV

k8.0.0

150
E1 F
A B1 C1 D1
K4

-0.150 K2 K3 J U

COLUMN TIES. K8 N K1

k8.-0.15 L G1
K7

COLUMN REINF. O

1200
1100

1500
NOTES

FOOTING THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
TIE BEAM STARTER BARS STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
400 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL

300
BEFORE PROCEEDING THE WORK.
-1.650

50
T12-200 T12-200
LEAN CONCRETE

SECTION F1 DETAIL
2 Scale 1 : 25

2000

50 800 50
50

2000
800
50
ST100_FRA01

I S S U E S
1

FOUNDATION PLAN F1
1 Scale 1:15

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


ATLANTIC SALMON FARM

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 FOOTING DETAILS

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024
150 0 150 300 450 600 750
JOB NO. DRAWING NO. SCALE
SCALE mm Notes: PSBR01 1:15
1: 15 1. ALL FOOTINGS SHALL BE COATED WITH BITUMINOUS MATERIAL.
ST500_FOU11
SHEET SIZE REV. NO.
DATE PRINTED 25/04/2024 9:26:09 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

Ldt TOP LEVEL


16 18

B2 CD2 G2

LEVEL + 5.500M P
K5 K6
RV

LINK SPACING (S1)


E1 F

S1
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1

lcr
K7

400 REINF. (REFER SCHEDULE)


O

12T25

STOREY HEIGHT
NOTES

400

LINK SPACING (S)

SPACING
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL

LINK
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,

S
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
FOUDATION SPACING OF LINKS AT LAP NOT DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE

50
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
GREATER THAN:

Iₒ
BEFORE PROCEEDING THE WORK.
∅ OF LONGITUDINAL BAR
- 12∅


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100

50
LINKS (S)

LINK SPACING (S1)


T10-200 T10-200 T10-200

MAX(lcr;Lt)

Lt
LEVEL

S1
KICKER 100
C1
COLUMN LEVEL (X+1)

50
LEVEL + 5.500M

S1
LINK SPACING (S1)
REINF. (REFER SCHEDULE)
400

lcr
14T25

500

STOREY HEIGHT

SPACING

LINK
S
LINK SPACING (S)
FOUDATION
SPACING OF LINKS AT LAP

Iₒ
NOT GREATER THAN:

50
∅ OF LONGITUDINAL BAR
- 12∅


- 0.6 x LESSER DIM OF COLUMN/WALL

Lt
- 100
LINKS (S) T10-200 T10-200 T10-200

50
A-A

LINK SPACING (S1)


LEVEL
C2

MAX(lcr;Lt)
COLUMN

Lt

S1
KICKER 100
LEVEL X

50
S1
45 Ø
I S S U E S

100MAX
S1
TYPICAL COLUMN/ WALL DETAIL
No. Date Description Chk'd By
R E V I S I O N
PROJECT :

CRANKED UPPER COLUMN/WALL BARS PURE SALMON LAND-BASED


ATLANTIC SALMON FARM
LOWER COLUMN/WALL BARS

A-A

NOTES:
CONSULTANT :
1. S: REFERS TO LINK SPACING IN COLUMN/WALL
SCHEDULE
2. S1 = MIN(bo/2; 100; 8dbL) ARTELIA Singapore Pte. Ltd.
bo: MINIMUM DIMENSION OF THE CONCRETE 6 Shenton Way – 39-02 OUE Downtown 1
CORE (THE CENTERLINE OF THE HOOPS) SINGAPORE 068809
dbL: MINIMUM DIAMETER OF THE LONGITUDINAL
BARS (mm)
3. lcr = MAX(hc; lo/6; 450)
hc: THE LARGEST CROSS-SECTIONAL DIMENSION SCHEMATIC DESIGN PHASE
OF THE COLUMN/WALL (mm). BUILDING G1
4. THE TIE C IN THE WEB (FOR RC WALL ONLY)
SHALL BE ALTERNATED ALONG WALL HEIGHT
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 COLUMN SCHEDULE


REINFORCEMENT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST500_COL11 NTS

SHEET SIZE REV. NO.


DATE PRINTED 25/04/2024 9:26:09 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

REINFORCEMENT BEAM SCHEDULE


BEAM SIZE SINGLE SPAN END SPAN INTERIOR SPAN CANTILEVER LINKS
BEAM
BEAM SIZE (BxH) TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. TOP REINF. BOTTOM REINF. LINK TYPE SIDE BARS REMARK
MARK B (mm) H (mm) S1 S2 S3
T11 T12 T13 B11 B12 B13 T21 T22 T23 B21 B22 B23 T31 T32 T33 B31 B32 B33 T41 T42 B41
FTB1 FTB1 300x400 300 400 2T16 2T16 2T16 2T16 2T16 2T16 2T16 2T16 2T16 2T16 2T16 2T16 10@100mm 10@100mm 10@100mm TYPE 1
G1 G1 350x500
300X500 350
300 500 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 3T20+3T20 10@150mm 10@150mm 10@150mm TYPE 1
G2 G2 300X500 300 500 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 3T16 10@150mm 10@150mm 10@150mm TYPE 1

W W
0.25L1 0.25L1 0.5L1 Max(L1 & 0.25L2)
(Min. Lt)
S1 S2
(Min. Lt)
S3 S2
(Min. Lt)
S1
(Min. Lt)
Max(0.5L1 & 0.25L2)
NORMAL LINK
e.g. 2R8-100/200
TORSION LINK
e.g. 2R8-100/200
NOTES:
2 1. * U.N.O. LAPPINGS ARE INDICATE ONLY. NO LAPPING IF THE
(Min. Lt)
REINFORCEMENT ARE OF SAME SIZE AND LENGTH OF REINFORCEMENT NOT

H
* LAP * LAP * LAP 1
T11 T12 T13 T41 T42 EXCEEDING 11.7M. REFER TO GENERAL NOTES FOR LOCATION AND LAP LENGTH.
DETAIL OF LINKS
2. ORIENTATION OF REBARS IN BEAMS (FROM LEFT TO RIGHT, BOTTOM TO TOP)
TYPE 1 TYPE 2 W SHALL SAME THAT OF BEAM MARKS.
W W
3. REFER TO GENERAL NOTES AND STANDARD DRAWINGS
PROVIDE 1T10 @800 (MAX)
FOR OTHER DETAILING REQUIREMENTS.
WHEN 600 < D1 < 1000
0.08L1 * LAP B12 SB * LAP 0.08L1 * LAP I S S U E S
2 2

H > 700
B11 B13 B41 SB 1 1 SB SB 4. Lt: TENSION LAP LENGTH.
PROVIDE 2T10 @800 (MAX)

H
3 3 4

D1
SPAN L1 SPAN L1 SPAN L2 SB SB WHEN 1000 < D1 < 2000

2/3H
SB SB
SINGLE SPAN CANTILEVER TYPE 3 TYPE 4

TYPES OF SHEAR LINKS TYPICAL BEAM SECTION WITH SIDE BARS

No. Date Description Chk'd By


0.25L1 Max(0.25L1 & 0.25L2) Max(0.25L1 & 0.25L2) Max(0.25L2 & 0.25L3) Max(0.25L1 & 0.25L2) 0.25L2 R E V I S I O N
(Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt) (Min. Lt)
S1 S2 S3 S1 S2 S3 S1 S2 S3 U.N.O SIDE BARS(SB) FOR BEAM DEPTH (H) > 700 PROJECT :

* LAP * LAP * LAP * LAP * LAP * LAP PURE SALMON LAND-BASED


BEAM DEPTH (H) NO. OF "SB" "SB" SIZE &
T21 T22 T23 T31 T32 T33 T21 T22 T23 EACH FACE SPACING ATLANTIC SALMON FARM

700 < H ≤ 900 2 WHERE W < 400


900 < H ≤ 1200 3 PROVIDE T12-200
SIDE BARS
1200 < H ≤ 1500 4
0.08L1 * LAP B22 SB * LAP 0.15L1 0.15L2 * LAP B32 SB * LAP 0.15L2 0.15L2 * LAP B22 SB * LAP 0.08L2 WHERE W ≥ 400
B21 B23 B31 B33 B21 B23 1500 < H ≤ 1800 5 PROVIDE T16-200
1800 < H ≤ 2000 6 SIDE BARS
SPAN L1 SPAN L2 SPAN L1 SPAN L2 SPAN L3 SPAN L1 SPAN L2
CONSULTANT :
END SPAN - LEFT INTERIOR SPAN END SPAN - RIGHT
ARTELIA Singapore Pte. Ltd.
6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 BEAM SCHEDULE


REINFORCEMENT

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST500_BEA11 NTS

SHEET SIZE REV. NO.


DATE PRINTED 25/04/2024 9:26:10 am
A1 00
G1 AREAS KEY PLAN NORTH

5
2 4 6

3 7
9
10
1
14
8

24 23
11 12 13
KEY PLAN
15 22
20 21
17

19

16 18

B2 CD2 G2

P
K5 K6
RV
E1 F
A B1 C1 D1
K4

M
K2 K3 J U

K8 N K1

L G1
K7

NOTES

THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL


NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.

I S S U E S

No. Date Description Chk'd By


R E V I S I O N
PROJECT :

PURE SALMON LAND-BASED


AREA 11 3D MODEL ATLANTIC SALMON FARM
1 Scale

CONSULTANT :

ARTELIA Singapore Pte. Ltd.


6 Shenton Way – 39-02 OUE Downtown 1
SINGAPORE 068809

SCHEMATIC DESIGN PHASE


BUILDING G1
STRUCTURAL DRAWINGS

PLOT NO. LOCATION


Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam

DRAWING TITLE :

AREA 11 3D MODEL

DRAWN BY CHECKED BY APPROVED BY DATE


PM CR/RB LG 03/26/2024

JOB NO. DRAWING NO. SCALE


PSBR01 ST900_GE0011 NTS

SHEET SIZE REV. NO.


DATE PRINTED 25/04/2024 9:26:16 am
A1

You might also like