Professional Documents
Culture Documents
Cont. On: E 2297.724M N 2880.185M EL +21.749M
Cont. On: E 2297.724M N 2880.185M EL +21.749M
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
S
N
3"
00
60 CONT. ON
S3
090-GF-31012/L83
S9_DIA_3-1-2879 E 2297.724M
S9-3-SS N 2880.185M
EL +21.749M
1
00
15
1
>
<1 S2
2 00 G0_DIA_3-1-6048
30
G0-3-SS
0
00
12 00
DesArea: 30
L82M02
DesArea:
L81M01
090-GF-31012/L82-S01
S2
00
30 G0_DIA_3-1-6050
G0-3-SS
S3
S9_DIA_3-1-2878
S3
S9-3-SS
S9_DIA_3-1-2877
00
S9-3-SS 30
1
CONT. ON >
<2 S2
090-GF-31012/L81
00 G0_DIA_3-1-6052
E 2279.724M 30
G0-3-SS
N 2880.185M
EL +21.749M
POS. ITEM SIZE LENGTH END 1 END 2 POS. ITEM SIZE LENGTH END 1 END 2
NO CODE (INS) (MM) NO CODE (INS) (MM)
WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY
1 3" BW FIELD
2 3" BW SHOP
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
090-GF-31012/L82-S01 3 1 215.76 5.027172 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 215.9 BP INTERNAL
3 1
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 3 1 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 19/07/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL ANG DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 090-GF-31012/L82 (Sht 1of 1 )
090-GF-31012_L82-C01A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0004
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
3 9CP0Z3 NI 0 93.00 76.00 142.40 99.80 213.60 H C+E+G NO A8 063-001-1 900-PID-0001-001 090 870310-PTS-900-PIP-BOK-66000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#090-GF-31012/L82# #IPLOT_spm_unit_number#090# #IPLOT_spm_fluid#GF# #IPLOT_spm_line_serial_number#31012# #IPLOT_spm_rev_code#C01# #IPLOT_spm_piping_specification#9CP0Z3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C01A#