Professional Documents
Culture Documents
Cont. On
Cont. On
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
SUPPORTS
SPOOL # 072-GL-31001/S40-S01
CONT. ON DRG 2
S2
C1_DIA_30"-1-2315
C1-B-450-160-30
88.8°
17
072-GL-31001/S40-S01
<1
78
>
30
4
"N
1
S
78
4
DesArea:
S40M42
DesArea:
S03I01
CONT. ON
072-GL-31001/S03
E 1861.460M
N 4198.868M
45°
EL +8.361M
30"NS
POS. ITEM SIZE LENGTH END 1 END 2 POS. ITEM SIZE LENGTH END 1 END 2
SPOOL # 072-GL-31001/S40-S01, CONSIST OF SHEET 1 & 2 <1> AAP17 30" 784 BEVEL BEVEL
WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED SECURITY CLASSIFICATION
bp
OTHERWISE TOTAL FABRICATION 430.8 BP INTERNAL
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 04/07/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL ANG DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 072-GL-31001/S40 (Sht 1of 2 )
072-GL-31001_S40-C01A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0003
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
30 1SA0K3 CI 160 70.00 -161.60 19.30 8.50 21.23 P C+D+G+H NO A8 072-001-1B/072-001-1C 072-PID-0001-001 072 870310-PTS-900-PIP-BOK-65000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#072-GL-31001/S40# #IPLOT_spm_unit_number#072# #IPLOT_spm_fluid#GL# #IPLOT_spm_line_serial_number#31001# #IPLOT_spm_rev_code#C01# #IPLOT_spm_piping_specification#1SA0K3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C01A#
FABRICATION MATERIALS
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
SKIN TEMPERATURE SHALL BE 1 NPS:30-Thk:7.92mm-PIPE- ASTM A358 TP304/TP304L 30 AAP17 24.000 M 3535.2
INSTALLED BEFORE INSULATION CL.1 DUAL GRADE - EFW
DETAIL (NOTE) A
ERECTION MATERIALS
PT N.S.
NO COMPONENT DESCRIPTION (INS) ITEM CODE QTY WEIGHT
INSTRUMENTS
DesArea:
S41M43
DesArea:
S40M42
3
CONT. ON
072-GL-31001/S41 3
42 <3> 1
E 1861.994M 1
2
0
N 4223.647M 0
0
EL +8.361M 88.8°
S3 S3
C1_DIA_30"-1-3021 19 C1_DIA_30"-1-2316
59
C1-B-450-160-30 5 <2> 1 C1-B-450-160-30
072
2 30"X1/4"NS
TE
REINFORCED
31041A
7
S2 6 5
0
6 0
CG1_DIA_30-1-1311 0 SEE DETAIL A
0
0
CG1-B-450-160-30 E 1861.572M
N 4204.051M
072 EL +8.361M
TE
072-GL-31001/S40-S01
31042A
6000
4 4
4
0
SEE DETAIL A 0
1500
30"X1/4"NS
REINFORCED
3
0
"N
S
WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY
1 30" BW SHOP
2 30" BW SHOP
3 30" BW FIELD
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
072-GL-31001/S40-S01 60 2 5104.66 59.33021 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 4674.0 BP INTERNAL
60 2
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 30 1 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 04/07/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL ANG DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 072-GL-31001/S40 (Sht 2of 2 )
072-GL-31001_S40-C01A_002.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0003
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
0.25 1SA0K3 CI 160 70.00 -161.60 19.30 8.50 21.23 P C+D+G+H NO A8 072-001-1B/072-001-1C 072-PID-0001-001 072 870310-PTS-900-PIP-BOK-65000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#072-GL-31001/S40# #IPLOT_spm_unit_number#072# #IPLOT_spm_fluid#GL# #IPLOT_spm_line_serial_number#31001# #IPLOT_spm_rev_code#C01# #IPLOT_spm_piping_specification#1SA0K3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C01A#