Professional Documents
Culture Documents
Spool # 072-GL-31004/L58-S01: e 1858.612M N 4756.894M El +8.030M
Spool # 072-GL-31004/L58-S01: e 1858.612M N 4756.894M El +8.030M
Spool # 072-GL-31004/L58-S01: e 1858.612M N 4756.894M El +8.030M
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
FITTINGS
SUPPORTS
SPOOL # 072-GL-31004/L58-S01
CONT. ON DRG 2
6
26
88.8° DesArea:
<2> 1 L08I18
1
8"NS 2 DesArea:
3
0
5 L58M19
S3
12 C1_DIA_8"-1-1201
30
2
C1-A-300-130-8
S4 S1
072-GL-31004/L58-S01 CONT. ON
CF1_DIA_8-1-139
072-GL-31004/L08
CF1-400-8-SS 1935
E 1858.612M
5 N 4756.894M
9 NS
9 EL +8.030M 8"
9
S3
C1_DIA_8"-1-1200
2
C1-A-300-130-8 90°
<1> 1
9
5
0
3
2 34
88.8° 19
1
42
WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY
1 8" BW FIELD
2 8" BW SHOP
3 8" BW SHOP
S1 8" FW SHOP
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
072-GL-31004/L58-S01 24 3 523.03 12.05115 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 454.6 BP INTERNAL
24 3
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
C02A 05/07/2018 RE-ISSUED FOR CONSTRUCTION ANG DYT FAJ JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 8 1 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 06/02/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL MHS AHI/MHD FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 072-GL-31004/L58 (Sht 1of 2 )
072-GL-31004_L58-C02A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0004
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
8 1SA0K3 CI 130 70.00 -161.60 19.30 8.50 21.23 P C+D+G+H NO A8 072-003-1/072-003-1B 072-PID-0001-001 072 870310-PTS-900-PIP-BOK-66000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#072-GL-31004/L58# #IPLOT_spm_unit_number#072# #IPLOT_spm_fluid#GL# #IPLOT_spm_line_serial_number#31004# #IPLOT_spm_rev_code#C02# #IPLOT_spm_piping_specification#1SA0K3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C02A#
FABRICATION MATERIALS
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
SKIN TEMPERATURE SHALL BE 1 NPS:8-Thk:3.76mm-PIPE- ASTM A358 TP304/TP304L 8 AAE02 2.920 M 58.4
INSTALLED BEFORE INSULATION CL.1 DUAL GRADE - EFW
SUPPORTS
ERECTION MATERIALS
C02A
PT N.S.
NO COMPONENT DESCRIPTION (INS) ITEM CODE QTY WEIGHT
INSTRUMENTS
DesArea:
072 C02A
072-GL-31004/L58-S01 L58M19
TE
1360 DesArea:
31044H
L09I19
2 4
88.8° 90° SEE DETAIL A
6
575
34
<
5 CONT. ON
3
88.8°
>
7 072-GL-31004/L09
1
E 1858.911M
15 N 4770.791M
1
95 <
5
E 1858.337M 4> EL +8.030M
9
1
5
N 4770.803M
S3 EL +8.030M
12
C1_DIA_8"-1-1202
8
"N
C1-A-300-130-8 8"X1/4"NS
S
5
REINFORCED 57
6
4
5
4 SPOOL # 072-GL-31004/L58-S01
CONT. FROM DRG 1
WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY WELD SIZE TYPE CATEGORY
4 8" BW SHOP
5 8" BW SHOP
6 8" BW SHOP
7 8" BW FIELD
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
072-GL-31004/L58-S01 24 3 523.03 12.05115 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 68.5 BP INTERNAL
24 3
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
C02A 05/07/2018 RE-ISSUED FOR CONSTRUCTION ANG DYT FAJ JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 8 1 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 06/02/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL MHS AHI/MHD FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 072-GL-31004/L58 (Sht 2of 2 )
072-GL-31004_L58-C02A_002.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0004
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
0.25 1SA0K3 70.00 -161.60 19.30 8.50 21.23 P C+D+G+H NO A8 072-003-1/072-003-1B 072-PID-0001-001 072 870310-PTS-900-PIP-BOK-66000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#072-GL-31004/L58# #IPLOT_spm_unit_number#072# #IPLOT_spm_fluid#GL# #IPLOT_spm_line_serial_number#31004# #IPLOT_spm_rev_code#C02# #IPLOT_spm_piping_specification#1SA0K3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C02A#