Professional Documents
Culture Documents
Cont. On: 072-GI-31001 - S44-C02A - 001.DWG
Cont. On: 072-GI-31001 - S44-C02A - 001.DWG
DesArea:
N L40M01
PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
DesArea:
1 NPS:2-Thk:8.74mm-PIPE - NPT ENDS-ASTM A106 GR.B - 2 AAM01 23.799 M 264.2
S44M46
1 SMLS- GA-E-60028
FITTINGS
S4
CONT. ON J1
2 NPS:2-COUPLING - THD ENDS - ASME-B16.11-3000-ASTM 2 DG730 4 5.6
S8_DIA_2-1-3476
072-GI-31001/L40 A105 Normalized -GA-E-60028
S8-100-300-2
E 1862.247M
3 6 7 FLANGES
N 4319.667M
2" 18
EL +9.810M N 3 NPS:2-THD FLANGE - ASME-B16.5-CL150-RF-ASTM A105 2 BB0CK 2 4.6
S 03
Normalized -GA-E-60028
7
51 SUPPORTS
88.8° 47
S5
11 4 SADDLE WITH RUBBER FOR PIPES 1/2"- 60" NPS 2 S8-100-300 4 29.4
00 <1> 1 G2_DIA_2-8-1-6577 5 GUIDE ON SADDLE FOR HORIZONTAL INSULATED PIPES 2 G2 4 4.2
1/2" - 80" NPS
G2-2
2
C02A TOTAL FABRICATION WEIGHT 308.0
3 60
ERECTION MATERIALS
2 00
PT N.S.
49 48 NO COMPONENT DESCRIPTION (INS) ITEM CODE QTY WEIGHT
00 S5
<2> 1 GASKETS
G2_DIA_2-8-1-6575
6 NPS:2-CL150-RF- SP.WOUND GSKT-with OUT.& 2 TT091 1 -
S5 BOLTS
7 60
2 00
60
01
S4 48
S8_DIA_2-1-3472
<4> 1
S8-100-300-2
8
DesArea:
S43M45
072-GI-31001/S44-S01
40
04 DesArea:
2
S4 S44M46
S8_DIA_2-1-3470 9
10
S8-100-300-2 <
5>
1
CONT. ON
072-GI-31001/S43
E 1861.730M
N 4295.672M
EL +9.810M
POS. ITEM SIZE LENGTH END 1 END 2 POS. ITEM SIZE LENGTH END 1 END 2
NO CODE (INS) (MM) NO CODE (INS) (MM)
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED SECURITY CLASSIFICATION
bp
OTHERWISE TOTAL FABRICATION 308.0 BP INTERNAL
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
C02A 18/07/2018 RE-ISSUED FOR CONSTRUCTION RHD DYT FAJ JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 07/03/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL GLS DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 072-GI-31001/S44 (Sht 1of 1 )
072-GI-31001_S44-C02A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0003
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
2 1CG1U3 NI 0 80.00 50.00 10.80 8.10 11.88 P C+D+G YES (If Thk > 20mm) A7 N/A 070-PID-0003-001 072 870310-PTS-900-PIP-BOK-65000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#072-GI-31001/S44# #IPLOT_spm_unit_number#072# #IPLOT_spm_fluid#GI# #IPLOT_spm_line_serial_number#31001# #IPLOT_spm_rev_code#C02# #IPLOT_spm_piping_specification#1CG1U3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C02A#