Professional Documents
Culture Documents
Cont. On: Shop B-SP Shop B-SP Shop B-SP
Cont. On: Shop B-SP Shop B-SP Shop B-SP
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
1 NPS:6-PN20-PIPE - BELL & SPIGOT ENDS - <MFR Std - 6 AAQ35 23.066 M 83.1
Plastic>-RTR-EPOXY
FITTINGS
SUPPORTS
DesArea:
E44M11
DesArea:
E45M12
090-WH-31006/E44-S01
26
75
S4 2
G2_DIA_2-8-1-15368 90°
2
G2-6 5
25
12
<1
>
1 CONT. ON
S4 090-WH-31006/E45
G2_DIA_2-8-1-15384 1 E 2460.875M
G2-6 N 2877.300M
01
14 EL +23.184M
DesArea:
E44M11
DesArea: S3
00
E43M10 60 Y1_DIA_6-1-4393
6"
Y1-20-6 N
S
46 1
86 >
<2
3
CONT. ON 00
60
090-WH-31006/E43
E 2439.974M
N 2879.975M
EL +23.184M S3
1 Y1_DIA_6-1-4396
>
<3
Y1-20-6
00
60
S3
Y1_DIA_6-1-4399
Y1-20-6
S S3
N
6"
Y1_DIA_6-1-4402
Y1-20-6
POS. ITEM SIZE LENGTH END 1 END 2 POS. ITEM SIZE LENGTH END 1 END 2
NO CODE (INS) (MM) NO CODE (INS) (MM)
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
090-WH-31006/E44-S01 18 3 90.52 12.405326 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 90.6 BP INTERNAL
18 3
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 01/08/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL BMP DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 090-WH-31006/E44 (Sht 1of 1 )
090-WH-31006_E44-C01A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0006
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
6 12FE0B3 NI 0 83.00 49.50 7.00 3.50 10.50 H N/A NO NO 100-001-1 900-PID-0001-003 090 870310-PTS-900-PIP-BOK-68000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#090-WH-31006/E44# #IPLOT_spm_unit_number#090# #IPLOT_spm_fluid#WH# #IPLOT_spm_line_serial_number#31006# #IPLOT_spm_rev_code#C01# #IPLOT_spm_piping_specification#12FE0B3# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C01A#