Professional Documents
Culture Documents
Cont. On: BW BW BW BW
Cont. On: BW BW BW BW
Cont. On: BW BW BW BW
N PT
NO COMPONENT DESCRIPTION
N.S.
(INS) ITEM CODE QTY WEIGHT
PIPE
FITTINGS
SUPPORTS
CONT. ON S4
6
090-GF-31013/L83 <3 S5_DIA_10-1-2837
> S
1 "N
E 2318.848M S5-100-300-10-CS 10
N 2879.114M 5 12 24
<2 38 26
EL +25.281M > 1 S3
1 1
> S3 P_21_B_200-1-1111
<4 4
P21-BM-400-200 CONT. ON
S10
090-GF-31013/L85
SF5_DIA_10-1-811
S1 E 2326.848M
SF5-150-450-400-10-CS N 2864.965M
AXIAL STOP GAP=20MM
S EL +25.335M
"N S2
10 1
3
S9
1
P_21_A_110-1-1211 79 >
49 <1
P21-AN-500-110
S8
P_6_HEA200-1-1513 2
00
P6-H200-800_3 S7 70
21
S5_DIA_10-1-2836 87 2
90° DesArea:
S5-150-300-10-CS
L85M05
DesArea:
L84M04
090-GF-31013/L84-S01
S5
P_21_B_130-1-701
P21-BF-300-130
POS. ITEM SIZE LENGTH END 1 END 2 POS. ITEM SIZE LENGTH END 1 END 2
NO CODE (INS) (MM) NO CODE (INS) (MM)
REMARKS:
SPOOL TABLE
BUTT WELD
TANGGUH EXPANSION PROJECT
NOTES: @BP p.l.c.
SOCKET WELD
090-GF-31013/L84-S01 80 8 1288.86 18.718298 SECURITY CLASSIFICATION
1. ALL DIMENSION, COORDINATES AND ELEVATIONS ARE IN MILLIMETER UNLESS NOTED bp
OTHERWISE TOTAL FABRICATION 1289.3 BP INTERNAL
80 8
2. ALL DIMENSION ARE TO CENTER LINE OR FACE OF FLANGES UNLESS NOTED OTHERWISE
JOB NO.
3. FIELD WELDINGS FOR INSTALLATION TO BE DEFINED BY CONSTRUCTION TOTAL ERECTION 10 1 0.0 SCREWED
4. HANDWHEELS OR LEVER ORIENTATION FOR VALVE TO BE CHECKED AT INSTALLATION
SPOOL CODE NR. OF WELDS WEIGHT (Kg) PAINT/INS (sq.m) C01A 16/07/2018 ISSUED FOR CONSTRUCTION 870310
5. NO MODIFICATION FOR CRITICAL LINES WITHOUT PRIOR APPROVAL BMP DYT FAJ
6. IN CASE OF DISCREPANCY BETWEEN THE LINE LIST AND DATA SHOWN ON ISO, LINE LIST REV. TITLE
OPER. DES. OPER. TEST DATE DRAWN CHKD. APPD K: FABRICATION F: ERECTION SCALE
DES. DESCRIPTION
SHALL BE DOMINANT
NPS Piping Insul. Insul. Thk. TEMP. TEST PAINT
No. PIPING ISOMETRIC
TEMP. PRESS. PRESS. PRESS. NDT
7. IN CASE OF DISCREPANCY BETWEEN THE TEST BLOCK DIAGRAM AND "TEST FLUID" OR PWHT
(Inch) Class Type (mm) (°C) (Kg/Cm2G) (Kg/Cm2G)(Kg/Cm2G) FLUID CODE CODE N.T.S.
"TEST PRESS." SHOWN ON ISO, TEST BLOCK DIAGRAM SHALL BE DOMINANT. (°C)
X SHOP WELD 090-GF-31013/L84 (Sht 1of 1 )
090-GF-31013_L84-C01A_001.DWG
DOCUMENT CLASS COMPANY DRAWING NUMBER
X FIELD WELD
REFERENCE DRAWING:
PIPING FABRICATION DRAWING NUMBER 3
- PWHT : - COORDINATE SYSTEM:
TEP-900-ISO-PP-BP4-0004
STRESS CALC. NR. PIPING GA DRAWING P&ID N. <1> DENOTES PIPE PIECE NR.
LE NO:
TEP-900-SPE-PP-BP4-1009 TEP-900-PRC-PP-BP4-0001 A3
10 1CS2P33 TE 50 265.00 233.73 8.00 0.37 12.70 H A+D YES (If Thk > 20mm) A5 011-012-1 011-PID-0004-001 090 870310-PTS-900-PIP-BOK-66000
EXTRACTION DATE:
EXTRACTION TIME:
#IPLOT_spm_csdms_organization#spooling#
#IPLOT_object_name#090-GF-31013/L84# #IPLOT_spm_unit_number#090# #IPLOT_spm_fluid#GF# #IPLOT_spm_line_serial_number#31013# #IPLOT_spm_rev_code#C01# #IPLOT_spm_piping_specification#1CS2P33# #IPLOT_spm_project#870310# #IPLOT_spm_csdms_remarks## #IPLOT_spm_fab_rev_code#C01A#