Professional Documents
Culture Documents
Ballast
Ballast
NRP-01
PIPE SIZING MAIN BILGE Tanggal 00/03/2024
Rev. No. 1
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 N)
Din= f(Qballast.Valiran)
V= 2202,9132
f= 6-12 jam
Diambil= 480 jam
Valiran= 2 sampai 4 m/s
Diambil= 4
Qballast= 4,5894025
Din= 18,35761
Din=
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 C)
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 C)
Doc. No. NRP-01
PIPE SELECTION MAIN BILGE Tanggal 00/03/2024
Rev. No. 1
`
Doc. No. NRP-01
PIPE SELECTION BRANCH BILGE Tanggal 00/03/2024
Rev. No. 1
l = 19,6 m
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 N)
dZ = 81,7127 mm
= 3,2170 inch
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 C)
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 C)
Doc. No. NRP-01
PIPE SIZING BRANCH BILGE Tanggal 00/03/2024
Rev. No. 1
`
Doc. No. NRP-01
BALLAST PUMP Tanggal 00/03/2024
Rev. No. 1
2. Detail Pemilihan Pompa Sistem Oily Bilge
2.1 Capacity of ballast Pumps Din= f(Qballast.Valiran)
V= 2202,9132
f= 6-12 jam
Diambil= 10 jam
Valiran= 2 sampai 4 m/s
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 N) Diambil= 4
Q = 220,29 m^3/h Qballast= 220,29132
Din= 881,16528
3.2 Bilge Flow Velocity Din=
To calculate the blige’s flow velocity of the fluid, we could calculate by
Q = vxA
Q = 220,29 m^3/h A 1/4phi D2
A = 0,02863 m^2
v = 7693,445 m/h
v = 2,1 m/s
2
hf suc = λ x L x v / (D x 2g)
L= Panjang pipa di sisi hisap
= 90,371 m
g= Gravitasi
9,8 m²/s
D = inside diameter of pipe
v = flow velocity
hf = 2,80 m
SDNRV 0 1,35 0
3 remotely
4 Strainer 4 1 4
5 T joint 24 0,3 7,2
Total n x k 29,8
Doc. No. NRP-01
BALLAST PUMP Tanggal 00/03/2024
Rev. No. 1
hm suc = Ʃ nk x v² / 2g
= 6,94 m
(BKI PART 1 VOL III Rules For Machinery Installation 2022, Sec. 11 N)
K1 = 0.015, for ship which using HFO and purifier 0,015
0.005, for ship which using MDO or HFO but no using purifier
C = Fuel Oil Consumption per day (m3)
D = Endurance (lama pompa bilga bekerja)
Bilge holding tank capacity can be calculated with equation in design requirement number
Vbht = P/250 where, P = 5962,75 kW
3
Vbht = 23,851 m
Planned dimension of the tank is
l= m
w= m
h= m
so, the volume of the tank is
3
V= 0m
Q= Axv
where,
v= 2,5 m3/h
Q= 0 from the table
= 0,000694 m3/s
Therefore, the result of the calculation is
A = 0,000278 m2
A=
= 0,018803 m
= 19 mm
Doc. No. NRP-01
PERHITUNGAN SISTEM BILGA (CLEAN AND DIRTY Tanggal 00/03/2024
Rev. No. 1
(BKI VOL III Rules For Machinery Installation 2022, Sec. 11 Piping Systems, Valves and Pumps)
Diambil =
Da = mm = 0 inch
s = mm = 0 inch
v = flow velocity
hf suc = #DIV/0! m
SDNRV 1,35 0
3 remotely
4 Strainer 1 0
5 T joint 0,3 0
Total n x k 0
hm suc = Ʃ nk x v² / 2g
= 0,00 m
hm dis = Ʃ nk x v² / 2g
= m