You are on page 1of 1

Digitalization Roadmap 2022-2025

2022 2023 2024 2025 2026


E- Sign Eng. Doc
GOALS
(Auto Reminder)

MCS Upgrade-1 : 20% Model MC


0 PAPER
Operational Mieruka

MCS Upgrade-2 (expanse) : 100% Model MC


(Mieruka E-Manual Book,
(Mieruka E-Manual Book, History, SOP, etc)
History, SOP, etc) Muda ↓ : 3%
E-Check Sheet & E-Check Sheet & E-SOP (expanse) & Upgrade-2
E-SOP STEP 1, 10% Line, Upgrade-1, 100% Line, (IMS & MCS
0 PAPER
Dig. Manufacturing

(Mieruka Control) (Auto Alarm Abnormality) Connection)


IMS Upgrade-1 0 BM*
IMS Upgrade-2 *Because of lack of
(Real Time Control Stock) :
(Expanse to MC & Sparepart) mieruka)
(Proto Tool Center)
E-Dekidaka Expanse E-Dekidaka Expanse
STEP 1, 30% Line STEP 2 ,100% Line
E-Dekidaka Upgrade-1 Reduce Slow
(IMS Connection)
(Mieruka Control) (Mieruka Control)
: 100% Auto Alarm Moving : 3%
Strengthen Foundation: Expanse Readiness-1 : Abnormality, Inventory OP
Integrated System

MC Structure : 10% MC Structure : 50%


Manufacturing

PM Reminder, BM
Big Data : 10% Big Data : 50% Prediction
Upgrade

Infrastructure : 10% Infrastructure : 50%


Expanse Readiness-2 : E-Dekidaka
MC Structure : 100% Upgrade-2 WIP ↓ : 3%
Big Data : 100% (WIP Control –
Infrastructure : 100% 10 % Proto Line)

0 Towing
Acceleration
Technology

AGV Assy-Pre AGV DC- AGV Shaft AGV Forklift


Wash Machining Assy Warehouse Reduce MP Log :
…….. / Shift

You might also like