Design of Temporary Structures FORMWORK DEPARTMENT
B. HOOP BARS
1. I-Beams must be fixed to the Slab/Beam using hoop/deformed bars.
❖ Section Properties:
▪ Bar Diameter, d = 28 mm
▪ Yield Strength (Gr. 60), Fy = 414 MPa
❖ Notes:
▪ Hoop Bars must be embedded at Beams.
▪ Steel Plate must be provided at each end of I-Beam at least 1 inch thick.
❖ No. of Hoop Bars on each end of I-Beam = 5 pcs (Min)
2. Hoop Bars must be welded
❖ Weld Properties
▪ Weld = E7018 (Full Weld)
▪ Minimum Length, L = 30 mm
3
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. SHORING SUPPORTS
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports per Beam = 10 pcs
3. Shoring Jack Spacing, S = 250 mm (Max)
4. Notes:
❖ No. of Supported Levels below the Collar = 3 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
Schedule 40
Size = 1.5”Φ (Min)
Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
No. of Bolts = 2 pcs (Min)
Specs = A325
Diameter, d = 5/8”Φ x 3.5”
4
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
B. HOOP BARS
1. Bases/Legs must be fixed to the Slab/Beam using hoop/deformed bars.
❖ Section Properties:
▪ Bar Diameter, d = 28 mm
▪ Yield Strength (Gr. 60), Fy = 414 MPa
❖ Notes:
▪ Hoop Bars must be embedded at Beams.
❖ No. of Hoop Bars on each end of I-Beam = 5 pcs (Min)
5
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. SHORING SUPPORT
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports per Base/Leg:
Level of Support 16T 8T 4T
6
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
E. NOTES & REMINDERS
1. Preparation of the Derrick Crane and its Supports shall be in accordance to the Equipment Manual.
2. All materials should be in good condition.
3. Separate Design Calculation shall be made if:
❖ Base/s is/are seated on a slab;
❖ Supporting concrete beams have small sections (intermediate beam);
❖ High Elevation shoring supports are required.
4. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.
7
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
8
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
9
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
10
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
1. PLAN
2. Section
1750
11
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
3. Front Elevation
B. MATERIAL SPECIFICATIONS
1. Steel Members
❖ Yield Strength, Fy = 248 MPa (A36)
2. Shoring Posts
❖ Capacity, Pcap = 3.0 T (Min)
❖ No. Of Shoring Jacks per I-Beam = 6 pcs (Min)
❖ NOTE: Lower Level must also be supported by Shoring Jacks (at least 4 pcs per I-Beam.)
3. Hoop Bars / Embedded Rebar Anchor
❖ Yield Strength, Fy = 414 MPa (Gr. 60)
❖ Diameter, d = 28mm Φ (Min)
❖ No. Of Hoop Bars per I-Beam = 3 pcs (Min)
4. Connections
❖ All connections must be Full Weld (E7018).
12
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
B. POST
1. Specification: Schedule 40
13
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. TRUSSES
1. Member Specifications
❖ Top Chord & Bottom Chord (G.I. Pipe)
▪ Specification: Schedule 40
▪ Size: 2”Φ G.I. Pipe
▪ Thickness: 2.8 mm
❖ Web (Deformed Bar)
▪ Yield Strength, Fy = Gr. 60
▪ Diameter, d = 12mm
❖ Knee Brace (G.I. Pipe) – for truss lengths more than 10m.
▪ Specification: Schedule 40
▪ Size: 2”Φ G.I. Pipe
▪ Thickness: 2.8 mm
❖ Connection
▪ All connection shall be Full Weld (E7018).
2. Truss Configuration
Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE
8.0 m
14
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE
10.0 m
12.0 m
15.0 m
15
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE
18.0 m
20.0 m
1. Member Specifications
❖ Specification: Schedule 40
❖ Size: 1.5”Φ G.I. Pipe
❖ Thickness: 2.3 mm
2. Spacing
❖ Running Spacing ≤ 500 mm
3. Connection
❖ All Runner should be connected to the Trusses.
16
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
E. STANDARD LAYOUT
1. Bay Length = 5.00m
❖ Bay Length may be more than 5.00m if there are:
▪ Obstructions such as plants, posts, etc.
▪ Entries or Gates
In such cases, the new design must subject to Checking/Analysis by COSG Formwork.
❖ The OSP layout should consist of independent frames assembled at every 5-meter bay as shown in
the figure
2. G.I. pipe runners of adjacent frames should be staggered with a clear distance of 5.0 mm – 10.0 mm
3. Concrete Pedestals of adjacent frames should have a clear spacing of 25.0 mm (Max)
17
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
18
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
19
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
H-FRAME SET-UP
20
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
A-FRAME SET-UP
C. FRAME
1. H-Frame (1.70 meter height x 1.20 meter width)
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe
22
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
3. Pipe
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe
D. ANCHORAGE/TIE-IN
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe
❖ Connector: Swivel Clamp
❖ One end connected at every leg with maximum vertical distance of 2 meters or per frame leg
whichever has lesser length. The other end should be connected at concrete column or shoring jack
set up.
E. CROSS BRACE
❖ Specification: Schedule 40
❖ Sizes of Members:
▪ 1” Φ Pipe for Frames
▪ 1.5” Φ Pipe for Scaffold Pipe
23
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
G. CONNECTION DETAILS
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe
1. VERTICAL SPLICING
2. HORIZONTAL/DIAGONAL SPLICING
H. PLATFORM
❖ Catwalk with minimum thickness of 1.10 mm
❖ Width of 450 mm
❖ Maximum unsupported length 1.8 meters
24
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
H-FRAME SET-UP
25
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
A-FRAME SET-UP
26
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. CONNECTION DETAILS
❖ Specification: Schedule 40
❖ Sizes of Members:1.5”Φ Pipe
3. VERTICAL SPLICING
4. HORIZONTAL/DIAGONAL SPLICING
28
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
D. SUPPORT AGAINST THE WALLS
1. Use Base Jacks to support the scaffold against the wall at every 1.5m (braced length).
2. Base jacks should be seated on stable, leveled and fixed position
29
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
2. HORIZONTAL/DIAGONAL SPLICING
C. ANCHORAGE/TIE-IN
1. Rebar Specifications for Anchorage to Soil:
❖ Soil Bearing Capacity: 200 KPa and above
❖ Diameter, d = 36 mm
❖ Embedment Length, L = 820 mm (Min)
❖ Number of connection to soil/earth at every 2 frames: 4 anchors to soil/earth
32
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
2. G.I. Pipe Specifications for Tie-in to Existing Structures
❖ Size: 1.5”ΦG.I. Pipe
❖ Thickness, t = 2.3 mm (Min)
❖ Connector: Swivel Clamp
D. CONCRETE PAD
1. Concrete Specification:
❖ Strength, f’c = 3000 psi
❖ Dimensions (Min)
▪ L =300 mm , W= 300 mm, D = 100 mm
* Concrete pads are required for scaffolding with height of 10 m and above for access rest on soil.
33