You are on page 1of 33

MAKATI DEVELOPMENT CORPORATION

CONSTRUCTION METHODS AND SOLUTIONS GROUP


INNOVATIVE TECHNOLOGY DIVISION
FORMWORK DEPARTMENT

BOOK OF STANDARDS
DESIGN OF TEMPORARY STRUCTURES

Approved by:

JAIME P. DOMINGO JR.


Building Systems Head, MDC CMSG

V 1.0 © 2016

MAKATI DEVELOPMENT CORPORATION


1/F, Bonifacio Technology Center
31st Street corner 2nd Avenue, Bonifacio Global City
Taguig City, Metro Manila, 1634 Philippines
Tel Nos. (02) 717-5500
www.mdc.com.ph
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

DESIGN OF TEMPORARY STRUCTURES


TABLE OF CONTENTS

I. Tower Crane Support ….………………………………………………………………………………………….. 03

II. Derrick Crane Support …………………………………………………………………………………………….. 05

III. Placing Boom Support ……………………………………………………………………………………………. 07

IV. Passenger Hoist Support ………………………………………………………………………………………… 08

V. Staging Area Support ……………………………………………………………………………………………… 09

VI. Material Loading Platform ……………………………………………………………………………………….. 10

VII. Overhead Safety Protection …………………………………………………………………………………….. 12

VIII. Access & Scaffolding ………………………………………………………………………………………………. 16

A. Perimeter Scaffolding ……………………………………………………………………………….…….. 16

B. Anchored to Soil ………………………………………………………………………………..…………….. 16

C. At Elevator Shaft …………………………………………………………………………….……………….. 22

2
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

I. TOWER CRANE SUPPORT


A. I-BEAM
1. I-Beam Section: W14 x 311
❖ Section Properties:
▪ Flange Width, b = 412.24 mm
▪ Flange Thickness, tf = 57.40 mm
▪ Depth, d = 434.85 mm
▪ Web Thickness, tw = 35.81 mm
▪ Area, A = 58968 mm2
▪ Moment of Inertia, I = 1802x106 mm4
▪ Section Modulus, S = 8292x103 mm4
▪ Modulus of Elasticity, E = 200 GPa
▪ Yield Strength (A36), Fy = 248 Mpa
2. If W14 x 311 is not available, use I-Beam Section with Moment of Inertia, I, more than 1,463 x 106 mm4.
3. Allowable Length of I-Beams for Specific Types/Weight of Tower Cranes
Tower Crane Weight 80T 90T 100T
Max. Allowable Clear Span (m) 8.5 m 8.0 m 7.0 m

B. HOOP BARS
1. I-Beams must be fixed to the Slab/Beam using hoop/deformed bars.
❖ Section Properties:
▪ Bar Diameter, d = 28 mm
▪ Yield Strength (Gr. 60), Fy = 414 MPa
❖ Notes:
▪ Hoop Bars must be embedded at Beams.
▪ Steel Plate must be provided at each end of I-Beam at least 1 inch thick.
❖ No. of Hoop Bars on each end of I-Beam = 5 pcs (Min)
2. Hoop Bars must be welded
❖ Weld Properties
▪ Weld = E7018 (Full Weld)
▪ Minimum Length, L = 30 mm

3
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. SHORING SUPPORTS
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports per Beam = 10 pcs
3. Shoring Jack Spacing, S = 250 mm (Max)
4. Notes:
❖ No. of Supported Levels below the Collar = 3 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
 Schedule 40
 Size = 1.5”Φ (Min)
 Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
 No. of Bolts = 2 pcs (Min)
 Specs = A325
 Diameter, d = 5/8”Φ x 3.5”

D. NOTES & REMINDERS


1. Preparation of the Tower Crane and its Supports shall be in accordance to the Equipment Manual.
2. All materials should be in good condition.
3. Separate Design Calculation shall be made if:
❖ Supporting concrete beams have small sections;
❖ Clear span is more than specified allowable; and/or
❖ High Elevation shoring supports are required.
4. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.

4
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

II. DERRICK CRANE SUPPORT


A. PLATE
❖ Section Properties:
▪ 400 mm by 400 mm by 25 mm
▪ Yield Strength (Gr. 36), Fy = 248 MPa
❖ Notes:
▪ Plate is required at every base/leg of the Derrick Crane.

B. HOOP BARS
1. Bases/Legs must be fixed to the Slab/Beam using hoop/deformed bars.
❖ Section Properties:
▪ Bar Diameter, d = 28 mm
▪ Yield Strength (Gr. 60), Fy = 414 MPa
❖ Notes:
▪ Hoop Bars must be embedded at Beams.
❖ No. of Hoop Bars on each end of I-Beam = 5 pcs (Min)

2. Hoop Bars must be welded


❖ Weld Properties
▪ Weld = E7018 (Full Weld)
▪ Minimum Length, L = 30 mm

5
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
C. SHORING SUPPORT
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports per Base/Leg:
Level of Support 16T 8T 4T

1st Level 5 pcs 4 pcs 3 pcs

2nd Level 5 pcs 4 pcs 3 pcs

3rd Level 5 pcs 4 pcs 3 pcs

3. Shoring Jack Spacing, S = 250 mm (Max)


4. Notes:
❖ Each base of the Derrick Crane must be seated on a main beam/girder.
❖ No. of Supported Levels below the floor where Derrick Crane is seated = 3 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
 Schedule 40
 Size = 1.5”Φ (Min)
 Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
 No. of Bolts = 2 pcs (Min)
 Specs = A325
 Diameter, d = 5/8”Φ x 3.5

D. TIE-DOWN FOR PULL-OUT


❖ Section Properties:
▪ At least 5/8” Φ Wire Rope.
▪ Yield Strength (Gr. 36), Fy = 248 MPa
❖ Notes:
▪ Tie-Down is required at every base/leg of the Derrick Crane.
▪ Tie-Down must be drilled through slabs up to next floor below Derrick Crane’s leg.
▪ Tie-Down must be fully tightened.

6
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
E. NOTES & REMINDERS
1. Preparation of the Derrick Crane and its Supports shall be in accordance to the Equipment Manual.
2. All materials should be in good condition.
3. Separate Design Calculation shall be made if:
❖ Base/s is/are seated on a slab;
❖ Supporting concrete beams have small sections (intermediate beam);
❖ High Elevation shoring supports are required.
4. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.

7
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

III. PLACING BOOM SUPPORT


A. SHORING SUPPORTS
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports per Beam = 6 pcs
3. Shoring Jack Spacing, S = 450 mm (Max)
4. Notes:
❖ No. of Supported Levels below the Collar = 3 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
 Schedule 40
 Size = 1.5”Φ (Min)
 Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
 No. of Bolts = 2 pcs (Min)
 Specs = A325
 Diameter, d = 5/8”Φ x 3.5”

B. NOTES & REMINDERS


1. Preparation of the Placing Boom and its Supports shall be in accordance to the Equipment Manual.
2. All materials should be in good condition.
3. Any deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by CMSG
Formwork.

8
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

IV. PASSENGER HOIST SUPPORT


A. SHORING SUPPORTS
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Minimum No. of Shoring Supports under the Base of the Mast = 32 pcs
3. Shoring Jack Spacing, S = 700 mm (Max)
4. Notes:
❖ No. of Supported Levels = 2 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
 Schedule 40
 Size = 1.5”Φ (Min)
 Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
 No. of Bolts = 2 pcs (Min)
 Specs = A325
 Diameter, d = 5/8”Φ x 3.5”

B. NOTES & REMINDERS


1. Preparation of the Passenger Hoist and its Supports shall be in accordance to the Equipment Manual.
2. All materials should be in good condition.
3. Separate Design Calculation shall be made if:
❖ High Elevation shoring supports are required; or
❖ Shoring Posts are not allowed at 2 Floors below the base of the Hoist Mast.
4. Any deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by CMSG
Formwork.

9
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

V. STAGING AREA SUPPORT


A. SHORING SUPPORTS
1. Shoring Support / Shoring Jack Capacity, P = 10 T
2. Shoring Jack Spacing, S = 1.60 m (Max)
3. Notes:
❖ No. of Supported Levels = 2 Floors
❖ For Levels with High Elevations, provide Horizontal Bracings (G.I. Pipes).
▪ G.I. Pipe Properties
 Schedule 40
 Size = 1.5”Φ (Min)
 Connector: Swivel Clamps
❖ Connect two Shoring Jacks, end to end, using Bolts.
▪ Bolt Properties
 No. of Bolts = 2 pcs (Min)
 Specs = A325
 Diameter, d = 5/8”Φ x 3.5”

B. NOTES & REMINDERS


1. The Calculation of the Spacing of Shoring Supports is based on the Maximum Allowable Load the Staging Area
can carry – Rebars stacked at a maximum height of 300mm.
2. All materials should be in good condition.
3. Overloading must be avoided.
4. Any deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by CMSG
Formwork.

10
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

VI. MATERIAL LOADING PLATFORM


A. STANDARD LAYOUT

1. PLAN

2. Section

1750

11
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
3. Front Elevation

B. MATERIAL SPECIFICATIONS
1. Steel Members
❖ Yield Strength, Fy = 248 MPa (A36)
2. Shoring Posts
❖ Capacity, Pcap = 3.0 T (Min)
❖ No. Of Shoring Jacks per I-Beam = 6 pcs (Min)
❖ NOTE: Lower Level must also be supported by Shoring Jacks (at least 4 pcs per I-Beam.)
3. Hoop Bars / Embedded Rebar Anchor
❖ Yield Strength, Fy = 414 MPa (Gr. 60)
❖ Diameter, d = 28mm Φ (Min)
❖ No. Of Hoop Bars per I-Beam = 3 pcs (Min)
4. Connections
❖ All connections must be Full Weld (E7018).

C. NOTES & REMINDERS


1. The Platform is designed to carry a Maximum Load of 500 kg/m2.
2. Overloading must be avoided.
3. All materials should be in good condition.
4. Any deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by CMSG
Formwork.

12
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

VII. OVERHEAD SAFETY PROTECTION


A. CONCRETE PEDESTAL
1. Compressive Strength, f’c = 3,000 psi
2. Size:
❖ 600mm x 600mm x 600mm for Truss Spans < 20m
❖ 800mm x 800mm x 800mm for Truss Spans ≥ 20m

B. POST
1. Specification: Schedule 40

2. Size: 5” G.I. Pipe


POST CONFIGURATION FOR EVERY TRUSS LENGTH, L
L ≤ 15.0m 15.0m ≤ L < 20.0m 20.0m ≤ L < 22.0m

3. Maximum Allowable Height of Post, H = 5.70 m (from top of pedestal)


❖ Height of more than 5.70 m from top of pedestal must be subject to Checking/Analysis by COSG
Formwork.

4. Post to Pedestal Connection


❖ Plated and Bolted to the Pedestal
▪ 12mm thick MS Plate (500mm x 500mm)
▪ All Bolts shall be 16mm in diameter.

13
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

C. TRUSSES
1. Member Specifications
❖ Top Chord & Bottom Chord (G.I. Pipe)
▪ Specification: Schedule 40
▪ Size: 2”Φ G.I. Pipe
▪ Thickness: 2.8 mm
❖ Web (Deformed Bar)
▪ Yield Strength, Fy = Gr. 60
▪ Diameter, d = 12mm
❖ Knee Brace (G.I. Pipe) – for truss lengths more than 10m.
▪ Specification: Schedule 40
▪ Size: 2”Φ G.I. Pipe
▪ Thickness: 2.8 mm
❖ Connection
▪ All connection shall be Full Weld (E7018).

2. Truss Configuration

Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

8.0 m

14
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

10.0 m

TOP CHORD 2”Φ; SCHED 40 G.I. PIPE


BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

12.0 m

TOP CHORD 2”Φ; SCHED 40 G.I. PIPE


BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

15.0 m

15
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
Truss
Truss Configuration
Length
TOP CHORD 2”Φ; SCHED 40 G.I. PIPE
BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

18.0 m

TOP CHORD 2”Φ; SCHED 40 G.I. PIPE


BOTTOM CHORD 2”Φ; SCHED 40 G.I. PIPE
WEB BAR 12mm Φ; GRADE 60
KNEE BRACE 2”Φ; SCHED 40 G.I. PIPE

20.0 m

D. G.I. PIPE RUNNERS

1. Member Specifications
❖ Specification: Schedule 40
❖ Size: 1.5”Φ G.I. Pipe
❖ Thickness: 2.3 mm
2. Spacing
❖ Running Spacing ≤ 500 mm
3. Connection
❖ All Runner should be connected to the Trusses.

16
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
E. STANDARD LAYOUT
1. Bay Length = 5.00m
❖ Bay Length may be more than 5.00m if there are:
▪ Obstructions such as plants, posts, etc.
▪ Entries or Gates
 In such cases, the new design must subject to Checking/Analysis by COSG Formwork.
❖ The OSP layout should consist of independent frames assembled at every 5-meter bay as shown in
the figure

2. G.I. pipe runners of adjacent frames should be staggered with a clear distance of 5.0 mm – 10.0 mm

3. Concrete Pedestals of adjacent frames should have a clear spacing of 25.0 mm (Max)
17
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

F. NOTES & REMINDERS


1. All materials should be in good condition.
2. Separate Design Calculation shall be made if the following are required:
❖ Higher Vertical Clearance;
❖ Truss Length more than 20 m;
❖ Bay length more than 5.00 m; and/or
❖ Canopy Opening.
3. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.

18
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

Overhead Safety Protection Perspective

19
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

VIII. ACCESS AND SCAFFOLDING


8.A. PERIMETER/WORKING SCAFFOLDING
A. GENERAL NOTES
1. Height of Scaffolding, H = 25m (Max)
❖ Separate Design Calculation shall be provided if more than 25m scaffolding is required.
2. Member Specifications
❖ G.I. Pipes / H-Frames / A-Frames
❖ Specification: Schedule 40
❖ Size: 1.5”Φ G.I. Pipe
❖ Thickness, t = 2.3 mm (Min)
3. Maximum Braced Length, Lb = 1.80m
4. All Frame/Pipe Intersections must be connected by Swivel Clamps.
5. Working Platform
❖ Allowable No. of Working Platform = 3 Levels
❖ Allowable No. of Person per six (6) meter span of platform at a time = 2 persons

H-FRAME SET-UP

20
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

A-FRAME SET-UP

G.I. PIPE SET-UP


21
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
B. BASE JACK
❖ Specification: Schedule 40
❖ Length: 600mm – 800mm
❖ Maximum exposed length is half of the total length

C. FRAME
1. H-Frame (1.70 meter height x 1.20 meter width)
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe

2. A-Frame (1.70 meter height x 1.20 meter width)


❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe

22
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
3. Pipe
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe

D. ANCHORAGE/TIE-IN
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe
❖ Connector: Swivel Clamp
❖ One end connected at every leg with maximum vertical distance of 2 meters or per frame leg
whichever has lesser length. The other end should be connected at concrete column or shoring jack
set up.

E. CROSS BRACE
❖ Specification: Schedule 40
❖ Sizes of Members:
▪ 1” Φ Pipe for Frames
▪ 1.5” Φ Pipe for Scaffold Pipe

F. JOINT PIN (FOR FRAMES)


❖ Specification: Schedule 40
❖ Compatible to Frames (H-Frame/A-Frame) used

23
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
G. CONNECTION DETAILS
❖ Specification: Schedule 40
❖ Sizes of Members: 1.5”Φ Pipe

1. VERTICAL SPLICING

2. HORIZONTAL/DIAGONAL SPLICING

H. PLATFORM
❖ Catwalk with minimum thickness of 1.10 mm
❖ Width of 450 mm
❖ Maximum unsupported length 1.8 meters

24
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

VIII. ACCESS & SCAFFOLDING


8.B. SCAFFOLDING AT ELEVATOR SHAFT
A. GENERAL NOTES
1. Height of Scaffolding, H = 25m (Max)
2. Member Specifications
❖ G.I. Pipes / H-Frames / A-Frames
❖ Specification: Schedule 40
❖ Size: 1.5”Φ G.I. Pipe
❖ Thickness, t = 2.3 mm (Min)
3. Maximum Braced Length, Lb = 1.50m
4. All Frame/Pipe Intersections must be connected by Swivel Clamps.

H-FRAME SET-UP

25
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

A-FRAME SET-UP

26
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

G.I. PIPE SET-UP


27
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
B. WORKING PLATFORMS
1. Allowable No. of Working Platforms = 3 Levels
2. Allowable No. of Persons to use each Platform at a time = 2 persons

C. CONNECTION DETAILS
❖ Specification: Schedule 40
❖ Sizes of Members:1.5”Φ Pipe

3. VERTICAL SPLICING

4. HORIZONTAL/DIAGONAL SPLICING

28
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
D. SUPPORT AGAINST THE WALLS
1. Use Base Jacks to support the scaffold against the wall at every 1.5m (braced length).
2. Base jacks should be seated on stable, leveled and fixed position

E. NOTES & REMINDERS


1. All materials should be in good condition.
2. The base/foundation should be stable.
3. Tightness of bolts/screws/connections should always be checked.
4. Separate Design Calculation shall be made for the following circumstances:
❖ Scaffolding height of more than 25 m is required.
❖ Ground is unstable.
❖ More than 3 Levels of platforms are required.
5. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.

29
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

VIII. ACCESS & SCAFFOLDING


8.C. ACCESS LADDER
A. GENERAL NOTES
1. Height of Scaffolding, H = 25m (Max)
❖ Applicable for:
▪ One-Way Access Ladder
▪ Two-Way Access Ladder
❖ Separate Design Calculation shall be made if more than 25m of scaffolding is required.
2. Member Specifications
❖ G.I. Pipes / H-Frames / A-Frames
❖ Specification: Schedule 40
❖ Size: 1.5”Φ G.I. Pipe
❖ Thickness, t = 2.3 mm (Min)
3. Maximum Braced Length, Lb = 1.80m
4. All Frame/Pipe Intersections must be connected by Swivel Clamps.

PLAN VIEW (G.I. PIPE SET-UP)

ELEVATION VIEW (G.I. PIPE SET-UP)


30
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT

PLAN VIEW (H-FRAME/A-FRAME PIPE SET-UP)

ELEVATION VIEW (H-FRAME SET-UP)

ELEVATION VIEW (A-FRAME SET-UP)


31
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
B. CONNECTION DETAILS
1. VERTICAL SPLICING

2. HORIZONTAL/DIAGONAL SPLICING

C. ANCHORAGE/TIE-IN
1. Rebar Specifications for Anchorage to Soil:
❖ Soil Bearing Capacity: 200 KPa and above
❖ Diameter, d = 36 mm
❖ Embedment Length, L = 820 mm (Min)
❖ Number of connection to soil/earth at every 2 frames: 4 anchors to soil/earth

32
BOOK OF STANDARDS CMSG Innovative Technology Division
Design of Temporary Structures FORMWORK DEPARTMENT
2. G.I. Pipe Specifications for Tie-in to Existing Structures
❖ Size: 1.5”ΦG.I. Pipe
❖ Thickness, t = 2.3 mm (Min)
❖ Connector: Swivel Clamp

D. CONCRETE PAD
1. Concrete Specification:
❖ Strength, f’c = 3000 psi
❖ Dimensions (Min)
▪ L =300 mm , W= 300 mm, D = 100 mm

* Concrete pads are required for scaffolding with height of 10 m and above for access rest on soil.

E. NOTES & REMINDERS


1. All materials should be in good condition.
2. The base/foundation should be stable.
3. Tightness of bolts/screws/connections should always be checked.
4. Separate Design Calculation shall be made for the following circumstances:
❖ Scaffolding height of more than 25 m is required.
❖ Soil is unstable.
5. Any other deviation from the Minimum Design Requirement shall be subjected to Design Check/Analysis by
CMSG Formwork.