PROJECT : 1-STOREY RESIDENTIAL BUILDING

OWNER : MR. & MRS. XXX

Item Description Unit Qty Materials Labor Equipment Total Direct Cost Contingency Mark-Up Unit Rate Amount

DIVISION 01 - GENERAL REQUIREMENTS


Mobilization lot 1.00 -
Demobilization lot 1.00 -
Supervision lot 1.00 -
Site Accomodation & Temporary Facilities lot 1.00 -
Safety Requirements lot 1.00 -

DIVISION 02 - SITE CONSTRUCTION


02200 SITE PREPARATION

Backfilling and compaction of imported materials


to slabs m3 -

DIVISION 03 - CONCRETE
03100 CONCRETE FORMS & ACCESSORIES
Generally
to Footings m2 -
to Footing Tie Beams m2 -
to Columns m2 -
to Beams m2 -

03200 CONCRETE REINFORCEMENT


Generally
to Footings kg -
to Footing Tie Beams kg -
to Columns kg -
to Beams kg -
to Slabs kg -

03300 CAST-IN-PLACE CONCRETE


Generally (10% labor cost) (10% DC) (10% DC)
to Footings m3 3.60 4,470.00 255.00 25.50 4,751.00 475.10 475.10 5,702.00 20,527.20
to Footing Tie Beams m3 3.82 4,470.00 255.00 25.50 4,751.00 475.10 475.10 5,702.00 21,781.64
to Columns m3 3.38 4,470.00 255.00 25.50 4,751.00 475.10 475.10 5,702.00 19,272.76
to Beams m3 2.54 4,470.00 255.00 25.50 4,751.00 475.10 475.10 5,702.00 14,483.08
to Slabs m3 11.82 4,470.00 255.00 25.50 4,751.00 475.10 475.10 5,702.00 67,397.64

03500 CEMENTITIOUS DECKS & UNDERLAMENT

Concrete Topping
This work includes supply and installation of concrete topping
and other necessary accessories to complete the works; to receive tiles
To floors and walls m2 -

DIVISION 04 - MASONRY
04050 BASIC MASONRY MATERIALS & METHODS

Interior Wall Type


This work includes chb, sealants, rebars,
hauling, delivery, labor and other necessary
accessories to complete the work
CHB Wall 4" thick m2 -

Exterior Wall Type


This work includes chb, sealants, rebars,
hauling, delivery, labor and other necessary
accessories to complete the work
CHB Wall 6" thick m2 -

DIVISION 06- ARCHITECTURAL WOOD


06400 ARCHITECTURAL WOODWORK

Cabinets
This work includes supply and installation of baffle walls
painting and other necessary accessories to complete the works

Kitchen Cabinets
Kitchen Cabinets (3150mm L x 600mm W x 1000mm H) nr -
Kitchen Cabinets (3500mm L x 600mm W x 1000mm H) nr -

Bill of Quantities Page 1 of 2


PROJECT : 1-STOREY RESIDENTIAL BUILDING
OWNER : MR. & MRS. XXX

Item Description Unit Qty Materials Labor Equipment Total Direct Cost Contingency Mark-Up Unit Rate Amount

DIVISION 07 - THERMAL & MOISTURE PROTECTION


07400 ROOFING & SIDING PANELS

Supply and installation of Rib Type Long Span GI Sheet,


framings & Stainless Gutter and other necessary accessories
to complete the works m2 -

DIVISION 08 - DOORS & WINDOWS


Doors
This work includes supply and installation of doors, painting and
other necessary accessories to complete the works
Tanguile Wood Panel Swing Door; 900mm W x
2100mm H nr -

Marine Plywood Flush Door; 700mm W x 2100mm H nr -

uPVC Flush Door; 600mm W x 2100mm H; Type D3 nr -

Allowance for Ironmongery


This work includes supply and installationof door hardwares
and other necessary accessories to complete th works nr -

Windows
This work includes supply and installationof windows
and other necessary accessories to complete th works
Aluminum Sliding window w/ awning transom in
analok finish; 1200mm W x 800mm H nr -
Aluminum glass window in analok finish; 400mm W x
2100mm H nr -

DIVISION 09 - FINISHES
09200 PLASTER & GYPSUM BOARD
Plastering Works
Plaster; internal; mixture and thickness as specified;
to receive paint
To walls m2 -

Ceiling Boards
This work includes supply and installation of 3.5 mm Fiber cement
board painted finish and all necessary accessories to complete the works
To ceilings m2 -

This work includes supply and installation of 9 mm thick Gypsum Board


board painted finish and all necessary accessories to complete the works
To ceilings m2 -

Allowance for Access Manhole


600mm x 600mm nr -

09300 TILE

Homogeneous Tiles
This work includes supply and installation of non-slip 40 cm x 40 cm
homogenous tiles (Mariwasa) and other necessary accessories to
complete the works
To floors m2 -

This work includes supply and installation of non-slip 20 cm x 20 cm


homogenous tiles (Mariwasa) and other necessary accessories to
complete the works
To floors m2 -
To walls; full height m2 -

09900 PAINTS & COATINGS

Supply and Application of Painting and other necessary accessories


to complete the works
to Interior Wall m2 -
to Exterior Wall m2 -

DIVISION 10 - SPECIALTIES
15400 PLUMBING FIXTURE
Water Closet nr -
Faucet nr -
Stainless sink nr -
Drain nr -

DIVISION 22 - PLUMBING & SANITARY


22100 PLUMBING PIPING

DIVISION 23 - HEATING, VENTILATIONG AND AIR CONDITIONING (HVAC)


Allowance for Ventilation
to Toilets & Kitchen lot 1.00 -

DIVISION 26 - ELECTRICAL

TOTAL AMOUNT 143,462.32

Bill of Quantities Page 2 of 2