2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 19.000.000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 - 50.000 -
2 Kantor M2 - 75.000 -
3 Barak M2 - 45.000 -
4 Bengkel M2 - 25.000 -
5 Gudang, dan lain-lain M2 - 25.000 -
6 ...................... .... - - -
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 - 250.000 -
3 Bituminous Testing
Marshall Asphalt Test Set - 100.000 -
Extraction Test, Centrifuge/Refflux Method Set - 100.000 -
Specific Gravity for Coarse Aggregate Set - 100.000 -
Specific Gravity for Fine Aggregate Set - 100.000 -
Mix Air Viod Content (Accurate Method) Set - 100.000 -
Core Drill Set - 100.000 -
Metal Thermometer Set - 100.000 -
Accessories and Tolls Set - 100.000 -
Penetration Test Bln - - -
Softening Point Set - - -
Refusal Density Compactor Set - - -
4 Concrete Testing
Slump Cone Set - - -
Cylinder/Cube Mould for Compressive Strength Set - - -
Beam Mould for Flexural Strength (RIGID) Set - - -
Crushing Machine Set - - -
E. MOBILISASI LAINNYA
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN