You are on page 1of 1

SAMPLE TEST REQUIRED ITEM RATE AMOUNT

Preparation 12 300.00 3,600.00


PI 12 800.00 9,600.00
Wet and dry sieving 12 900.00 10,800.00
T180/T999 12 1,000.00 12,000.00
SOIL Static CBR/Dynamic (3point) CBR 12 1,500.00 18,000.00
Preparation 10 1,000.00 10,000.00
Grading 10 2,000.00 20,000.00
Clay, silt, dust content 10 1,000.00 10,000.00
ACV 10 1,500.00 15,000.00
LAA 10 1,500.00 15,000.00
Blending -
SSS -
Flakiness Index 10 900.00 9,000.00
Water absorption 10 200.00 2,000.00
AGGREGATE Stabilization GCS -
Mix design -
Premix Marshall Test 8 4,500.00 36,000.00
ASPHALT Bitumen extraction 8 2,500.00 20,000.00
CONCRETE Grading Dry mix -
Sand replacement -
CBR Mould Neat -
Cube casting -
Slump determination -
Cube crushing -
Shoe cutter sampling -
Steel bar testing/Transportation -

FIELD WORK Non destructive concrete (schmidt hammer) -


Facing -
Dimensions -
CONCRETE Compressive strength 16 2,500.00 40,000.00
BLOCK Density
STAFF
ALLOWANCE 25,000.00
256,000.00