A. UPAH
1 Pekerja Org/hari L. 01 120,000.00
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pancang Org/hari L. 02 160,000.00
3 Kepala Tukang Org/hari L. 03 180,000.00
4 Mandor Org/hari L. 04 200,000.00
5 Ahli alat berat (mekanik) Org/hari L. 07 220,000.00
6 Operator Alat Berat Org/hari L. 08 170,000.00
7 Pembantu Operator Org/hari L. 09 150,000.00
8 Supir Truk Org/hari L. 10 150,000.00
9 Kenek truk Org/hari L. 11 100,000.00
B. BAHAN PENGISI
1 Batu Kong M³ 275,000.00
2 Batu Sap Pinang M³ 320,000.00
3 Batu pecah 15-20 cm M³ 335,000.00
4 Batu pecah 10-15 cm M³ 350,000.00
5 Batu pecah 3-5 cm M³ 264.00
6 Batu pecah 2-3 cm M³ 435,000.00
7 Batu pecah 1-2 cm M³ 561,035.00
8 Batu pecah 0,5-1 cm M³ 500,000.00
9 Stone Dust M³ 350,000.00
10 Aspal Kg 13,500.00
11 Aspal Emulsi (Teak Coat) Kg 13,500.00
12 Aspal Emulsi (Prime Coat) Kg 13,500.00
13 Aspal Sealent Kg 35,000.00
14 Pasir Kasar M³ 223,962.00
15 Pasir Halus M³ 120,000.00
16 Semen PC Zak 75,000.00
17 Semen PC Kg 2,100.00
18 Tanah Ex. Peniraman M³ 300,000.00
19 Tanah Pilihan (Paladis/Tanah Bukit Tokok) M³ 350,000.00
20 Paving Block Bh 3,750.00
21 Paving Stone Bh 4,000.00
22 Batu Bata 5 x 11 x 22cm Bh 2,000.00
23 Bataco 15 x 30 x 7 cm Bh 1,800.00
24 Bataco 20 x 40 x 9 cm ( press ) Bh 2,500.00
25 Bataco 20 x 40 x 7 cm ( press ) Bh 2,300.00
26 Kerawang ( roster ) 18 x 18 cm Bh 20,000.00
27 Kerawang press ( roster ) 30 x 30 cm Bh 60,500.00
28 Keramik 20 x 20 cm Polished ex Roman Kotak 81,600.00
29 Keramik 20 x 20 cm Unpolished ex Roman Kotak 98,000.00
30 Keramik 30 x 30 cm Polished ex Roman Kotak 95,000.00
31 Keramik 30 x 30 cm Unpolished ex Roman Kotak 95,000.00
32 Keramik 40 x 40 cm Polished ex Roman Kotak 100,000.00
33 Keramik 40 x 40 cm Unpolished ex Roman Kotak 111,000.00
34 Keramik 30 x 60 cm Polished (setaraf Indogress) Kotak 243,000.00
35 Keramik 30 x 60 cm Unpolished (setaraf Indogress) Kotak 243,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ 11,805,000.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ 11,700,000.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ 8,950,000.00
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³ 8,750,000.00
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ 9,567,900.00
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ 10,000,000.00
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ 13,020,900.00
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ 10,416,700.00
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³ 11,500,000.00
10 Ky. Belian ketam Uk. 6/6 - 4 M M³ 12,800,000.00
11 Ky. Belian ketam Uk. 7/7 - 4 M M³ 12,500,000.00
12 Ky. Belian ketam Uk. 8/8 - 4 M M³ 11,015,700.00
13 Ky. Belian ketam Uk. 5/10 - 4 M M³ 11,000,000.00
14 Ky. Belian ketam Uk. 4/8 - 4 M M³ 11,718,750.00
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ 7,421,875.00
16 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ 7,500,000.00
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ 7,800,000.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ 7,840,000.00
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) M³ 9,050,000.00
20 Kusen Ky Belian uk. 5/10 Meter 120,000.00
21 Kusen Ky Kelas I Bangkirai uk. 5/10 Meter 80,000.00
22 Kusen Ky Kelas II uk. 5/10 Meter 65,000.00
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ 4,440,000.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ 4,716,717.69
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ 5,070,000.00
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ 4,755,000.00
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ 3,355,000.00
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ 3,576,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
D. BAHAN CAT
1 Amplas Lbr 3,500.00
2 Minyak cat Kg 36,000.00
3 Cat kilat setara Dulux Kg 70,000.00
4 Cat kilat setara Avian Kg 70,000.00
5 Plamur Kg 31,500.00
6 Cat Dasar Alkali Kg 140,000.00
7 Cat Akhir Interior setara Dulux Kg 104,000.00
8 Cat Akhir Eksterior (weather shield) setara Dulux Kg 107,000.00
9 Cat Dasar setara Mowilex Kg 70,000.00
10 Cat Akhir Interior setara Mowilex Kg 84,000.00
11 Cat Akhir Eksterior (weather shield) setara Mowilex Kg 104,000.00
12 Cat Dasar setara Vinilex Kg 27,000.00
13 Cat Akhir Interior setara Vinilex Kg 28,000.00
14 Cat seng (Zinc Chromate) Kg 44,000.00
15 Plitur Kg 64,000.00
16 Thiner Ltr 25,000.00
17 Melamic Ltr 67,000.00
18 Vernis Ltr 45,000.00
19 Meni Kg 52,000.00
20 Oker / Semen Warna Kg 14,000.00
21 Lem Kayu Kg 18,500.00
22 Sealent Kg 35,900.00
23 Soda Api Kg 24,500.00
24 Sabun / cream pembersih kotoran Kg 15,700.00
25 Teak Oil Ltr 60,000.00
26 Ter / Residu Ltr 58,400.00
27 Kuas 4" Bh 24,000.00
28 Cat Marka (non Thermoplas) Kg 65,000.00
29 Cat Marka (Thermoplastic) Kg 95,000.00
30 Cat Kansteen (ex. Matex) Kg 53,750.00
31 Cat Trotoar (ex. Tenokote) Kg 41,250.00
32 Glass Bead Kg 30,000.00
33 Weatherbond Emulsion ( cat kerb ) Kg 39,000.00
34 Cat Water Proofing Kg 78,500.00
F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC Bh 266,000.00
2 Kait angin Bh 14,400.00
3 Handle Jendela Bh 15,400.00
4 Handle Pintu Bh 135,000.00
5 Engsel jendela Bh 18,800.00
6 Engsel pintu Bh 29,000.00
7 Slot pintu Bh 18,900.00
8 Slot jendela Bh 8,800.00
9 Kunci tanam 2 slag (setaraf Belluci) Bh 179,100.00
10 Kunci tanam 1 slag Bh 162,500.00
11 Kunci tanam antik Bh 47,500.00
12 Kunci tanam biasa Bh 57,500.00
13 Kunci silinder Bh 78,800.00
14 Door Closer Bh 190,000.00
15 Door Stoper Bh 88,750.00
16 Paku Seng Kg 20,900.00
17 Paku campuran 1" - 5 " Kg 20,500.00
18 Paku beton Kg 31,400.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
G. BAHAN ATAP
1 Sirap belian Lbr 5,300.00
2 Asbes Lbr 57,200.00
3 Eternit M² 68,400.00
4 Genteng Metal Type Permata 0.30 Lbr 63,000.00
5 Genteng Metal Type Prima 0.30 Lbr 66,600.00
6 Genteng Metal Type Royal 0.30 Lbr 66,600.00
7 Genteng Metal Type Classic 0.30 Lbr 66,600.00
8 Genteng Metal Type Permata 0.25 Lbr 51,800.00
9 Genteng Metal Type Classic 0.25 Lbr 51,800.00
10 Genteng Metal Type Royal 0.25 Lbr 51,800.00
11 Atap Genteng Onduline Transparan 2 x 0,95 m Lbr 275,000.00
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam) Lbr 173,000.00
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium) Lbr 200,000.00
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam) Lbr 59,000.00
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino) Lbr 54,000.00
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam) Lbr 100,000.00
17 Perabung Onduline Warna 90 x 50 cm (biru/premium) Lbr 110,000.00
18 Perabung Onduline Warna 90 x 50 cm (florentino) Lbr 110,000.00
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam) Lbr 93,000.00
20 Apron Piece Onduvilla 102 x 14 cm Lbr 89,500.00
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm Lbr 89,500.00
22 Onduband M 57,000.00
23 Atap Seng Metal Soka Abadi Lbr 92,000.00
24 Atap Seng Metal Soka Jempol Lbr 65,000.00
25 Atap Seng Metal Soka Tiara Lbr 59,000.00
26 Genteng Metal Stone ( Type Classic 0.35 ) Lbr 80,000.00
27 Genteng Metal Stone ( Type Prima 0.35 ) Lbr 80,000.00
28 Atap Metal Supersheet 0.35 (polos) M² 81,300.00
29 Atap Metal Supersheet 0.35 (colour) M² 111,900.00
30 Atap Metal Supersheet 0.25 (polos) M² 47,000.00
31 Atap Metal Supersheet 0.25 (colour) M² 64,000.00
32 Atap Trim Deck 0.3 (polos) M² 100,000.00
33 Atap Trim Deck 0.35 (color) M² 112,300.00
34 Atap polycarbonat M² 78,300.00
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh 46,000.00
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh 75,000.00
37 Nok bubungan genteng metal kotak 0.35 M' 50,000.00
38 Nok bubungan genteng metal stone kotak 0.35 M' 96,900.00
39 Nok bubungan Trim Deck (polos) M' 109,500.00
40 Nok bubungan Trim Deck (color) M' 123,100.00
41 Seng Gelombang Bjls 30 Lbr 72,000.00
42 Seng Gelombang Bjls 20 Lbr 47,400.00
43 Seng Plat Bjls 20 Lbr 55,000.00
44 Seng Plat Bjls 30 Lbr 68,000.00
45 Seng Plat Bjls 30 (lebar 45 cm) M' 20,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
H. BAHAN KACA
1 Kaca Polos, t = 3 mm M² 150,000.00
2 Kaca Polos, t = 5 mm M² 200,000.00
3 Kaca Polos, t = 8 mm M² 398,000.00
4 Kaca Polos, t = 12 mm M² 640,000.00
5 Kaca Rayben, t = 3 mm M² 200,000.00
6 Kaca Rayben, t = 5 mm M² 200,000.00
7 Kaca Rayben, t = 8 mm M² 550,000.00
8 Kaca Rayben, t = 12 mm M² 900,000.00
9 Kaca Cermin t = 3 mm M² 275,000.00
10 Kaca Cermin t = 5 mm M² 418,000.00
11 Kaca Repsol, t = 5 mm M² 550,000.00
12 Sealent Kg 35,000.00
13 Nako + Bingkai (80 x 15) x 10 daun polos Bh 400,000.00
14 Nako + Bingkai (80 x 15) x 10 daun rayben Bh 469,000.00
15 Kaca Es, t = 3 mm M² 275,000.00
16 Kaca Es, t = 5 mm M² 267,500.00
17 Kaca Raindown, t = 5 mm M² 550,000.00
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr 70,000.00
5 Teakwood t = 3 mm Lbr 140,000.00
6 Formika t = 0,03 mm Lbr 115,000.00
7 Multiplex t = 6 mm Lbr 111,000.00
8 Multiplex t = 9 mm Lbr 220,000.00
9 Multiplex t = 10 mm Lbr 278,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
J. BAHAN SANITASI
1 Wastafel setara Toto Bh 1,000,000.00
2 Kloset duduk monoblok Bh 2,962,700.00
3 Kloset duduk putih (setaraf TOTO) Bh 2,246,800.00
4 Kloset duduk warna (setaraf TOTO) Bh 2,500,000.00
5 Kloset jongkok (setaraf TOTO) Bh 330,000.00
6 Kloset jongkok (setaraf INA) Bh 191,000.00
7 Urinoir setaraf Toto Unit 2,000,000.00
8 Bak air fibreglass uk. 55x55x60 cm Bh 280,000.00
9 Shower Spray setara Toto Unit 230,000.00
10 Sliding rail setara Toto Unit 500,000.00
11 Floordrain stainless steel setara Toto Bh 319,100.00
12 Floordrain PVC Bh 18,500.00
13 Tempat Sabun Setara Toto Bh 65,200.00
14 Kran zink setara Toto Bh 307,000.00
15 Kitchenzink stainless steel 1 lubang Unit 650,000.00
16 Kran dinding setara Toto Bh 150,000.00
17 Kran air uk 1/2" Bh 32,500.00
25 Pipa PVC dia 1/2" AW ex Wavin Btg 1,115,000.00
26 Pipa PVC dia 3/4" AW ex Wavin Btg 22,000.00
27 Pipa PVC dia 1" AW ex Wavin Btg 30,000.00
28 Pipa PVC dia 2" AW ex Wavin Btg 45,000.00
29 Pipa PVC dia 3" AW ex Wavin Btg 82,000.00
30 Pipa PVC dia 4" AW ex Wavin Btg 164,000.00
Pipa PVC dia 8" AW ex Wavin Btg 254,000.00
31 Pipa PVC dia 3/4" D ex Wavin Btg 23,500.00
32 Pipa PVC dia 1" D ex Wavin Btg 30,000.00
33 Pipa PVC dia 2" D ex Wavin Btg 48,000.00
34 Pipa PVC dia 3" D ex Wavin Btg 86,000.00
35 Pipa PVC dia 4" D ex Wavin Btg 130,000.00
36 Stop kran dia 1/2" ex onda Bh 43,000.00
37 Stop kran dia 3/4" ex onda Bh 51,200.00
38 Stop kran dia 1" ex onda Bh 115,500.00
39 Tangki air 1000 liter Bh 2,500,000.00
40 Tangki air 500 liter Bh 2,000,000.00
41 Pelampung otomatis Bh 75,000.00
42 Roof Drain Metal Bh 75,000.00
43 Septicktank Biosel kap. 6,00 m3 Unit 115,000.00
44 Mesin Jet Pump kap.250 watt Unit 1,440,000.00
45 Mesin Pompa tekan kap. 150 watt Unit 550,000.00
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm M² 180,000.00
2 Batu Andesit Ukuran 15 x 30 cm M² 210,000.00
3 Batu Andesit Ukuran 20 x 40 cm M² 230,000.00
4 Batu Andesit Ukuran 30 x 60 cm M² 260,000.00
5 Batu Candi Ukuran 10 x 20 cm M² 180,000.00
6 Batu Candi Ukuran 15 x 30 cm M² 210,000.00
7 Batu Candi Ukuran 20 x 40 cm M² 230,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.02 OH 0.400 160,000.00 64,000.00
Kepala Tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.020 200,000.00 4,000.00
JUMLAH TENAGA KERJA 95,600.00
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250 12,000.00 15,000.00
Semen Portland Kg 2.500 -
Seng gelombang Lbr 1.200 47,400.00 56,880.00
Pasir Beton m3 0.005 -
Koral Beton m3 0.009 -
Kayu 5/7 m3 0.072 4,755,000.00 342,360.00
Paku Biasa 2"-5" Kg 0.060 20,500.00 1,230.00
Mini besi Liter 0.450 52,000.00 23,400.00
JUMLAH HARGA BAHAN 438,870.00
C PERALATAN
A.2.2.1.3 (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.02 OH 0.300 160,000.00 48,000.00
Kepala Tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.020 200,000.00 4,000.00
JUMLAH TENAGA KERJA 79,600.00
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.000 12,000.00 12,000.00
Semen Portland Kg 2.000 2,100.00 4,200.00
Kawat duri m 25.000 4,000.00 100,000.00
Pasir Beton m3 0.005 2,100.00 10.50
Koral Beton m3 0.009 120,000.00 1,080.00
Paku Biasa 2"-5" Kg 0.060 20,500.00 1,230.00
JUMLAH HARGA BAHAN 118,520.50
C PERALATAN
A.3.2.1.6 Pemasangan 1m3 pondasi batu belah campuran 1SP : 1KP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang batu L.02 OH 0.750 160,000.00 120,000.00
Kepala tukang L.03 OH 0.075 180,000.00 13,500.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 328,500.00
B BAHAN
Batu belah m3 1.200 335,000.00 402,000.00
Kapur m3 0.170 -
Semen portland Kg 0.170 2,100.00 357.00
Pasir pasang m3 0.340 223,962.00 76,147.08
JUMLAH HARGA BAHAN 478,504.08
C PERALATAN
A.3.2.1.8 Pemasangan 1m3 pondasi batu belah campuran 1/4SP : 1KP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.500 120,000.00 180,000.00
Tukang batu L.02 OH 0.750 160,000.00 120,000.00
Kepala tukang L.03 OH 0.075 180,000.00 13,500.00
Mandor L.04 OH 0.075 200,000.00 15,000.00
JUMLAH TENAGA KERJA 328,500.00
B BAHAN
Batu belah m3 1.200 335,000.00 402,000.00
Semen portland Kg 41.000 2,100.00 86,100.00
Kapur m3 0.131 -
Pasir pasang m3 0.523 223,962.00 117,132.13
JUMLAH HARGA BAHAN 605,232.13
C PERALATAN
A.3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1 SP : 2PB : 3 Kr dan 40% batu belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 3.400 120,000.00 408,000.00
Tukang batu L.02 OH 0.850 160,000.00 136,000.00
Kepala tukang L.03 OH 0.085 180,000.00 15,300.00
Mandor L.04 OH 0.170 200,000.00 34,000.00
JUMLAH TENAGA KERJA 593,300.00
B BAHAN
Batu belah (10-15 cm) m3 0.480 350,000.00 168,000.00
Semen Portland Kg 194.000 2,100.00 407,400.00
Pasir beton m3 0.312 223,962.00 69,876.14
Kerikil (1-2 cm) m3 0.468 561,035.00 262,564.38
Besi beton Kg 126.000 12,000.00 1,512,000.00
Kawat beton Kg 1.800 23,000.00 41,400.00
JUMLAH HARGA BAHAN 2,461,240.52
C PERALATAN
A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 247.000 2,100.00 518,700.00
Pasir beton Kg 869.000 159.97 139,016.41
Kerikil (maks 30 mm) Kg 999.000 415.58 415,165.90
Air Liter 215.000
JUMLAH HARGA BAHAN 1,072,882.31
C PERALATAN
A.4.1.1.1.a Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 247.000 2,100.00 518,700.00
Pasir beton Kg 869.000 159.97 139,016.41
Kerikil (maks 30 mm) Kg 999.000 415.58 415,165.90
Air Liter 215.000
JUMLAH HARGA BAHAN 1,072,882.31
C PERALATAN
A.4.1.1.2 Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 276.000 2100.00 579,600.00
Pasir beton Kg 828.000 159.97 132,457.53
Kerikil (maks 30 mm) Kg 1012.000 415.58 420,568.46
Air Liter 215.000
JUMLAH HARGA BAHAN 1,132,625.98
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C) 1,396,265.98
E Overhead & Provit 15% x D 209,439.90
F Harga Satuan Pekerjaan ( D + E ) 1,605,705.88
A.4.1.1.2.a Membuat 1m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm ,w/c =0,78 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 276.000 2100.00 579,600.00
Pasir beton Kg 828.000 159.97 132,457.53
Kerikil (maks 30 mm) Kg 1012.000 415.58 420,568.46
Air Liter 215.000
JUMLAH HARGA BAHAN 1,132,625.98
C PERALATAN
A.4.1.1.3 Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 299.000 2,100.00 627,900.00
Pasir beton Kg 799.000 159.97 127,818.31
Kerikil (maks 30 mm) Kg 1017.000 415.58 422,646.37
Air Liter 215.000
JUMLAH HARGA BAHAN 1,178,364.68
C PERALATAN
A.4.1.1.3.a Membuat 1m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm ,w/c =0,72 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 299.000 2,100.00 627,900.00
Pasir beton Kg 799.000 159.97 127,818.31
Kerikil (maks 30 mm) Kg 1017.000 415.58 422,646.37
Air Liter 215.000
JUMLAH HARGA BAHAN 1,178,364.68
C PERALATAN
A.4.1.1.4 Membuat 1m3 lantai kerja beton mutu f'c = 7,4 MPa slump (3-6) cm, w/c =0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.200 120,000.00 144,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.060 200,000.00 12,000.00
JUMLAH TENAGA KERJA 191,600.00
B BAHAN
Semen Portland Kg 230.000 2,100.00 483,000.00
Pasir beton Kg 893.000 159.97 142,855.76
Kerikil (maks 30 mm) Kg 1027.000 415.58 426,802.18
Air Liter 200.000
JUMLAH HARGA BAHAN 1,052,657.94
C PERALATAN
A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 326.000 2,100.00 684,600.00
Pasir beton Kg 760.000 159.97 121,579.37
Kerikil (maks 30 mm) Kg 1029.000 415.58 427,633.34
Air Liter 215.000
JUMLAH HARGA BAHAN 1,233,812.72
C PERALATAN
A.4.1.1.5.a Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 326.000 2,100.00 684,600.00
Pasir beton Kg 760.000 159.97 121,579.37
Kerikil (maks 30 mm) Kg 1029.000 415.58 427,633.34
Air Liter 215.000
JUMLAH HARGA BAHAN 1,233,812.72
C PERALATAN
A.4.1.1.6 Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 352.000 2,100.00 739,200.00
Pasir beton Kg 731.000 159.97 116,940.16
Kerikil (maks 30 mm) Kg 1031.000 415.58 428,464.51
Air Liter 215.000
JUMLAH HARGA BAHAN 1,284,604.67
C PERALATAN
A.4.1.1.6.a Membuat 1m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm ,w/c = 0,61 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 352.000 2,100.00 739,200.00
Pasir beton Kg 731.000 159.97 116,940.16
Kerikil (maks 30 mm) Kg 1031.000 415.58 428,464.51
Air Liter 215.000
JUMLAH HARGA BAHAN 1,284,604.67
C PERALATAN
A.4.1.1.7.a Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 371.000 2,100.00 779,100.00
Pasir beton Kg 698.000 159.97 111,661.05
Kerikil (maks 30 mm) Kg 1047.000 415.58 435,113.81
Air Liter 215.000
JUMLAH HARGA BAHAN 1,325,874.87
C PERALATAN
A.4.1.1.8 Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 384.000 2,100.00 806,400.00
Pasir beton Kg 692.000 159.97 110,701.22
Kerikil (maks 30 mm) Kg 1039.000 415.58 431,789.16
Air Liter 215.000
JUMLAH HARGA BAHAN 1,348,890.38
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C) 1,612,530.38
E Overhead & Provit 15% x D 241,879.56
F Harga Satuan Pekerjaan ( D + E ) 1,854,409.93
A.4.1.1.8.a Membuat 1m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm ,w/c = 0,56 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 384.000 2,100.00 806,400.00
Pasir beton Kg 692.000 159.97 110,701.22
Kerikil (maks 30 mm) Kg 1039.000 415.58 431,789.16
Air Liter 215.000
JUMLAH HARGA BAHAN 1,348,890.38
C PERALATAN
A.4.1.1.9 Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 406.000 2,100.00 852,600.00
Pasir beton Kg 684.000 159.97 109,421.43
Kerikil (maks 30 mm) Kg 1026.000 415.58 426,386.60
Air Liter 215.000 -
JUMLAH HARGA BAHAN 1,388,408.03
C PERALATAN
A.4.1.1.9.a Membuat 1m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm ,w/c = 0,53 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 406.000 2,100.00 852,600.00
Pasir beton Kg 684.000 159.97 109,421.43
Kerikil (maks 30 mm) Kg 1026.000 415.58 426,386.60
Air Liter 215.000 -
JUMLAH HARGA BAHAN 1,388,408.03
C PERALATAN
A.4.1.1.10 Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang batu L.02 OH 0.275 160,000.00 44,000.00
Kepala tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 200,000.00 16,600.00
JUMLAH TENAGA KERJA 263,640.00
B BAHAN
Semen Portland Kg 413.000 2,100.00 867,300.00
Pasir beton Kg 681.000 159.97 108,941.52
Kerikil (maks 30 mm) Kg 1021.000 415.58 424,308.69
Air Liter 215.000
JUMLAH HARGA BAHAN 1,400,550.21
C PERALATAN
A.4.1.1.10.a Membuat 1m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm ,w/c = 0,52 (menggunakan molen)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang batu L.02 OH 0.189 160,000.00 30,240.00
Kepala tukang L.03 OH 0.019 180,000.00 3,420.00
Mandor L.04 OH 0.066 200,000.00 13,200.00
JUMLAH TENAGA KERJA 205,620.00
B BAHAN
Semen Portland Kg 413.000 2,100.00 867,300.00
Pasir beton Kg 681.000 159.97 108,941.52
Kerikil (maks 30 mm) Kg 1021.000 415.58 424,308.69
Air Liter 215.000
JUMLAH HARGA BAHAN 1,400,550.21
C PERALATAN
A.4.1.1.11 Membuat 1m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm ,w/c = 0,49
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.100 120,000.00 252,000.00
Tukang batu L.02 OH 0.350 160,000.00 56,000.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.105 200,000.00 21,000.00
JUMLAH TENAGA KERJA 335,300.00
B BAHAN
Semen Portland Kg 439.000 2,100.00 921,900.00
Pasir beton Kg 670.000 159.97 107,181.81
Kerikil (maks 30 mm) Kg 1006.000 415.58 418,074.97
Air Liter 215.000
JUMLAH HARGA BAHAN 1,447,156.78
C PERALATAN
A.4.1.1.12 Membuat 1m3 beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm ,w/c = 0,48
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.100 120,000.00 252,000.00
Tukang batu L.02 OH 0.350 160,000.00 56,000.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.105 200,000.00 21,000.00
JUMLAH TENAGA KERJA 335,300.00
B BAHAN
Semen Portland Kg 448.000 2,100.00 940,800.00
Pasir beton Kg 667.000 159.97 106,701.90
Kerikil (maks 30 mm) Kg 1000.000 415.58 415,581.48
Air Liter 215.000
JUMLAH HARGA BAHAN 1,463,083.38
C PERALATAN
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2.100 120,000.00 252,000.00
Tukang batu L.02 OH 0.350 160,000.00 56,000.00
Kepala tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.105 200,000.00 21,000.00
JUMLAH TENAGA KERJA 335,300.00
B BAHAN
Semen Portland Kg 448.000 2,100.00 940,800.00
Pasir beton Kg 667.000 159.97 106,701.90
Kerikil (maks 30 mm) Kg 1000.000 415.58 415,581.48
Bahan tambahan kimia Liter 4.500 -
Air Liter 200.000 -
JUMLAH HARGA BAHAN 1,463,083.38
C PERALATAN
A.4.2.1.4 Pembuatan 1m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.050 120,000.00 126,000.00
Tukang las biasa L.03 OH 1.050 180,000.00 189,000.00
Kepala tukang L.03 OH 0.105 180,000.00 18,900.00
Mandor L.04 OH 0.052 200,000.00 10,400.00
JUMLAH TENAGA KERJA 344,300.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 -
Besi pelat baja Kg 32.800 -
Kawat las Kg 0.050 28,500.00 1,425.00
JUMLAH HARGA BAHAN 1,425.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 345,725.00
E Overhead & Provit 15% x D 51,858.75
F Harga Satuan Pekerjaan ( D + E ) 397,583.75
A.4.2.1.19 Pemasangan 1 m' talang 1/2 lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 120,000.00 18,000.00
Tukang L.03 OH 0.300 180,000.00 54,000.00
Kepala tukang L.03 OH 0.030 180,000.00 5,400.00
Mandor L.04 OH 0.008 200,000.00 1,600.00
JUMLAH TENAGA KERJA 79,000.00
B BAHAN
Seng pelat m 1.050 20,000.00 21,000.00
Paku 1cm - 2,5 cm Kg 0.010 20,500.00 205.00
Besi strip m3 0.500 -
JUMLAH HARGA BAHAN 21,205.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 100,205.00
E Overhead & Provit 15% x D 15,030.75
F Harga Satuan Pekerjaan ( D + E ) 115,235.75
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60x120 cm, untuk partisi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 120,000.00 30,000.00
Tukang besi L.02 OH 0.250 160,000.00 40,000.00
Kepala tukang L.03 OH 0.025 180,000.00 4,500.00
Mandor L.04 OH 0.013 200,000.00 2,600.00
JUMLAH TENAGA KERJA 77,100.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.500 -
Assesoris ( perkuatan, las, dll) Ls 100%xrangka #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60cm, untuk plafon
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350
Tukang besi L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40.2mm M1 4.000
Assesoris ( perkuatan,las,dll) Ls 100%xrangka
JUMLAH HARGA BAHAN
C PERALATAN
A.4.2.1.22 (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.734
Tukang besi L.02 OH 0.734
Kepala tukang L.03 OH 0.073
A.4.4.1 Harga Satuan Pekerjaan Pasangan Dinding
A.4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 120,000.00 72,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 113,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 43.500 2,100.00 91,350.00
Pasir pasang m3 0.080 223,962.00 17,916.96
JUMLAH HARGA BAHAN 389,266.96
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 502,866.96
E Overhead & Provit 15% x D 67,560.00
F Harga Satuan Pekerjaan ( D + E ) 570,426.96
A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 120,000.00 72,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 113,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 32.950 2,100.00 69,195.00
Pasir pasang m3 0.091 223,962.00 20,380.54
JUMLAH HARGA BAHAN 369,575.54
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 483,175.54
E Overhead & Provit 15% x D 72,476.33
F Harga Satuan Pekerjaan ( D + E ) 555,651.87
A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 120,000.00 72,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 113,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 26.550 2,100.00 55,755.00
Pasir pasang m3 0.093 223,962.00 20,828.47
JUMLAH HARGA BAHAN 356,583.47
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 470,183.47
E Overhead & Provit 15% x D 70,527.52
F Harga Satuan Pekerjaan ( D + E ) 540,710.99
A.4.4.1.4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 160,000.00 96,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 137,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 22.200 2,100.00 46,620.00
Pasir pasang m3 0.102 223,962.00 22,844.12
JUMLAH HARGA BAHAN 349,464.12
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 487,064.12
E Overhead & Provit 15% x D 73,059.62
F Harga Satuan Pekerjaan ( D + E ) 560,123.74
A.4.4.1.5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 120,000.00 72,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 113,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 18.500 2,100.00 38,850.00
Pasir pasang m3 0.122 223,962.00 27,323.36
JUMLAH HARGA BAHAN 346,173.36
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 459,773.36
E Overhead & Provit 15% x D 68,966.00
F Harga Satuan Pekerjaan ( D + E ) 528,739.37
A.4.4.1.6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10 PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.600 120,000.00 72,000.00
Tukang batu L.02 OH 0.200 160,000.00 32,000.00
Kepala tukang L.03 OH 0.020 180,000.00 3,600.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 113,600.00
B BAHAN
Bata merah Buah 140.000 2,000.00 280,000.00
Semen portland Kg 10.080 2,100.00 21,168.00
Kapur padam m3 0.0275 -
Pasir pasang m3 0.0925 223,962.00 20,716.49
JUMLAH HARGA BAHAN 321,884.49
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 435,484.49
E Overhead & Provit 15% x D 65,322.67
F Harga Satuan Pekerjaan ( D + E ) 500,807.16
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 18.950 2,100.00 39,795.00
Pasir pasang m3 0.038 223,962.00 8,510.56
JUMLAH HARGA BAHAN 188,305.56
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 245,105.56
E Overhead & Provit 15% x D 36,765.83
F Harga Satuan Pekerjaan ( D + E ) 281,871.39
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 14.370 2,100.00 30,177.00
Pasir pasang m3 0.040 223,962.00 8,958.48
JUMLAH HARGA BAHAN 179,135.48
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 235,935.48
E Overhead & Provit 15% x D 35,390.32
F Harga Satuan Pekerjaan ( D + E ) 271,325.80
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 11.500 2,100.00 24,150.00
Pasir pasang m3 0.043 223,962.00 9,630.37
JUMLAH HARGA BAHAN 173,780.37
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 230,580.37
E Overhead & Provit 15% x D 34,587.05
F Harga Satuan Pekerjaan ( D + E ) 265,167.42
A.4.4.1.10 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 9.680 2,100.00 20,328.00
Pasir pasang m3 0.045 223,962.00 10,078.29
JUMLAH HARGA BAHAN 170,406.29
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 227,206.29
E Overhead & Provit 15% x D 34,080.94
F Harga Satuan Pekerjaan ( D + E ) 261,287.23
A.4.4.1.11 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 8.320 2,100.00 17,472.00
Pasir pasang m3 0.049 223,962.00 10,974.14
JUMLAH HARGA BAHAN 168,446.14
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 225,246.14
E Overhead & Provit 15% x D 33,786.92
F Harga Satuan Pekerjaan ( D + E ) 259,033.06
A.4.4.1.12 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 8PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 6.500 2,100.00 13,650.00
Pasir pasang m3 0.050 223,962.00 11,198.10
JUMLAH HARGA BAHAN 164,848.10
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 221,648.10
E Overhead & Provit 15% x D 33,247.22
F Harga Satuan Pekerjaan ( D + E ) 254,895.32
A.4.4.1.13 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3 KP : 10PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen portland Kg 4.500 2,100.00 9,450.00
Kapur padam m3 0.015 -
Pasir pasang m3 0.050 223,962.00 11,198.10
JUMLAH HARGA BAHAN 160,648.10
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 217,448.10
E Overhead & Provit 15% x D 32,617.22
F Harga Satuan Pekerjaan ( D + E ) 250,065.32
A.4.4.1.14 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM : 1KP : 1PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen merah Kg 0.018 14,000.00 252.00
Kapur padam m3 0.018 -
Pasir pasang m3 0.018 223,962.00 4,031.32
JUMLAH HARGA BAHAN 144,283.32
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 201,083.32
E Overhead & Provit 15% x D 30,162.50
F Harga Satuan Pekerjaan ( D + E ) 231,245.81
A.4.4.1.15 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM : 1KP : 2PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang batu L.02 OH 0.100 160,000.00 16,000.00
Kepala tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 200,000.00 3,000.00
JUMLAH TENAGA KERJA 56,800.00
B BAHAN
Bata merah Buah 70.000 2,000.00 140,000.00
Semen merah Kg 0.014 14,000.00 196.00
Kapur padam m3 0.014 -
Pasir pasang m3 0.028 223,962.00 6,270.94
JUMLAH HARGA BAHAN 146,466.94
C PERALATAN
-
JUMLAH HARGA ALAT
D Jumlah (A + B + C) 203,266.94
E Overhead & Provit 15% x D 30,490.04
F Harga Satuan Pekerjaan ( D + E ) 233,756.98
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.670
Tukang batu L.02 OH 1.300
Kepala tukang L.03 OH 0.130
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5cm m3 8.400
Mortar siap pakai Kg 0.473
JUMLAH HARGA BAHAN
C PERALATAN
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.671
Tukang batu L.02 OH 1.300
Kepala tukang L.03 OH 0.130
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 10 cm m3 8.400
Mortar siap pakai Kg 0.063
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10
A.4.5.1.1 Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5mm, dan 6mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.030
Tukang kayu L.03 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100
Paku tripleks Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
A.4.5.1.8 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120)cm berikut rangka alumunium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.500
Tukang besi L.03 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum "T" m 3.600
Kawat ɸ 4 mm Kg 0.150
Ramset Buah 1.050
Akustik 60x120 Lembar 1.500
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 120,000.00 840,000.00
Tukang Kayu L.03 OH 21.000 160,000.00 3,360,000.00
Kepala Tukang L.03 OH 2.100 180,000.00 378,000.00
Mandor L.04 OH 0.350 200,000.00 70,000.00
JUMLAH TENAGA KERJA 4,648,000.00
B BAHAN
Kusen Kayu Kelas 1 (bengkirai) m3 1.100 16,000,000.00 17,600,000.00
Paku 10cm kg 1.250 20,500.00 25,625.00
Lem kayu kg 1.000 18,500.00 18,500.00
JUMLAH HARGA BAHAN 17,644,125.00
C PERALATAN
A.4.6.1.1.a Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu belian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 120,000.00 840,000.00
Tukang Kayu L.03 OH 21.000 160,000.00 3,360,000.00
Kepala Tukang L.03 OH 2.100 180,000.00 378,000.00
Mandor L.04 OH 0.350 200,000.00 70,000.00
JUMLAH TENAGA KERJA 4,648,000.00
B BAHAN
Kusen Kayu Belian m3 1.100 24,000,000.00 26,400,000.00
Paku 10cm kg 1.250 20,500.00 25,625.00
Lem kayu kg 1.000 18,500.00 18,500.00
JUMLAH HARGA BAHAN 26,444,125.00
C PERALATAN
A.4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.000 120,000.00 720,000.00
Tukang Kayu L.03 OH 18.000 160,000.00 2,880,000.00
Kepala Tukang L.03 OH 1.800 180,000.00 324,000.00
Mandor L.04 OH 0.300 200,000.00 60,000.00
JUMLAH TENAGA KERJA 3,984,000.00
B BAHAN
Kusen Kayu Kelas II m3 1.200 13,000,000.00 15,600,000.00
Paku 10cm kg 1.250 20,500.00 25,625.00
Lem kayu kg 1.000 18,500.00 18,500.00
JUMLAH HARGA BAHAN 15,644,125.00
C PERALATAN
A.4.6.1.4 Pembuatan dan pemasangan 1m2 pintu klamp standar,kayu kelas III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.350 120,000.00 42,000.00
Tukang Kayu L.03 OH 1.050 160,000.00 168,000.00
Kepala Tukang L.03 OH 0.105 180,000.00 18,900.00
Mandor L.04 OH 0.018 200,000.00 3,600.00
JUMLAH TENAGA KERJA 232,500.00
B BAHAN
Papan kayu m3 0.040
Paku 5-7 cm kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 180,000.00 54,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 664,000.00
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.040 11,188,300.00 447,532.00
Lem kayu kg 0.500 18,500.00 9,250.00
JUMLAH HARGA BAHAN 456,782.00
C PERALATAN
A.4.6.1.5.a Pembuatan dan pemasangan 1m2 daun pintu panel, kayu belian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 180,000.00 54,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 664,000.00
B BAHAN
Papan Kayu Belian m3 0.040 14,814,000.00 592,560.00
Lem kayu kg 0.500 18,500.00 9,250.00
JUMLAH HARGA BAHAN 601,810.00
C PERALATAN
A.4.6.1.5.b Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 180,000.00 54,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 664,000.00
B BAHAN
Papan Kayu Kelas II (mabang) m3 0.040 8,300,000.00 332,000.00
Lem kayu kg 0.500 18,500.00 9,250.00
JUMLAH HARGA BAHAN 341,250.00
C PERALATAN
A.4.6.1.6.a Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.400 160,000.00 384,000.00
Kepala Tukang L.03 OH 0.240 180,000.00 43,200.00
Mandor L.04 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 531,200.00
B BAHAN
Papan kayu kelas II (mabang) m3 0.024 8,300,000.00 199,200.00
Lem kayu kg 0.300 18,500.00 5,550.00
JUMLAH HARGA BAHAN 204,750.00
C PERALATAN
A.4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang Kayu L.03 OH 3.000 160,000.00 480,000.00
Kepala Tukang L.03 OH 0.300 180,000.00 54,000.00
Mandor L.04 OH 0.050 200,000.00 10,000.00
JUMLAH TENAGA KERJA 664,000.00
B BAHAN
Papan kayu kelas I m3 0.064 11,188,300.00 716,051.20
Lem kayu kg 0.500 18,500.00 9,250.00
JUMLAH HARGA BAHAN 725,301.20
C PERALATAN
A.4.6.1.8 Pembuatan dan pemasangan 1m2 pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 120,000.00 84,000.00
Tukang Kayu L.03 OH 2.100 160,000.00 336,000.00
Kepala Tukang L.03 OH 0.210 180,000.00 37,800.00
Mandor L.04 OH 0.035 200,000.00 7,000.00
JUMLAH TENAGA KERJA 464,800.00
B BAHAN
Papan kayu Kelas II m3 0.025 8,300,000.00 207,500.00
Paku 1cm-2,5 cm kg 0.030 20,500.00 615.00
Lem kayu kg 0.500 18,500.00 9,250.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 337,365.00
C PERALATAN
A.4.6.1.9 Pembuatan 1m2 pintu plywood rangkap, rangka expose kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 120,000.00 96,000.00
Tukang Kayu L.03 OH 2.100 160,000.00 336,000.00
Kepala Tukang L.03 OH 0.240 180,000.00 43,200.00
Mandor L.04 OH 0.040 200,000.00 8,000.00
JUMLAH TENAGA KERJA 483,200.00
B BAHAN
Papan kayu kelas I m3 0.0256 11,188,300.00 286,420.48
Paku 1cm-2,5 cm kg 0.030 20,500.00 615.00
Lem kayu kg 0.500 18,500.00 9,250.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 416,285.48
C PERALATAN
A.4.6.1.12 Pemasangan 1m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.850
Tukang Kayu L.03 OH 2.550
Kepala Tukang L.03 OH 0.255
Mandor L.04 OH 0.043
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1cm-2,5 cm kg 0.030
Lem kayu kg 0.800
Teakwood 4 mm 90x220 cm Lembar 1.000
Formika Lembar 0.500
JUMLAH HARGA BAHAN
C PERALATAN
A.4.6.1.13 Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 120,000.00 480,000.00
Tukang Kayu L.03 OH 12.000 160,000.00 1,920,000.00
Kepala Tukang L.03 OH 1.200 180,000.00 216,000.00
Mandor L.04 OH 0.200 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,656,000.00
B BAHAN
Balok kayu kelas II uk. 6/12 m3 1.100 4,224,000.00 4,646,400.00
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 5.600 20,500.00 114,800.00
JUMLAH HARGA BAHAN 4,761,200.00
C PERALATAN
A.4.6.1.13.a Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 120,000.00 480,000.00
Tukang Kayu L.03 OH 12.000 160,000.00 1,920,000.00
Kepala Tukang L.03 OH 1.200 180,000.00 216,000.00
Mandor L.04 OH 0.200 200,000.00 40,000.00
JUMLAH TENAGA KERJA 2,656,000.00
B BAHAN
Balok kayu kelas II uk. 6/12 m3 1.100 11,000.00 12,100.00
Paku 12 cm kg 5.600 20,500.00 114,800.00
JUMLAH HARGA BAHAN 126,900.00
C PERALATAN
A.4.6.1.23 Pemasangan 1m2 rangka dinding pemisah (60x120) cm, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.150 120,000.00 18,000.00
Tukang Kayu L.03 OH 0.450 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.045 180,000.00 8,100.00
Mandor L.04 OH 0.008 200,000.00 1,600.00
JUMLAH TENAGA KERJA 99,700.00
B BAHAN
Balok kayu kelas II uk. 7/7 m3 0.028 4,716,717.69 132,068.10
Paku 5 dan 7 cm Kg 0.150 20,500.00 3,075.00
JUMLAH HARGA BAHAN 135,143.10
C PERALATAN
A.4.6.1.25 Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Kayu L.03 OH 0.600 160,000.00 96,000.00
Kepala Tukang L.03 OH 0.060 180,000.00 10,800.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 132,800.00
B BAHAN
balok kayukelas II uk. 6/12 m3 0.028 4,224,000.00 118,272.00
Paku 5 dan 10 Kg 0.150 20,500.00 3,075.00
Plywood 4 mm,120 x 240 Lembar 0.860 120,000.00 103,200.00
Lem kayu Kg 0.560 18,500.00 10,360.00
JUMLAH HARGA BAHAN 234,907.00
C PERALATAN
A.4.7.1.4. 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 120,000.00 8,400.00
Tukang cat L.02 OH 0.009 160,000.00 1,440.00
Kepala tukang L.03 OH 0.006 180,000.00 1,080.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 11,520.00
B BAHAN
Cat menie Kg 0.200 52,000.00 10,400.00
Plamuur Kg 0.150 31,500.00 4,725.00
Cat dasar Kg 0.170 70,000.00 11,900.00
Cat penutup Kg 0.260 84,000.00 21,840.00
Kuas buah 0.010 24,000.00 240.00
Pengencer Kg 0.030 25,000.00 750.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 50,555.00
C PERALATAN
A.4.7.1.5. 1m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.070 120,000.00 8,400.00
Tukang cat L.02 OH 0.105 160,000.00 16,800.00
Kepala tukang L.03 OH 0.004 180,000.00 720.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 26,520.00
B BAHAN
Cat menie Kg 0.200 52,000.00 10,400.00
Plamuur Kg 0.150 31,500.00 4,725.00
Cat dasar Kg 0.170 70,000.00 11,900.00
Cat penutup Kg 0.350 84,000.00 29,400.00
Kuas buah 0.010 24,000.00 240.00
Pengencer Kg 0.030 25,000.00 750.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 58,115.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 84,635.00
E Overhead & Provit 15% x D (maksimum) 12,695.25
F Harga Satuan Pekerjaan ( D + E ) 97,330.25
A.4.7.1.10. 1m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.020 120,000.00 2,400.00
Tukang cat L.02 OH 0.063 160,000.00 10,080.00
Kepala tukang L.03 OH 0.0063 180,000.00 1,134.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 14,214.00
B BAHAN
Plamuur Kg 0.100 31,500.00 3,150.00
Cat dasar Kg 0.100 27,000.00 2,700.00
Cat penutup Kg 0.260 28,000.00 7,280.00
JUMLAH HARGA BAHAN 13,130.00
C PERALATAN
A.4.7.1.11 1m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Interior setara Vinilex
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.280 120,000.00 33,600.00
Tukang cat L.02 OH 0.042 160,000.00 6,720.00
Kepala tukang L.03 OH 0.0042 180,000.00 756.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 41,676.00
B BAHAN
Cat dasar Kg 0.120 27,000.00 3,240.00
Cat penutup Kg 0.180 28,000.00 5,040.00
JUMLAH HARGA BAHAN 8,280.00
C PERALATAN
A.4.7.1.17. Pengecatan 1m2 permukaan baja dengan menie besi dengan perancah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.250 120,000.00 30,000.00
Tukang cat L.02 OH 0.225 160,000.00 36,000.00
Kepala tukang L.03 OH 0.0225 180,000.00 4,050.00
Mandor L.04 OH 0.0075 200,000.00 1,500.00
JUMLAH TENAGA KERJA 71,550.00
B BAHAN
Menie besi Kg 0.100 52,000.00 5,200.00
Pengencer L 0.010 25,000.00 250.00
Kwas Lbr 0.010 24,000.00 240.00
Perancah kayu m2 0.002 576,150.00 1,152.30
JUMLAH HARGA BAHAN 6,842.30
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 78,392.30
E Overhead & Provit 15% x D (maksimum) 11,758.85
F Harga Satuan Pekerjaan ( D + E ) 90,151.15
A.5.1.1 Harga Satuan Pekerjaan Sanitasi Dalam Gedung
A.5.1.1.8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.000 120,000.00 720,000.00
Tukang batu L.02 OH 3.000 160,000.00 480,000.00
Kepala tukang L.03 OH 0.300 180,000.00 54,000.00
Mandor L.04 OH 0.030 200,000.00 6,000.00
JUMLAH TENAGA KERJA 1,260,000.00
B BAHAN
Bata merah M2 150.000 -
Semen portlan Kg 120.000 2,100.00 252,000.00
Pasir pasang M3 0.300 223,962.00 67,188.60
Porselen 11x11 bh 360.000 -
Semen warna Kg 6.000 14,000.00 84,000.00
JUMLAH HARGA BAHAN 403,188.60
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 1,663,188.60
E Overhead & Provit 15% x D (maksimum) 249,478.29
F Harga Satuan Pekerjaan ( D + E ) 1,912,666.89
A.5.1.1.33. Pemasangan 1m' pipa air limbah jenis pipa tanah diameter 20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.080 120,000.00 9,600.00
Tukang batu L.02 OH 0.040 160,000.00 6,400.00
Kepala tukang L.03 OH 0.004 180,000.00 720.00
Mandor L.04 OH 0.004 200,000.00 800.00
JUMLAH TENAGA KERJA 17,520.00
B BAHAN
Pipa tanah buah 1.600 -
Semen portlan Kg 35.000 2,100.00 73,500.00
Pasir pasang M3 0.014 223,962.00 3,135.47
Pasir urug M3 0.014 -
JUMLAH HARGA BAHAN 76,635.47
C PERALATAN
A.5.1.1.34. Pemasangan 1m' pipa air limbah jenis pipa tanah diameter 15 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.060 120,000.00 7,200.00
Tukang batu L.02 OH 0.030 160,000.00 4,800.00
Kepala tukang L.03 OH 0.003 180,000.00 540.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 13,140.00
B BAHAN
Pipa tanah diameter 15 buah 1.600 -
Semen portlan Kg 0.680 2,100.00 1,428.00
Pasir pasang M3 0.013 223,962.00 2,911.51
Pasir urug M3 0.011 -
JUMLAH HARGA BAHAN 4,339.51
C PERALATAN
m 1.000
Pipa HDPE diameter 1000 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.093
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa HDPE diameter 1100 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.205
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
m 1.000
Pipa HDPE diameter 1200 mm
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari 1.584
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP diameter 63 m
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.345 120000
Tukang pipa L.02 OH 0.172 160000
Mandor L.04 OH 0.034 200000
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP diameter 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/ Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
9720
6560
1600
17880
0
0
0
0
17880
2682
20562
11280
7520
1800
20600
0
0
0
0
20600
3090
23690
Jumlah Harga (Rp.)
12600
8480
2200
23280
0
0
0
0
23280
3492
26772
14160
9440
2400
26000
0
0
0
0
26000
3900
29900
Jumlah Harga (Rp.)
22680
15200
3800
41680
0
0
0
0
41680
6252
47932
30720
20480
5200
56400
0
0
0
0
56400
8460
64860
Jumlah Harga (Rp.)
35280
23520
5800
64600
0
0
0
0
-64600
-9690
-74290
65280
43520
10800
119600
0
0
0
0
119600
17940
137540
Jumlah Harga (Rp.)
80280
53600
13400
147280
0
0
0
0
147280
22092
169372
97080
64800
16200
178080
0
0
0
0
178080
26712
204792
Jumlah Harga (Rp.)
114840
76640
19200
210680
0
0
0
0
210680
31602
242282
194160
129440
32400
356000
0
0
0
0
356000
53400
409400
Jumlah Harga (Rp.)
202920
135360
33800
372080
0
0
0
0
372080
55812
427892
227400
151680
38000
417080
0
0
0
0
417080
62562
479642
Jumlah Harga (Rp.)
251880
168000
42000
461880
0
0
0
0
461880
69282
531162
276360
184320
46000
506680
0
0
0
0
506680
76002
582682
Jumlah Harga (Rp.)
4200
2720
600
7520
0
0
0
0
7520
1128
8648
4800
3200
800
8800
0
0
0
0
8800
1320
10120
Jumlah Harga (Rp.)
5400
3680
1000
10080
0
0
0
0
10080
1512
11592
7440
4960
1200
13600
0
0
0
0
13600
2040
15640
Jumlah Harga (Rp.)
12240
8160
2000
22400
0
0
0
0
22400
3360
25760
15960
10720
2600
29280
0
0
0
0
29280
4392
33672
Jumlah Harga (Rp.)
20400
13600
3400
37400
0
0
0
0
37400
5610
43010
34800
23200
5800
63800
0
0
0
0
63800
9570
73370
Jumlah Harga (Rp.)
43080
28800
7200
79080
0
0
79080
11862
90942
51960
34560
8600
95120
0
0
0
0
95120
14268
109388
Jumlah Harga (Rp.)
61440
40960
10200
112600
0
0
0
0
112600
16890
129490
107160
71360
17800
196320
0
0
0
0
196320
29448
225768
Jumlah Harga (Rp.)
162360
108320
27000
297680
0
0
0
0
297680
44652
342332
199080
132800
33200
365080
0
0
0
0
365080
54762
419842
Jumlah Harga (Rp.)
218160
145440
36400
400000
0
0
0
0
400000
49908.75
449908.75
284400
189600
47400
474000
0
0
0
0
474000
71100
545100
Jumlah Harga (Rp.)
41400
27520
6800
75720
0
75720
11358
87078
48000
32000
8000
88000
0
0
0
88000
13200
101200
Jumlah Harga (Rp.)
53760
35840
9000
98600
0
0
0
98600
14790
113390
60720
40480
10200
111400
0
0
0
111400
16710
128110
Jumlah Harga (Rp.)
95520
63680
16000
175200
0
0
0
175200
26280
201480
113880
76000
19000
208880
0
0
0
208880
31332
240212
Jumlah Harga (Rp.)
114960
76640
19200
210800
0
0
0
210800
31620
242420
145440
96960
24200
266600
0
0
0
266600
39990
306590
Jumlah Harga (Rp.)
162360
108160
27000
297520
0
0
0
297520
44628
342148
176280
117600
29400
323280
0
0
0
323280
48492
371772
Jumlah Harga (Rp.)
159240
106240
26600
292080
0
0
0
292080
43812
335892
279240
186080
46600
511920
0
0
0
511920
76788
588708
Jumlah Harga (Rp.)
314760
209920
52400
577080
0
0
0
577080
86562
663642
349320
232960
58200
640480
0
0
0
640480
96072
736552
Jumlah Harga (Rp.)
384000
256000
64000
704000
0
0
0
704000
105600
809600
418560
279040
69800
767400
0
0
0
767400
115110
882510
Jumlah Harga (Rp.)
58680
15680
9800
84160
0
0
0
84160
12624
96784
65640
17440
11000
94080
0
0
0
94080
14112
108192
Jumlah Harga (Rp.)
73560
19680
12200
105440
0
0
0
105440
15816
121256
102600
27360
17000
146960
0
0
0
146960
22044
169004
Jumlah Harga (Rp.)
114120
30400
19000
163520
0
0
0
163520
24528
188048
116760
31200
19400
167360
0
0
0
167360
25104
192464
Jumlah Harga (Rp.)
185400
49440
15810
30800
281450
0
0
0
281450
42217.5
323667.5
217560
58080
24310
36200
336150
0
0
0
0
336150
50422.5
386572.5
245640
65440
32810
41000
384890
0
0
0
0
384890
57733.5
442623.5
241320
64320
49810
40200
395650
0
0
0
0
0
395650
59347.5
454997.5
463080
123520
83810
77200
747610
0
0
0
0
747610
112141.5
859751.5
599400.000
159840.000
100810.000
99800.000
959850.000
0
0
0
0
959850.000
143977.5
1103827.500
711720
189760
134810
138600
1174890
0
0
0
0
1174890
176233.5
1351123.5
0
0
0
0
1330090
199513.5
1529603.5
966720
257760
151810
161200
1537490
0
0
0
0
1537490
230623.5
1768113.5
Jumlah Harga (Rp.)
59880
16000
10000
85880
0
0
0
0
85880
12882
98762
69480
18560
11600
99640
0
0
0
0
99640
14946
114586
Jumlah Harga (Rp.)
77760
20800
13000
111560
0
0
0
0
111560
16734
128294
84960
22720
14200
121880
0
0
0
0
121880
18282
140162
Jumlah Harga (Rp.)
133560
35680
22200
169240
0
0
0
0
169240
25386
194626
159000
42400
26600
228000
0
0
0
0
228000
34200
262200
Jumlah Harga (Rp.)
169800
45280
28200
243280
0
0
0
0
243280
36492
279772
267720
71360
44600
383680
0
0
0
0
383680
57552
441232
291840
77760
48600
418200
0
0
0
0
418200
62730
480930
264960
70720
44200
379880
0
0
0
0
379880
56982
436862
467640
124640
78000
670280
0
0
0
0
670280
100542
770822
hari 0.968
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 0.865
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.2. (K3) Penyambungan pipa baru ke pipa yang ada diameter 100 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.650
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.159
hari 1.078
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 0.911
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.3. (K3) Penyambungan pipa baru ke pipa yang ada diameter 150 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.760
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.369
hari 1.353
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.026
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.4. (K3) Penyambungan pipa baru ke pipa yang ada diameter 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.870
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.579
hari 1.628
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.141
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.5. (K3) Penyambungan pipa baru ke pipa yang ada diameter 250 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 0.980
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.789
hari 1.903
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.256
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.6. (K3) Penyambungan pipa baru ke pipa yang ada diameter 300 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.090
mekanik/ cilinder saw
Sewa genset 1500 watt hari 0.999
hari 2.178
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.371
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.7. (K3) Penyambungan pipa baru ke pipa yang ada diameter 400 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.310
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.419
hari 2.728
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.601
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.8. (K3) Penyambungan pipa baru ke pipa yang ada diameter 450 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.420
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.629
hari 3.003
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.716
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.9. (K3) Penyambungan pipa baru ke pipa yang ada diameter 500 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.530
mekanik/ cilinder saw
Sewa genset 1500 watt hari 1.839
hari 3.278
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 1.831
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.10. (K3) Penyambungan pipa baru ke pipa yang ada diameter 600 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.750
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.259
hari 3.828
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 2.061
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.11. (K3) Penyambungan pipa baru ke pipa yang ada diameter 700 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 1.970
mekanik/ cilinder saw
Sewa genset 1500 watt hari 2.679
hari 4.378
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 2.291
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A.8.4.4.12. (K3) Penyambungan pipa baru ke pipa yang ada diameter 800 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa diameter 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/ hari 2.190
mekanik/ cilinder saw
Sewa genset 1500 watt hari 3.099
hari 4.928
Sewa pompa Submersible 3m3/h
Sewa Tripot / Tackel & handle hari 2.521
crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
0
JUMLAH HARGA ALAT 0
1177.6
(maksimum) 176.64
1354.24
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
Harga Satuan
Jumlah Harga (Rp.)
(Rp.)
120000 960
200000 160
JUMLAH TENAGA KERJA 1120
0
0
28800 57.6
JUMLAH HARGA BAHAN 57.6
0
Err:509
0
0
0
139200
0
0
0
Err:509
0
Err:509
Err:509
Err:509
100.000
0
Err:509
0
0
0
0
Err:509
0
Err:509
Err:509
Err:509
Lampiran B
Contoh Menghitung HSP dengan menggunakan angka koefisien
•
Sebagai contoh perhitungan HSP disini diambil beberapa jenis pekerjaan dari sub level 2 dengan menggunakan format sepert
lampiran A. Contoh yang disajikan disini adalah :
1) Pekerjaan Persiapan
2) Pekerjaan Penutup atap
3) Pekerjan Pengecatan
4) Pekerjaan Kunci dan Kaca
5) Pekerjaan Sanitasi dalam Gedung
6) Pekerjaan Perpipaan Air Minum di Luar Gedung
•
HSD tenaga kerja dan HSD bahan diambil dari harga "franco ditempat" yang ditetapkan oleh pemerintah setemp
hasil survey pasar
• Harga-harga dalam contoh ini berdasarkan survey pasar di kota Bandung tahun 2012
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang kayu L.02 OH 0.100 75,000
Kepala tukang L.03 OH 0.010 90,000
Mandor L.04 OH 0.005 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012 3,500,000
Paku 2"-3" Kg 0.020 14,000
Kayu papan 3/20 M3 0.007 4,000,000
JUMLAH HARGA BAHAN
C PERALATAN
Contoh 3 : Pengecatan 1m2 bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 50,000
Tukang cat L.02 OH 0.009 75,000
Kepala tukang L.03 OH 0.006 90,000
Mandor L.04 OH 0.003 90,000
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200 20,000
Plamuur 0.150 18,000
Cat dasar 0.170 48,000
Cat penutup 0.260 48,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 50,000
Tukang cat L.02 OH 0.600 75,000
Kepala tukang L.03 OH 0.06 90,000
Mandor L.04 OH 0.003 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.000 175,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang batu L.02 OH 0.150 75,000
Kepala tukang L.03 OH 0.015 90,000
Mandor L.04 OH 0.050 90,000
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok unit 1.000 200,000
Semen portland Kg 6.000 1,200
Pasir pasang M3 0.010 80,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.810 50,000
Tukang pipa L.02 OH 0.135 75,000
Kepala tukang L.03 OH 0.0135 90,000
Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M 1.000 110,000
Perlengkapan Ls 35% x pipa 110,000
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
1 Pekerja L.01 OH 0.810 50,000
2 Tukang pipa L.02 OH 0.135 75,000
3 Mandor L.04 OH 0.004 90,000
JUMLAH TENAGA KERJA
B BAHAN
1 Pipa PVC diamater 200mm 1.000 211,255
JUMLAH HARGA BAHAN
C PERALATAN
1 hari
Sewa Tripod / Tackel & handle 0.031 325,000
crane 2T
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
menggunakan format seperti pada
5,000
7,500
900
450
13,850
42
280
28,000
28,322
42,172
6,325.80
48,497.80
Jumlah Harga (Rp.)
7,500
5,625
675
720
14,520
55,000
59,520
10,428.00
79,948.00
3,500
675
540
270
4,985
4,000
2,700
8,160
12,480
27,340
32,325
4,848.75
37,173.75
3,000
45,000
5,400
270
53,670
175,000
27,340
228,670
34,300.50
262,970.50
5,000
11,250
13,500
4,500
34,250
200,000
7,200
800
208,000
242,250
36,337.50
278,587.50
4,050
10,125
1,215
360
15,750
38,500
54,250
8,137.50
62,387.50
5,346.00
4466.2
798
10610.2
211,255
211,255
10,075
10,075
231940.2
34,791.03
266,731.23
Lampiran C
Menghitung Rencana Anggaran Biaya
Untuk menghitung Rencana Anggaran Biaya (RAB) dapat digunakan program EXCEL, dengan langkah-langkah sebagai berikut :
1) Siapkan 4 sheet dalam program Excel
Sheet 1 untuk Daftar harga satuan bahan dan upah masukan semua jenis bahan dan upah OH dengan harga (franco ditempa
dengan harga resmi berdasarkan SK Bupati/Walikota atau hasil survey sendiri.
Sheet 2 untuk membuat analisis harga satuan pekerjaan, salin analisis jenis-jenis pekerjaan yang diperlukan dengan koefisien
koefisien tenaga sesuai dengan SNI-ABK 2008. Buat sheet 2 ini hyperlink dengan sheet 1.
Sheet 3 untuk membuat daftar harga satuan pekerjaan, buat tabel harga satuan samua jenis pekerjaan. Buat sheet 3 ini hype
Sheet 4 untuk membuat uraian RAB, membuat format RAB dengan memuat uraian pekerjaan, quantity, satuan harga satuan
harga. Halaman terakhir dari sheet 4 adalah rekapitulasi. Buat sheet 4 ini hyperlink dengan sheet 3.
2) Buka sheet 1, masukkan data harga satuan bahan dan upah dengan satuan sesuai yang tercantum dalam analisis di sheet 2.
PC dalam satuan Kg (bukan zak), upah tukang dalam satuan OH
3) Dengan mengisi sheet 1, maka sheet 2 (analisis) akan terisi dengan sendirinya, deminikian juga dengan sheet 3 dan sheet 4
4) Masing-masing kelompok uraian pekerjaan pada sheet 4 dipindahkan ke Form Rekapitulasi, kemudian tambahkan biaya tidak
(Overhead dan keuntungan). Penjumlahan rekapitulasi merupakan jumlah akhir dari Rencana Anggaran Biaya (RAB).
Contoh sheet 1
Daftar Harga Satuan Bahan dan Upah
Contoh sheet 2
Pengukuran dan Pemasangan 1m2 Bouwplank
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.100 50,000
Tukang kayu L.02 OH 0.100 75,000
Kepala tukang L.03 OH 0.010 90,000
Mandor L.04 OH 0.005 90,000
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.012 3,500,000
Paku 2"-3" Kg 0.020 14,000
Kayu papan 3/20 M3 0.007 4,000,000
JUMLAH HARGA BAHAN
C PERALATAN
Contoh sheeet 3 :
Daftar Harga Satuan Pekerjaan
Contoh sheeet 4 :
Rencana Anggaran Biaya
5,000
7,500
900
450
13,850
420
280
28,000
28,700
42,172
6,325.80
48,497.80
JUMLAH (Rp)
10000000.000
13567500.000
5704857.600
6697687.500
10414100.000
71655165.000