S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK Bed ash silo Com
2 HOT WORK Fly ash conditioner -2 2
HOT AND CONFINED
3 ESP 1
SPACE
4 NORMAL WORK ESP 1
5 NORMAL WORK MDC , ACS 1
6 NORMAL WORK Bed ash conveying line 1
Bed material conveying
7 NORMAL WORK Com
system
DATE : 18.04.2024
ACTIVITY
Second platform handrails correction work.
Conditioner support channel rectification work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
CONFINED SPACE
HIGHT AND CONFINED SPACE
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK Bed ash silo Com
2 HOT WORK Fly ash conditioner -2 2
HOT AND CONFINED
3 ESP 1
SPACE
4 NORMAL WORK ESP 1
5 NORMAL WORK MDC , ACS 1
6 HOT WORK Bed ash silo Com
DATE : 19.04.2024
ACTIVITY
Second platform handrails correction work.
Conditioner support channel rectification work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
CONFINED SPACE
HIGHT AND CONFINED SPACE
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK Bed ash silo Com
2 HOT WORK Fly ash conditioner -2 2
3 NORMAL WORK ESP 1
4 NORMAL WORK ESP 1
5 NORMAL WORK MDC , ACS 1
6 NORMAL WORK BED ASH CONVEYING LINE 1
7 HOT WORK Bed ash silo Com
DATE : 20.04.2024
ACTIVITY
Second platform handrails correction work.
Conditioner support channel rectification work.
DERM Coupling inspection an drection work.
Inlet and Bypass ash discharge gate valve rectification work.
Conveying line box-up.
Conveying line box-up.
Magnetic seperator platform correction work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
CONFINED SPACE
HIGHT AND CONFINED SPACE
HIGHT WORK AND HOT WORKS
HOT AND CONFINED SPACE
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 NORMAL WORK ESP 1
2 NORMAL WORK ESP 1
3 NORMAL WORK APH , ACS 1
ESP/APH/MDC Conveying
4 NORMAL WORK 2
system
DATE : 21.04.2024
ACTIVITY
DERM Coupling inspection an correction work.
Inlet and Bypass ash discharge gate valve rectification work.
Conveying line box-up.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT AND CONFINED SPACE
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK Fly ash silo -1 1
3 NORMAL WORK APH , ACS 1
ESP 6 th Field Conveying
4 NORMAL WORK 2
system
DATE : 22.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper 1 & 2
Bag filter Box-up.
Conveying System dome maintenance.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT AND CONFINED SPACE
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
3 NORMAL WORK Silo dump valves 1
4 HOT WORK AHP Compressor Com
5 HOT WORK Bed ash silo Com
6 HOT WORK Bed ash silo Com
DATE : 23.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Dump valves jamming clear and box-up.
Cooling water line leakage arrest work.
Magnetic seperator platform correction work.
Handrails repair work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
3 NORMAL WORK Silo dump valves 1
4 NORMAL WORK ESP -2 2
5 HOT WORK Bed ash silo Com
6 HOT WORK Bed ash silo Com
Bed material & Lime stone bag
7 HOT WORK 2
filter
8 HOT WORK APH surge hopper 1
9 NORMAL WORK ESP -2 2
DATE : 24.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Dump valves jamming clear and box-up.
CERM-10 Gearbox oil leakage arrest.
Magnetic seperator platform correction work.
Handrails repair work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
3 NORMAL WORK Silo dump valves 1
DATE : 25.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Dump valves jamming clear and box-up.
Magnetic seperator platform/Steps/Supporting column
correction work.
Staircase handrails repair work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
3 NORMAL WORK Silo dump valves 1
DATE : 26.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Dump valves jamming clear and box-up.
Magnetic seperator platform/Steps/Supporting column
correction work.
Staircase handrails repair work.
Base Support channel rectification work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
Silo dump valves & conveying
3 NORMAL WORK 1
line.
DATE : 27.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 NORMAL WORK APH , ACS 1
Silo dump valves & conveying
3 NORMAL WORK 1
line.
DATE : 28.04.2024
ACTIVITY
Mechanical Switch arranagement in Hopper's (1,2,6 &7)
Conveying System dome maintenance.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 HOT WORK APH , ACS 1
3 NORMAL WORK Ash conveying lines 1
DATE : 29.04.2024
ACTIVITY
Hopper Door Maintenance work
Conveying System Dome maintenance.
Conveying line jamming clear and box-up.
Magnetic seperator platform/Steps/Supporting column
correction work.
Staircase handrails repair work.
Surge Hopper/Vessel/Dome Valve Buffing work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 HOT WORK APH , ACS 1
3 NORMAL WORK Ash conveying lines 1
DATE : 30.04.2024
ACTIVITY
Hopper Door Maintenance work
Conveying System Dome maintenance.
Conveying line jamming clear and box-up.
Magnetic seperator platform/Steps/Supporting column
correction work.
Staircase handrails repair work.
Critical activities highlighted with RED Color in Daily Work Plan (DWP)
AM
n (DWP)
CIVIL EXCAVATION
HIGHT WORK AND HOT WORKS
HOT WORK
MEENAKSHI ENERGY LTD
1000 MW THERMAL POWER PLANT-THAMMINAPA
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK ESP 1
2 HOT WORK APH , ACS 1
3 NORMAL WORK Ash conveying lines 1
DATE : 01.05.2024
ACTIVITY
Insulator maintenance work
Conveying System Dome maintenance.
Conveying line jamming clear and box-up.
Magnetic seperator platform/Steps/Supporting column
correction work.
Staircase handrails repair work.
DEPARTMENT : AHP
S.No SAFETY ATTENTION EQUIPMENT NAME Unit
1 HOT WORK APH , ACS 1
2 NORMAL WORK Ash conveying lines 1
3 NORMAL WORK Bed ash silo Com
4 HOT WORK ESP,Hoppers 2
5 NORMAL WORK Ash conveying system 2
6 NORMAL WORK Silo/Bed material Roof Com
NOTE: Critical activities highlighted with RED Color in Daily Work Plan (DWP)
MEENAKSHI ENERGY LTD
0 MW THERMAL POWER PLANT-THAMMINAPATNAM
POWERMECH PROJECTS LTD
DAILY WORK PLAN
DATE : 10.05.2024
ACTIVITY
Conveying System bellows box up
Conveying line flange and Dump valves box-up.
Bucket elevator inspection & maintenance.
Hopper nut bolt welding work for heater installation
Condition based maintenance
Roof sheeting inspection and correction.
Work Plan (DWP)