A-1 P-1 A-2 C/L OF PIER (P-1)
C/L OF P-1
TO MORBI TO SAMAKHAYALI 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METER UNLESS WRITTEN OTHERWISE. SHALL BE ENSURED BY INSPECTING ENGINEER.
24258 [17000SQ]
2. NO DIMENSIONS SHALL BE SCALED FROM THIS DRAWINGS. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED. 30. DURING EXECUTION OF WORK ANY S&T CABLE FOUND THEN SHIFTING OF CABLE WORK TO BE DONE ON PRIORITY.
HIGH CONTAINMENT 31798 [22283SQ] C/C OF EXP. 31798 [22283SQ] C/C OF EXP. HIGH CONTAINMENT
CRASH BARRIER (TYP) CRASH BARRIER (TYP) 19977 [14000SQ] (Carriage way) 3. EXISTING WORK SHOWN IN BLACK, PROPOSED WORK SHOWN IN RED, ASSETS BEING DISMANTLED SHOWN IN GREEN 31. IN CASE OF S&T CABLE CUTTING/DAMAGE,PENALTY SHOULD BE IMPOSED AS PER RAILWAY BOUNDARY LETTER NO.
1826 [1279SQ] 30000(21023) C\C OF BEARING 30000 (21023) C\C OF BEARING
40 MM EXP. JOINT 40 MM EXP. JOINT FRL 18.69 AND FUTURE WORK SHOWN IN BLUE. 2003/TELE/RCIL/1 PT.IX DATED 24-06-2013.
30000 [21023SQ] C/C OF BEARING FRL 18.69 30000 [21023SQ] C/C OF BEARING 60MM PAVER BLOCK FRL 18.69
4. ACTUAL LOCATION OF ROB SHALL BE DECIDED BY RAILWAY ENGINEER-IN-CHARGE IN CONSULTATION WITH ROAD 32. FOR SUPERSTRUCTURE (FOR 45.51° SKEW ANGLE) REFER SEPARATE DRAWING DULY PROOF CHECKED
600.0000
SLO
C.C 1:3:6 2.5% SLOPE 2.5% SLOPE COMPOSITE GIRDER
IN 40 STEEL COMPOSITE GIRDER AS PER DESIGN STEEL COMPOSITE GIRDER AS PER DESIGN P E 1 IN CABLE DUCT BOTTOM OF
PE 1 AS PER DESIGN COMPOSITE GIRDER COMPOSITE GIRDER AUTHORITIES AT THE TIME OF ITS CONSTRUCTION. BY IIT / NIT AND APPROVED BY CONSTRUCTION DEPARTMENT.
SLO 40
1000
BOTTOM OF GIRDER 16.865 2500(SQ) 1000(SQ) GIRDER 16.865 AS PER DESIGN AS PER DESIGN
5. ACTUAL DEPTH OF FOUNDATION SHALL BE DECIDED BY ENGINEER-IN-CHARGE TO SUIT THE SOIL STRATA MET WITH 33. NUMBER OF PILES AND DEPTH OF PILES SHOWN ARE TENTATIVE FOR DETAILS, REFER SEPARATE DRAWING.
8325
2500 2500 2500 2500 2500 3567(SK) 1427(SK)
750 750
4710 [3300SQ] BOTTOM OF GIRDER 16.865 (SQ) (SQ) (SQ) (SQ) (SQ) AT THE SITE. 34. THE DESIGN OF APPROACHES ARE TO BE APPROVED BY ROAD AUTHORITY
7999 [5605SQ] 8990 [6300SQ] 11865 [8315SQ] 1500(SQ)
11005 [7712SQ] 10702 [7500SQ] 7125 [4993SQ] 7 GIRDER'S AT 2500 C/C 6. VERTICAL CLEARANCE FROM HIGHEST RAIL LEVEL TO BOTTOM OF GIRDER SHALL BE 8.325m IN CASE OF 35. BEFORE EXECUTION OF WORK CONCERNED SSE/SIG AND ADSTE TO BE INFORMED WELL IN ADVANCE.
2140(SK)
2000 4710 [3300SQ] DFC/FEEDER/ROUTE AS PER CBE'S LETTER NO W 420 (D) (POLICY)(W3) DTD 22.07.2013 36. PROVISION OF CLAMPS IN THE SUPERSTRUCTURE FOR A.C. TRACTION WIRE TO BE MADE IN CONSULTATION WITH
25685 [18000SQ] 0
PRL : 8.540 2000 THE CONCERNED AUTHORITIES.
5700 [3994SQ] 7. GUARD RAIL SHALL BE PROVIDED AS PER STANDARD DRAWING.
8. SHAPES & SIZE OF GIRDERS, POT-PTFE / ELASTOMERIC BEARING, BEARING PEDESTALS, DIMENSIONS OF ALL 37. REPRESENTATION OF TELECOM AND SIGNALING DEPT. SHALL BE MADE AVAILABLE BEFORE COMMENCEMENT OF
9226 [6465SQ] 5285 [3704SQ] 6139 [4302SQ] 10085 [7067SQ] RCC CIRCULAR PIER
STRUCTURAL MEMBERS, i.e. PILE,PILE CAP, PIER, PIER CAP ETC. SHOWN ARE TENTATIVE AND SHALL BE AS PER PROPOSED WORK IN THE VICINITY OF SIGNAL AND TELECOM CABLE.
4200 4200 RE WALL/APPROACH ROAD 38. SUITABLE SPEED RESTRICTION IF REQUIRED SHALL BE IMPOSED BY ENGINEER IN CHARGE DURING THE EXECUTION
150 MM THK. LEAN 4200 AS PER NHAI STRUCTURAL DESIGN & DRAWING. SUBMITTED BY CONSULTANT/PARTY AND APPROVED BY RAILWAY.
8775 [6150SQ] 8775 [6150SQ]
CONC. M15 2000 9. WEEP HOLES SHALL BE PROVIDED IN ABUTMENT AND RETURN WALLS. WORK.
1200 DIA. PILE 7406 [5190SQ] 4053 [2840SQ] 10. ANTI CRASH BARRIER SHALL BE PROVIDED AS PER MORTH/NHAI STANDARD. 39. TEMP ENGINEERING INDICATORS WILL BE PROVIDED AS PER G.R 15.09(2)b+ S.P 15.09 (2).
RAIL LEVEL 8.540 11. ONLY CONTROLLED CEMENT CONCRETE MIX IS TO BE PROVIDED. GRADE OF CONCRETE FOR MASS CONCRETE AND 40. PROTECTIVE SCREENS TO BE PROVIDED FOR EACH TRACK DURING EXECUTION OF SUPERSTRUCTURE.
RAIL LEVEL 8.540 41. NON-STANDARD SPAN SHOULD BE AVOIDED AS FAR AS POSSIBLE. IN CASE OF UNAVOIDABLE CIRCUMSTANCES, IF
AV. G.L. 7.540 FOR RCC WORK SHALL NOT BE LEANER THAN M-20 AND M-25 RESPECTIVELY.
ELEVATION AV. G.L. 7.540 PILE CAP LEVEL 7.040
12. WEARING COAT OF 80mm (COMPOSITE GIRDER) TO BE PROVIDED (RAILWAY PORTION). NON-STANDARD SPAN OF ROB IS USED, THEN ITS FABRICATION INSPECTION OF GIRDER SHALL BE DONE BY RDSO
PILE CAP LEVEL 7.040
1800
5700 [3995SQ] VIDE RLY BOARDS LETTER NO. 2016/54/CE-III/BR/RDSO/MISC. DATED 15.07.2019.
13. A SEPARATE LAUNCHING SCHEME OF SUPER STRUCTURE HAS TO BE SUBMITTED WHICH WILL BE APPROVED BY CBE
22689 [15900SQ]
BEFORE COMMENCEMENT OF LAUNCHING AND CRS SANCTION TO BE TAKEN AFTERWARDS. 42. THE GAD WILL NEED TO BE REVALIDATED TO MATCH PREVAILING GROUND CONDITIONS, IF THE WORK IS NOT
1200 DIA. PILE 14. EXCAVATION OF ROB WORK SHALL BE DONE ONLY IN PRESENCE OF AUTHORIZED RAILWAY REPRESENTATIVE TO COMMENCED WITHIN 2 YEARS OF COMMENCEMENT.
18495 7618 5137 [3600SQ] 5137 [3600SQ] 5137 [3600SQ] 5137 [3600SQ]
4200 [2943SQ] ENSURE THE SAFETY OF RUNNING TRAINS. PROPER PRECAUTIONS SHALL BE TAKEN DURING EXCAVATION OF OPEN 43. ALL STRUCTURAL DIMENSIONS OF SUPER STRUCTURE AND SUB STRUCTURE ARE TENTATIVE AND WILL BE AS PER
FOUNDATION NEAR THE EXISTING RAILWAY TRACK. IN CASE THE EXCAVATION TO BE DONE NEAR THE TRACK, FINAL DESIGN AND DRAWING PROOF CHECKED BY IIT/NIT & APPROVED BY CONSTRUCTION ORGANIZATION.
7406 [5190SQ] 10702 [7500SQ] 17124 [12000SQ] 8990 [6300SQ] 4053 [2840SQ]
PROPER SHORING SHALL BE DONE TO PROTECT SLOPE FAILURE OF SOIL. 44. THE BRIDGE SHALL BE DESIGNED FOR 70R(WHEELED), A-CLASS LIVE LOAD AND FOR SPECIAL 385 T VEHICLE AS PER
15. ADDITIONAL LOAD TRANSFERRED FROM FUTURE TRACKS SHALL BE CONSIDERED WHILE DESIGNING OF FOUNDATION IRC-6 (LATEST AMENDMENT).
CROSS SECTION AT A-A CROSS SECTION AT B-B ON EITHER SIDE. 45. THE PROPOSED ROB, AS PER FIELD UNIT, IS IN ZONE IV BUT IS IN PROXIMITY OF ZONE V. SO THE AVERAGE FACTOR
16. SINCE ROB IS IN SEVERE EXPOSURE CONDITION, IN ORDER TO OFFER ADEQUATE RESISTANCE AGAINST CORROSION, OF ZONE IV AND ZONE V SHALL BE CONSIDER FOR DESIGN. VIDE NATIONAL CENTER FOR SEISMOLOGY'S LETTER NO.
THE REINFORCEMENT BARS SHALL BE PROVIDED WITH SUITABLE PROTECTIVE COATING DEPENDING UPON THE NIL DT. 20.7.2021
45. ENVIRONMENTAL CONDITION AS PER PARA 7.15 OF CONCRETE BRIDGE CODE CORRECTION SL. NO 2 DT. 26.04.2000 46. EXPOSURE CONDITION: 'SEVERE'
57
51° C 150 DIA. PVC NHAI C/L
00
A DRAIN PIPE 17. OFFICE FOR THE RAILWAY ENGINEERS AT BRIDGE SIDE OR AT NEAR BY LOCATION DECIDED BY THE RAILWAY SHALL 47. AS PER HQ'S LETTER NO E161/27/SYSTEM IMPROVEMENT/V4 DTD 10.01.2021, PILE INTEGRITY TEST(PIT) SHALL BE
[3
99
FOOTPATH C/L OF P-1 BE PROVIDED BY SPONSORING ROAD AUTHORITY AND MAINTAINED DURING THE PERIOD OF CONSTRUCTION OF THE INVARIABLY CONDUCTED FOR ALL THE PILES FOR THE BRIDGES PROVIDED WITH PILE FOUNDATIONS.
5S
48. THE QAP OF THE SUPER STRUCTURE SHALL BE AS PER CBE'S LETTER NO. W 420
Q
24258 [17000SQ] PROJECT. 0 (D) (POLICY)(W3) DATED 22.07.2013.
]
]
30000 [21023SQ]
S Q W-BEAM 19977 [14000SQ] (Carriage way) 18. LONG DURABILITY ANTI CORROSIVE PROTECTION SHOULD BE APPLIED TO THE STEEL STRUCTURE. 49. THE STEEL GIRDERS SHALL BE FABRICATED AND INSPECTED BY INSPECTION CELL OF RAILWAY OR THIRD PARTY
30000 [21023SQ]
00 19. INSPECTION LADDER AND PLATFORM FOR INSPECTION OF BEARING SHOULD BE PROVIDED AT EVERY PIER & INSPECTION AGENCY LIKE RITES/WRI, OR CEIL AS ADVISED IN RAILWAY BOARD'S LETTER NO.S”:
59
[1 60MM PAVER BLOCK
ABUTMENT. (a)2016/54/CE-III/BR/RDSO MISC. DATED 15/07/2019.
AB 89 C.C 1:3:6
600.0000
FRL 18.69
SL 226 AB CABLE DUCT
2.5% SLOPE
20. ALL THE TECHNICAL RECORD. I.E CUBE STRENGTH, PRE-STRESSING DETAILS ETC. SHALL BE HANDED OVER TO (A) 2017/16/CE-III/BR. GIRDER INSPECTION DATED 24/07/2019.
H
AC SL C/L OF CARRIAGEWAY
RAILWAY ENGINEER-IN-CHARGE.
O H 50. RAILWAY WILL SHARE THE COST AS PER RAILWAY BOARDS/ZONAL RAILWAYS GUIDELINES.
PR AC BOTTOM OF GIRDER 16.690 21. BEFORE OPENING OF ROB, COMPLETION DRAWING AND COMPLETE COST OF ROB IN HARD COPY AND SOFT COPY
BO
O
AP PR DULY APPROVED BY AUTHORITIES SHALL BE HANDED OVER TO RAILWAY ENGINEER IN CHARGE.
51. AS PER DY CE (C) IV ADI'S COMPLIANCE LETTER & CAO(C) CCG'S FILE NO. WR-HQ0S&C (SCDG)/45/2021-O/O
B
U
B AP 7 GIRDER'S AT 2500 C/C
LD
CRASH BARRIER 22. BEFORE OPENING OF ROB (WITHIN RAILWAY PORTION) FOR ROAD TRAFFIC, APPROVAL OF RAILWAY ENGINEER IN DYCE/C/IV/ADI/WR(COMPUTER NO 232739) DRAWING IS APPROVED FOR SKEW ANGLE MORE THAN 20 DEGREES
6500
35350
ER
25685 [18000SQ] & NON STANDARDS GIRDERS AS SUPERSTRUCTURES.
CHARGE IS TO BE OBTAINED BY ROAD AUTHORITY.
RE WALL
PI
23. GRADE OF CONCRETE SHALL BE AS PER FINAL STRUCTURAL DESIGN BY CONSTRUCTION DEPARTMENT. 52. SUITABLE ARRANGEMENT( RCC WALL TYPE) SHALL BE DONE BEHIND THE ABUTMENT A1 & A2 TO PROTECT THE
TC
A
Y
AR 24. STOPPER SHOULD BE PROVIDED AT END ON THE TOP OF PIER CAP TO REDUCE POSSIBILITIES OF TOPPING OF GIRDER RAILWAY TRACKS IF RE WALL FAILS.
H
D
IN
K K 3337 [2338SQ] K N DURING LAUNCHING OF GIRDER.
AC
G
Y AC AC U 8775 [6150SQ] 8775 [6150SQ]
AR K 25. CRS SANCTION SHALL BE OBTAINED BEFORE COMMENCEMENT OF WORK.
TR TR TR BO
10750
EXISTING BRIDGE
N
D E AC D EXISTING BRIDGE 26. AS PER RAILWAY BOARD LETTER NO. 2007/RE/161/5-FTS -774, DATED 12-10-2011. TRACK LEVEL SHOULD BE FROZEN.
(TO BE DISMANTLED) U R D TR E N (TO BE DISMANTLED)
BO TU SE G R LA 27. THE COST OF MODIFICATION OF OHE TO BE CHARGEABLE TO ESTIMATE.
PO N TU .
D FU I
FU LY RAIL LEVEL 8.540 28. PROPOSED ROB IS IN REPLACEMENT OF EXISTING ROB SO NO DIVERSION PLAN IS REQUIRED .
N O ST R
LA PR EXI AV. G.L. 7.540
3568 [2500SQ] 29. THE QAP BEARING AS PER RDSO FORMAT (CIRCULATED BY RDSO VIDE LETTER NO.CBS/PBEJ/reg. DATED 16.05.2014)
. PILE CAP LEVEL 7.040
LY WESTERN RAILWAY
R 22689 [15900SQ]
8400
62 8
33
31
45.
51°
00
5137 [3600SQ] 5137 [3600SQ] 5137 [3600SQ] 5137 [3600SQ]
MANTHAN
60 30
00 98
CL OF EXISTING BRIDGE
19
N
TITLE: GENERAL ARRANGEMENT DRAWING (RAILWAY PORTION)
IO
AT
SHOWING PART PLAN SHOWING PART PLAN AT
ST
(CURVE DETAILS) CLIENT: DY. CE (CONSTRUCTION) - IV - AHMEDABAD , WESTERN RAILWAY
AT FOUNDATION LEVEL
AN
DECK LEVEL (CURVE DETAILS) RADIUS OF CURVE
SUPER ELEVATION
400 M
1.5189%
IY
RADIUS OF CURVE 400 M VEHICLE SPEED 100 KMPH Signature block
M
SUPER ELEVATION 1.5189% CURVE + STRAIGHT LENGTH 120 M
YA
VEHICLE SPEED 100 KMPH 1 IN 15 (97M)
FLARE RATE
MANJUL MATHUR Digitally signed by MANJUL MATHUR
120 M
LI
(FOR PROP. ROB) CURVE + STRAIGHT LENGTH
60.000 MA
FLARE RATE 1 IN 15 (97M) BORE LOG DETAIL BORE LOG DETAIL CBE-CCG
BORE LOG DETAIL Date: 2021.11.15 11:40:48 +05'30'
BORE LOG-2 (CENTER PIER) BORE LOG-3 (ABUTMENT-1 -MALIYA SIDE)
TO
HIMANSHU SHARMA
BORE LOG-1(ABUTMENT-1- MORBI SIDE) Digitally signed by HIMANSHU SHARMA
-466.000
-460.000
-440.000
-420.000
-400.000
-380.000
-369.000
-360.000
-340.000
-320.000
-300.000
-280.000
-260.000
-240.000
-220.000
-200.000
-180.000
-160.000
-140.000
-120.000
-100.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
240.000
260.000
280.000
300.000
320.000
340.000
360.000
378.000
380.000
400.000
420.000
440.000
460.000
475.000
-80.000
-60.000
-40.000
-20.000
20.000
40.000
80.000
RL - 7.650M RL - 7.650M
0.000
RL - 7.340M DYCE-DESIGN-CCG Date: 2021.11.11 11:22:50 +05'30'
soil soil soil
Depth
(m)
Description
of strata
classifi Strata
-cation Legend
Depth
(m)
Description
of strata
classifi Strata
-cation Legend
Depth
(m)
Description
of strata
classifi Strata
-cation Legend
AXEN-DESIGN-CCG N K Chaudhary Digitally signed by N K Chaudhary
Date: 2021.11.09 12:32:21 +05'30'
brownish sandy soil SP Brownish Sandy Soil, SP brownish sandy soil SP NAND RAM Digitally signed by NAND RAM
START OF BRIDGE
END OF BRIDGE
CE-C-V-CCG
TO SAMAKHAYALI
1 white soil with little 1 Date:2021.10.06 04:14:38 +05'30'
TO MORBI whitish silty soil gravel whitish silty soil
SRXEN-C-DES-CCG
Anurag Sharma Digitally signed by Anurag Sharma
with little gravel SW with little gravel SW Date:2021.10.05 10:07:57 +05'30'
1.5 1.5 1.5 Avinash Kumar Digitally signed by Avinash Kumar
P1 A-2 brownish medium brownish medium brownish medium
XEN-C-P&D-ADI
Date:2021.10.04 06:14:02 +05'30'
1 in 15 FLARE (97M) 1 in 15 FLARE (97M) to fine grained SP to fine grained sw to fine grained SP
DEEPAK KUMAR JHA Digitally signed by DEEPAK KUMAR JHA
C/L OF P1 C/L OF A2 3 Sandy soil. Sandy soil. 3 Sandy soil. DRM-AHMEDABAD
Date:2021.09.29 06:06:02 +05'30'
N
K) sand stone with sand stone with
IO
(S Q) SP 3.5 SP PAWAN KUMAR SINGH Digitally signed by PAWAN KUMAR SINGH
AT
7
6 (S cleyey soil cleyey soil
35 00 4.5 4.5 SRDOM-ADI
ST
) 25 sand stone with Date:2021.09.27 11:51:26 +05'30'
SK ) SP
7( SQ cleyey soil
A
) 6 1425 VISHAL MONDLOI Digitally signed by VISHAL MONDLOI
RV
(
K
(S Q) 35 00 5.0 SRDEE-ADI
1425
30000(21023SQ) SPAN
HA
5
COMPOSITE GIRDER
2500(SQ)
2
68 (S SK )
25 000 7( SQ to fine grained to fine grained
AD
6 ( brwonish medium KALLARAM MEENA Digitally signed by KALLARAM MEENA
18 35 0 2025 SRDEE(TRD)-ADI
W
) 250 clayey sandy soil SP clayey sandy soil
ROAD MERGING AND KEY PLAN to fine grained Date:2021.09.27 03:48:56 +05'30'
2500(SQ)
TO
K
(S ) clayey sandy soil
67 (SQ VIJENDRA KUMAR MEENA Digitally signed by VIJENDRA KUMAR MEENA
35 00 with little gravel DEN(WEST)-ADI
K) 25 9 9.5 9 Date:2021.09.27 11:31:21 +05'30'
2500(SQ)
K 2
(S Q)
A-1 P-1 A-2 10.5 10.5 Date:2021.09.23 05:44:05 +05'30'
7
6 (S medium to fine 11.00 medium to fine RAJKUMAR RAMACHANDER AMBIGAR Digitally signed by RAJKUMAR
35 00 grained Sandy soil grained Sandy soil
25 SP medium fine grained SP SP DYCEE-C-ADI
2500(SQ)
12 12 RAMACHANDER AMBIGAR
30000 30000 brwonish medium 12.50 Sandy soil
brwonish medium Date:2021.09.22 02:37:27 +05'30'
18
80MM EXP.JOINT
17 to fine grained SP brownish medium SP to fine grained SP RAJESH KUMAR MITTAL Digitally signed by RAJESH KUMAR MITTAL
0 DYCE-C-IV-ADI
16 IN 4 clayey sandy soil to fine grained clayey sandy soil Date:2021.09.15 07:29:11 +05'30'
PE 1
SLO
33 710
IN 40
TO MORBI
(S K)
14 15 with little gravel 15 tushar upendra shukla Digitally signed by tushar upendra shukla
Q
TO SAMAKHAYALI AXEN-C-II-MALB
)
13 brownish sandy soil 15.50 brownish sandy soil Date:2021.09.13 02:33:04 +05'30'
12 with little gravel SP brownish Sandy Soil with little gravel SP
11 16.5 SP 16.5 GAYAN PRAKASH Digitally signed by GAYAN PRAKASH
with little gravel SSE-C-W-I-GIM
10 brwonish Sandy soil 17.00 brwonish Sandy soil Date:2021.09.22 01:20:51 +05'30'
9 SP SP
PRAKASH SHARMA Digitally signed by PRAKASH SHARMA
8 18 Brownish Sandy Soil SP 18 SSE-C-DRG-VI-ADI
8
Date:2021.09.13 02:30:53 +05'30'
Datum: 6.0 7
7
18.50
DYCEE(RE)-HQ-ADI DEEPAK KUMAR GUPTA Digitally signed by DEEPAK KUMAR GUPTA
brownish medium brownish medium
11.180
11.040
11.510
11.050
11.460
11.300
11.430
11.420
10.470
11.340
11.480
11.340
11.110
10.890
11.260
10.990
10.795
10.360
Date:2021.09.24 05:55:21 +05'30'
7.550
7.450
7.410
7.330
7.150
7.920
7.940
7.860
7.910
7.550
7.490
7.520
7.740
7.750
8.460
9.130
9.080
9.140
9.580
9.301
8.740
8.740
8.000
8.560
8.280
7.680
7.340
7.420
GROUND to fine grained brownish medium to fine grained
LEVEL clayey sandy soil SC to fine grained SC clayey sandy soil SC SRDSTE(SIG)-ADI SUDHEER N SINGH Digitally signed by SUDHEER N SINGH
with little gravel clayey sandy soil with little gravel Date:2021.09.29 12:59:11 +05'30'
10.130
10.630
11.130
11.630
12.130
12.630
13.130
13.630
14.130
14.630
15.130
15.630
16.130
16.630
17.130
17.480
17.630
17.630
17.480
17.130
16.630
16.130
15.630
15.130
14.630
14.130
13.630
13.130
12.630
12.130
11.630
11.130
10.630
10.130
PROPOSED FRL 18.66 18.66 18.66 with little gravel MANOJ KUMAR AGARWAL Digitally signed by MANOJ KUMAR AGARWAL
7.480
7.630
8.130
8.630
9.130
9.230
9.630
18.66
18.69
18.69
18.69
9.630
9.130
9.000
8.630
8.130
7.630
7.225
PROPOSED SSE-C-DRG-I-ADI
Date:2021.10.04 06:15:13 +05'30'
FRL
GROUND LEVEL 11.230 10.990 11.330 THAKUR ANKITA RAJKUMAR Digitally signed by THAKUR ANKITA RAJKUMAR
24.00 24.00 SSE-C-DESIGN-III-ADI
Sand stone with cleyey 24.50 Sand stone with cleyey Date:2021.10.05 10:51:32 +05'30'
CHAINAGE IN MTR. 0 0+030 0+060 VERTICAL
L=80M 0.25% L=50.0M 60.000M L=50.0M
0.25%
L=80M 25 sand 25 sand
ALIGNMENT Sand stone with cleyey SC VIVEK PITALE Digitally signed by VIVEK PITALE
SSE-DRG-III-CCG
25.50 sand Date:2021.11.03 01:58:00 +05'30'
-466.000
-460.000
-440.000
-420.000
-400.000
-396.000
-380.000
-360.000
-340.000
-320.000
-300.000
-280.000
-260.000
-240.000
-220.000
-200.000
-180.000
-160.000
-140.000
-120.000
-100.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
240.000
260.000
280.000
300.000
320.000
340.000
360.000
380.000
400.000
405.000
420.000
440.000
460.000
475.000
480.000
-80.000
-66.000
-60.000
-40.000
-30.000
30.000
40.000
60.000
80.000
0.000
SC SC SC
CHAINAGE brownish medium
to fine grained
brownish medium
to fine grained
brownish medium
to fine grained
DRG.NO: DY.CE(C)-VI-ADI/ 609 /D-WDHR-MALB
clayey sandy soil clayey sandy soil clayey sandy soil
with little gravel with little gravel with little gravel DRG.NO: CAO (C) CCG/ 29748 /D-WDHR-MALB
30 30 30
BRIDGE PROFILE PCE NO.e-29497-DRM / 4-D
NOTES :
G7 C
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
G6
G5
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
C/L OF BEARING
C
TESTING OF STUD SHEAR CONNECTOR:
ELEVATION
SECTION C-C
G4
DETAIL AT 'Z'
DETAIL AT CONNECTION BETWEEN
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 END STIFFNER AND END CROSS GIRDER
C/L OF SPLICE
G3
C/L OF SPLICE
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
DETAILS OF STUD
SHEAR CONNECTOR
TOP SPLICE PLAN APPROVAL TO THE DESIGN AND DRAWING BY
THE RAILWAY AUTHORITY SHALL HOWEVER IN NO WAY
G2 RELIEVE THE CONSULTANT FROM THEIR RESPOSIBILITIES
TOWARDS CORRECTNESS, SOUNDNESS AND
STRENGTH OF THE STRUCTURE
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
G1
CONNECTION BET'N WEB BOTTOM SPLICE PLAN
AND FLANGE PLATE
CONSTRUCTION OF 2-LANE ROB AND ITS APPROACHES IN LIEU OF
EXISTING ROBAT NHAIKM 266.813 OF NH8A (NH-27) AND RLY. KM. 706/8-9
BOTTOM PLAN BETWEEN STATION MALB-WDHR.
NAME OF ROAD: NH8A (NH-27) MORBI-SAMKHYALI.
TO MORBI TO SAMAKHIYALI
C/L OF E.J. C/L OF E.J.
C/L OF BEARING C/L OF BEARING DY. CE (CONSTRUCTION) -III AHMEDABAD WESTERN RAILWAY
C/L OF GIRDER
DETAILS OF MAIN GIRDER, BOTTOM BRACING, SPLICE
B A AND STUD SHEAR CONNECTOR ( FOR SPAN
31.500M. C/C OF EXP. JOINT.)
WESTERN RAILWAY
DIVISION : AHMEDABAD SECTION :
A
ELEVATION FOR G1
B
C/L OF E.J.
C/L OF E.J.
C/L OF BEARING
C/L OF GIRDER C/L OF BEARING
BOTTOM LAT. BRACING WITH BENT GUSSET ON EITHER END COMPLET BENT BOTT. LAT. BRACING GUSSET
X-SECTIONAL ELEVATION ALONG CENTER LINE
SECTION B-B
ROB - MALIYA 706 - RLY - SS- 04A 1/1
CAMBER DIAGRAM
AS SHOWN DEC-2021 R0
NOTES :
G7
G6
G5
G4
G3
G2
C/L OF GIRDER
TO MORBI
ELEVATION FOR G4
C/L OF E.J. TO SAMAKHIYALI C/L OF E.J.
C/L OF BEARING C/L OF BEARING
C/L OF GIRDER B
A
CARRIAGE WAY
C/L OF SYMMETRY
G7
G5 G6
G3 G4
G1 G2
TYP. END CROSS GIRDER CONSTRUCTION OF 2-LANE ROB AND ITS APPROACHES IN LIEU OF
EXISTING ROBAT NHAIKM 266.813 OF NH8A (NH-27) AND RLY. KM. 706/8-9
BETWEEN STATION MALB-WDHR.
NAME OF ROAD: NH8A (NH-27) MORBI-SAMKHYALI.
17000 (SQ) 20139(SK)TOTAL WIDTH OF BRIDGE Multi Media Consultants Pvt. Ltd.
401, Shivalik Shilp, Iskcon Cross Road, S.G. Highway,
Ahmedabad - 380 054.
WESTERN RAILWAY
DIVISION : AHMEDABAD SECTION :
CARRIAGE WAY
C/L OF SYMMETRY
A
G6
G4
G3
G2
G1
CONSTRUCTION OF 2-LANE ROB AND ITS APPROACHES IN LIEU OF
EXISTING ROBAT NHAIKM 266.813 OF NH8A (NH-27) AND RLY. KM. 699/2-3
BETWEEN STATION MALB-WDHR.
NAME OF ROAD: NH8A (NH-27) MORBI-SAMKHYALI.
SPAN: 2X30.00 M STEEL COMPOSITE GIRDER.
SCHEDULE OF REINFORCEMENT (TMT Fe:500D GRADE REIN.) RC DETAILS OF DECK SLAB, CRASH BARRIER FOR
(31.800 M. SPAN C/C OF EXPANSION JOINT)
WESTERN RAILWAY
DIVISION : AHMEDABAD SECTION :
DECK SLAB
C/L OF SYMMETRY
CRASH BARRIER
PARAPET
DRG. NO. DY.CE(C)III/ ADI/ 648 /D-ROB 706 VG-SIOB