CADASTRAL SURVEY together with leveling, shall determine the positions

of control points between stations of geodetic


DEFINITIONS accuracy over an area of limited extent
Sec 5. DAO 2007-29:
Cadastral surveys – refers to the survey made to WHO WILL ISSUE SURVEY ORDER?
determine the metes and bounds of all parcels Sec 16. DAO 2007-29
within an entire municipality or city for land LMB Director
registration and other purposes. – issue SO for PBS inv. 2 or more province of
a. NUMERICAL CADASTRE – shall refer to a different region with dispute
cadastral survey wherein bearings and
distance of the individual lots are REGIONAL EXECUTED DIRECTOR (RED)
determined from computations based on – issues SO for cadastral surveys
actual ground survey. – issues SO for PBS no dispute
b. GRAPHICAL CADASTRE – shall refer to
cadastral survey where bearing and RTD for LANDS
distance of individual lots are determined – issues SO for PLS
using transit and stadia, scaling from photo – issues SO for PBS if involved are brgy of same
map, and other graphical method. municipality
c. PUBLIC LAND SUBDIVISION – shall refer
to the subdivision of A&D lands covering an CADASTRAL SURVEY ACCURACY
area of more than 1,500 has. Sec 29. DAO 2007-29
a. Establishment of Project Controls and PBS
Cadastral Map – a map made as a result of a (municipal) – 3rd order (Primary control)
cadastral survey, drawn to appropriate scale accuracy.
(1:4000 (whole, no sec; 1’), 1:2000 (sec 1; 30”), b. Barangay boundary survey – 4th order
1:1000 (sec 1-A; 15”), 1:500 (sec 1-A-NW; 7.5”), (Secondary Control)
1:250 (sec 1-A-NW-1; 3.75”)) c. Lot survey – the std accuracy of traverse
closure shall be in accord with Tertiary
Cadastre – set of records about parcels of lands control survey requirements.
consisting of a spatial ref, area, claimant, value,
use of land. Primarily for taxation purposes. Project control survey returns, and complete
cadastral survey returns shall be submitted to the
GNSS – standard generic term for satellite LMS (regional offices of LMB) for verification and
navigation system that provides autonomous geo- approval by the RTD for Lands.
spatial positioning with global coverage. Ex. GPS,
Beidou, GLONASS, DMC 2010-13
Sec 53
Parcel Information Sheet – refers to a document STAGES OF CADASTRAL SURVEY
recording the boundary adjudication agreement by a. Project control survey – establishment of
all concerned and participating claimants. main and subsidiary control (BLLM)
b. Political boundary survey – establishment of
Projection map – a map where all lots subject for political boundary monuments (PBM, CBM,
verification and approval are plotted to determine MBM, BBM) defining boundary lines of
cases of overlaps with previously approved plans. entire municipality.
c. Lot survey – determination of individual lot
Sec 3. DAO 1998-12: boundaries for acquiring title thereto. Other
Cadastral land survey shall comprise all surveys of lands which are not subjected to private
extensive areas of several lots for cadastral ownership are also included in the lot
registration proceedings, agricultural development, survey and issued a cadastral lot number. In
or for any purposes; pursuant to act 2259 amd, act cadastral map and list of claimants, they are
3240 amd, act 3327 amd, sec 1850 of act 2711 identified as forestland, reservations,
amd, ca 141 amd. protected areas, government centers, etc.
(PS)
Sec 114 DAO 1998-12
Project control survey – shall consist of traverse, Sec 54. All cad survey projects shall be conducted
triangulation or any combination thereof, which in PRS 92
Sec 55.DAO 2008-14 shall apply to the awarding of 3. Equipment complements
survey project. SO is issued by RED upon reco by 4. Project duration
RBAC headed by RTD for LANDS. Technical plan
1. Estimated boundary sketch of the project
Sec 56. Cadastral survey project number shall be using NAMRIA topographic map. This will
issued by LMB be use as a base map
2. Estimated number of control points
Sec 57. SURVEY INSTRUMENT TO BE USED 3. Estimated area of municipality and
a. Project control and Municipal Boundary component brgy
survey – any of the ffg: 4. Estimated number of lots
1. Conventional surveying instruments
2. Aerial photogrammetric instrument Sec 62. SCHEME OF WORK
3. GNSS receiver 1. Preliminary activities
4. Smart stations a. Organization of cadastral survey party,
b. Brgy Boundary survey and Lot survey – prep and submission of CSMP
ETS is sufficient b. Posting and distribution of general public
notice
Sec 58. 3 MAJOR COMPONENT OF c. Inauguration of the project
CADASTRAL SURVEY PARTY d. Data research and information drive
1. Project main office – for general supervision 2. Manufacturing of std concrete reference and
2. Office operations – for data research, corner monuments
computations, and cartographic activities 3. Reconnaissance and location of the main
3. Field operations – for reconnaissance, and subsidiary control lines
monument setting, observations 4. Monument setting of project control station
a. Survey control team to lot survey team and running preliminary survey:
b. Reconnaissance and monument a. Esti position of the stations shall be
recovery team to political boundary determined using single measurement
survey team from the ETS.
c. Monu setting team to two groups: 1. b. Ref points of the monuments shall be
Political boundary monuments setting located.
team and 2. Lot corner monument 5. Prep of the progress and project control
setting team
map
6. GNSS obs to esta base meridian. Conduct
Sec 59. List of approved surveys, surveys filed for
reg, shall be collated as reference data. project control surveys
7. Prep and submission of project control
Sec 60. For all ongoing isolated surveys within survey returns for verification and approval
cadastral project: 8. Setting of monuments of political boundary
a. Within 60 days from date of order, GE shall (brgy and muni)
submit to the chief a list of his ongoing 9. Distribution of individual notice to the lot
survey within the cadastral project. claimants for the conduct of Boundary
b. Field notes, computations, and sketch plans Agreement Process (BAP) informing them
shall be submitted to LMS for verification to appear on the ground on the sched date
thru the chief within 4 months from date of of monument setting and sketching of lots to
inauguration of project present their muniments of title
c. Late submissions shall be accompanied by
10. Reconstruction and projection of old
explanations
d. Upon issuance of order, the CENRO will no surveys
longer issue a survey authority 11. prep of sketch map and plotting of previous
surveys
Sec 61. CSMP – shall include the project mngmt 12. conduct of BAP, sketching, monument
plan and technical plan. setting, and signing of Parcel Information
Sheet (PIS)
Project management plan includes: 13. upon approval of Project control survey,
1. Cadastral survey party Political boundary survey will follow
2. Financial plan
14. plotting and locating in project control and project also governs the project control survey
progress map the areas in dispute bet brgy, under the said project.
muni, provinces
15. issuance of 30 day notice to give chance to In public land subdivisions, the RTD for Lands is
claimants who failed to appear on the day of the one issuing the SO.
lot sketching and monu setting In case the project control is independent, meaning,
16. prep and submission of political boundary it is not conducted for the purpose of establishing
survey returns for verification and approval control for the survey project, the one who will issue
17. upon expiration of 30 day notice, lot survey a SO will be the RED and the project area shall be
shall commence based on the recommendations of the RTD for
18. plotting in cadastral map the corners as Lands.
located from control station. Transformation For geodetic control surveys, NAMRIA issues SO,
of previously approved survey to RED recommends project area.
PPCS/Grid-PRS92 system
19. numbering of lot corners. Lot data Sec 31. The survey control team shall be the said
computation shall be prepared team of the project.
20. tracing and validating cadastral map in the If the project control survey is independent, the
field survey party are:
21. posting of preliminary cadastral map 1. Project main office – for general supervision
22. final checking to verify discrepancies. 2. Office operations – for data research,
23. Completion and inking of progress map and computations, and cartographic activities
cad map 3. Field operations – for reconnaissance,
24. Prep of the bgry/case bdry of the index map monument setting, observations
25. Prep of the muni/proj bdry and index map a. Survey control team
26. Completion of the survey returns of the b. Reconnaissance and monument
project and submission for verification and recovery team
approval c. Monu setting team
It shall be the function of the LMS Survey Team. If
Sec 63. SURVEY NOTIFICATION the LMS Survey Team is not available, the project
General notice – posted in barangay and municipal may be done through a contract with a private GE
building pursuant to RA 9184
Lot claimant’s notice – at least 2 weeks before start
of lot sketching and monument setting of lots. Sec 32. Project control work plan
It is included in the survey projects where it is a
Sec 64. CADASTRAL PROJECT CONTROL component.
SURVEY (sec 29-52) For ex. The CSMP of the cadastral survey project.
Sec 29. Project control surveys shall be conducted
in order to establish set of reference points (BLLM) If the project control is independent:
for a survey project (cadastral, Pls, Ts, Gss) Project management plan includes:
belonging to primary, secondary and tertiary 1. Project control survey party
control. 2. Financial plan
3. Equipment complement
Survey instruments to be used: 4. Project duration
a. ETS, GNSS receiver, or combination Technical plan
1. Estimated boundary sketch of the project
b. If ETS, by traverse or triangulation referred
using NAMRIA topographic map. This will
from PRS 92 monument.
be use as a base map
2. Estimated number of control points
Sec 30. The survey order of the survey projects 3. Proposed leveling measurement activities
shall cover the project control survey.
For ex. In cadastral survey projects, the RED RTD for lands approve the project control work plan
issues SO. The SO issued by RED in cad survey
Sec 33. Data research and old monument inventory
The individual status of reference points or Secondary control: variable (each brgy shall
previously established Geodetic control and project have at least 2 control pt not more than 2km
control network adjacent or within the project area apart)
shall be researched, evaluated, and verified on the when using ETS:
ground. sec 28.b DAO 2007-29
Their corresponding Geographic Position and Traverse: P-100m-1000; S-100m-500m;T-Ar
Plane coordinates (GPPC), both in local and in the Triang: P-1-3km; S-1km; T-consis. w/ gd
Philippine Plane Coordinate System (PPCS), shall sght
be determined. b. Designing network of control
Only stable and undisturbed control shall be When using GNSS receiver:
considered. Intervisibility of stations are not necessary.
Established PRS 92 control validated and approved What matters is that it can be occupied, in
by NAMRIA shall also be included. stable ground, shall not be affected by any
construction activities in the future.
The following shall be collected to be used as Following shall be considered:
reference data: 1. Terrain and physiographic features
1. Projection Maps showing previous surveys 2. Availability of old geodetic control
2. Copy of plans and computations of previous 3. Number of GNSS receiver. At least 3
surveys receivers
3. Last Progress Map of each adjoining survey 4. Appropriate number of length of
projects observation. Depends if single or dual
4. Approved horizontal angle, distance on the frequency type of receiver
primary traverse stations of adjoining 5. For primary controls, min # of obs is 2
projects reco # of obs is 2
5. Approved data on municipal boundaries and
lot corners When using conventional instruments:
1. Terrain and physiographic features
Sec 34. If it is an independent project, the survey 2. Intervisibility of stations
team shall establish a survey office with signboard 3. Min of 2 reference pts (3 is preferred)
60x120 cm in dimensions, in the población of the 4. Network triangles should be equilateral
municipality . 5. Availability of old geodetic and project
Shall be closed upon written notice of RTD for control data. Leveling data from
lands. NAMRIA
6. Max range of instruments to be used
Sec 35. Notification of survey
The following shall be notified: Sec 37. Preparation of map of proj site
1. Provincial Gov thru PEO When using GNSS receivers:
2. PENRO 1. Available NAMRIA topographic map shall be
3. DPWH DEO used as based map
4. CENRO 2. All fixed old controls shall be plotted
5. Municipal mayor thru MEO 3. Points to be esta shall be plotted
6. Head of an agency 4. Caution in scaling. Distance bet pts are
7. Brgy chair necessary
8. Lot owner affected 5. Each station shall be numbered from 1-
3000 esta by NAMRIA and 3001 so forth est
Sec 36. Network design by LMB/LMS and other entities.
a. Reference control – survey shall take-off 6. Network design’s final map may be modified
from an esta PRS 92 control pt to another upon conduct of field reconnaissance
PRS 92 control pt (check base) Using NAMRIA topog map as reference for project
In case of conventional surveying method, site map, the ffg shall be ascertained:
control pts should be intervisible 1. Lines connecting control pts within the
network should create closed polygons,
For the baseline length triangles
when using GNSS receiver: 2. All stations shall have at least 3 known PRS
Primary control: 5 km 92 control pt
3. Should have an adequate amount of During reconnaissance the following shall be
redundancy of measurement over minimum determined:
required (more than 2 observation) 1. Accessibility of proposed locations
4. Schedules for field observations. It should 2. Ground stability
be timed when PDOP is low, which 3. The best route
indicates a higher probability of accuracy. 4. Proximity of radio station towers and
presence of any obstructions above
When using conventional method: 15degrees of the horizon
1. Available NAMRIA topog map is used as 5. Esti travel time bet stations
base map 6. Actual number of old control points and their
2. Shall show all proposed control pts status
numbered consecutively starting from 1. 7. Private property owners where survey
Each has a unique iden code number stations are proposed to be established
3. Caution in scaling. Distance bet pts are 8. No vertical structures that will effect
important intervisibility
4. All main control points proposed in survey 9. LOS is not obstructed by vehicles in busy
projects, shall be conducted in primary streets
accuracy and designated as BLLM. First 10. General condition of atmosphere, it should
primary control point is BLLLM 1. Second not affect the electronic measuring
primary control point is BLLLM 2. capability of ETS
5. Main control shall start from PRS 92 and
ends at another PRS 92 control point. Sec 39. Project control monument
6. When no BLLM have been previously BLLM should be in square base frustum that has a
established, a pair of BLLM numbered 1 and dimensions of:
2 shall be esta
7. Points to be esta shall be approx. plotted on Top cross section : 25x25
the map Bottom cross section: 35x35
8. All fixed old control shall be plotted. At least Length: 120 cm
3 2nd order or 3rd order geodetic control shall Above ground: 20 cm
be included in the network Below ground: 100 cm
9. When main control includes est geodetic Reinforced by steel bar 10 mm in dia for vertical bar
control, it shall be divided into loops, where And 8 mm for ties
each loop shall start from one geodetic Class A concrete In ratio 1c:2s:4g
control closes to another
10. Main controls shall follow the project Sec 40. Markings of ref monu/BLLM
boundary. If the place is rugged, it shall be Marked on top with
placed near the bdry 1. Municipality
11. In case of mountain peak bdry, primary 2. Bllm #
control shall be located at the base of the 3. Project #
mountain, if base is rugged, along the 4. Office funded the project
existing road lines as near as possible to the 5. Year established
bdry
12. Additional pairs of BLLM shall be established # of control point shall be coordinated with LMS
along main control. At interval of 5 km. or at regional office
least a pair for every brgy. Whichever is Cadastral Project # shall be coordinated with LMB,
shorter. Numbered as BLLM 3 4 5 and so on. other large projects such as Pls, Gss, Sgs, Ts shall
13. No lots shall be more than 1km form nearest be coordinated with LMS
BLLM
Sec 41. Location for est of ref pts
Sec 38. Reconnaissance is needed in order to 1. Identifiable and easy to find
determine if there is a need to amend the proposed 2. Stable ground
locations of control points plotted on the network 3. Safe distance from road
design to achieve a rigid geometric figure. 4. Nature of soil
Reconnaissance shall finalize the preliminary 5. Priority area should be government owned
network design. land
Sec 42. Control pts should be identified by its Use Dual freq: if no limitation in baseline length
complete geographic position. Expressed in lat, : static, rapid static, kinematic, RTK mode
long, and elev of positioning
The following shall be recorded for every est monu
1. General location wrt island, province, dist Specification of ETS equipment
and dir from larger towns or well-known 1. Telescope shall have an erect image and a
features. magnifying power of not less than 30
2. Loc with resp to local features diameter. Minimum focus distance be at
3. Land ownership least 1.3 meters
4. Direction for reaching the sta 2. Hori and verti circle have at least reading of
5. Detailed loc with res to roads, fence lines, 1” of arc on the centesimal units displayed
buildings on liquid crystal display (LCD) or light
6. Vicinity and detailed sketch of monu emitting diodes (LED). Angular units may be
7. Desc of monu dim and inscription in sexagesimal or centesimal system
3. Measuring range of at least 1,000 m when
Sec 43. Specification of GNSS and ETS ins to be using 1 prism. Max range at least 5,000 m
used: using 3 prism.
Specifications of GNSS ins: 4. Accuracy of at least +/- 5mm+5ppm
1. Field test for survey accuracy for issuance probable error and within temp range of -
of cert shall be done only upon presentation 15deg to 40deg Celsius
of at least a pair (2 units) of GPS receiver: 1 5. Should have measuring range read-out up
base 1 rover for differential (simul) obs. to 1mm on fine measurement mode and up
2. The receiver, either single (L1 C/A code) or to 10 mm on coarse or tracking mode
dual (L1/L2 P-code) freq shall have min 6. Provided with automatic or manually
accuracy: inputted correction for meteorological or
a. At static survey: atmospheric conditions, earth curvature,
Horizontal : 5mm+1 ppm x baseline refraction, and reflector constant including
length cyclic error
Vertical : 10mm +1 ppm x baseline 7. With a circular bubble (sensitivity of 10’ per
length 2mm) and a plate bubble (sensitivity of 30”
per 2 mm). provided with automatic
b. At kinematic survey: compensator for tilt correction
Horizontal : 20mm+1 ppm x baseline 8. With optical plummet and point guide or
length optical sighting device.
Vertical : 20mm +1 ppm x baseline
length Sec 44. Instrument preparation before going to
field:
3. Must be survey grade receiver and dual freq For GNSS instrument:
for 1st and 2nd order, and single for 3rd and 4th 1. No mixing of different receiver type (if
order single/dual) and model
4. Capable of receiving signals from diff sat 2. Fully charge battery. Receivers should not
system (GPS, GLONASS, Galileo, etc) be powered down not even for seconds
5. Capable of traking at least 4 sat with good 3. Ensure memory has enough space
geometry 4. Ensure receiver settings such as elevation
6. Capable of obtaining carrier phase (P-code) mask, synchronous rates, observation
observable not just C/A code types, etc. are the same for all types of
7. Position is expressed in Long, Lat, and alt receivers.
8. Capable of obs and logging at common For ETS instruments:
times 1. Battery should be fully charged
9. Capable of achieving precision of 1ppm to 2. Ensure memory has enough space
0.1 ppm 3. Equipment shall be checked for Prism off-
Types of GNSS receivers to be used shall depend center constant: 0 to +/- 30 mm.
on baseline length and mode of positioning: 4. Prism should have separate tripod
Use Single freq: if up to 10 km in baseline length 5. Partial testing/calibration over esti calib
: and survey is limited to static mode of base if ins has not been used in 6 months. If
positioning discrepancy is noted as larger than the
prescribed allowable linear error (5cm per 9. Each point shall have min of 2 independent
km) for 3rd order under sec 28, dao 2007-29, observation
then a full testing/calib may be necessary. 10. Each independent observation shall be of
different antenna height
Sec 45.conduct of project control survey 11. To ensure diff satellite geometry while
For GNSS instruments conducting independent obs on same day,
1. Receivers center must be exactly over the time difference between obs should be at
center of the monument which is brass or least 1 hour.
steel bar 12. During recording session, shall take note
2. Observer shall follow the amount of warm- the GDOP, which indicates geometric
up time strength of the 4 satellites, lower GDOP the
3. Properly connected to the power source. better
4. Antenna height measured in nearest MM. at 13. While collecting data, use of electronic
least 2 member shall be assigned to devices within 10 meters from gps receiver
measure the antenna height, separately. should be avoided.
Antenna should be centered at station in
nearest MM. all should be oriented to the
north. Observer should indicate where the For ETS instruments
antenna height meas was taken. Meas 1. Based on the network design, det the route.
should be taken before and after. 2. Occupy the first monu, with tripod approc
5. Height, station name, serial number, above the center of the mark of said monu
antenna model, and start and stop time 3. Each primary line shall be measured 10
shall be recorded. times and must have a rejection limit of not
6. Observation shall begin after the inst is greater than 0.005 meter from the mean.
logging data when turned on
7. Minimum of 4 satellites shall be observed Sec 46. Distances of primary control lines that
with the following time: cannot be directly measured shall be indirectly det
a. For static mode: by TRIANGULATION
 Single freq a. The position of triangulation station
– if 0-5km Baseline: min of 1 hr, 2 shall be selected so that, no angle
session, at least 30 min bet sessions may be less than 30 degrees.
– if 5-10 km baseline: min of 2 hrs, 2 b. Whenever possible, a scheme of
session, at least 30 min bet quadrilateral shall be established.
sessions. Angles bet diagonals and sides of
 Dual freq the quadrilateral shall be measured.
– if 10-20 km: 1.5 hrs c. At least 2 baseline shall be
– if 20-30 km: 2 hrs measured.
– if 30-50 km: 3 hrs Sec 47. When using both GNSS and ETS
– if 50-150 km: 4 hrs 1. The network design shall reflect the ins’s
mode in every control station.
b. For rapid/fast static mode: 2. Strength of figure shall be the primary
If Up to 5 kms baseline consideration .
4 satellites: 20 min 3. There shall be no mixing of ins in a polygon,
5 satellites: 15 min except to determine the coordinate of the
6 or more satellites: 10 min staring point, loop started with ETS shall be
finished by ETS.
If up to 5-10 kms Sec 48. The geographic position of BLLM 1 shall be
4 satellites: 35 min derived from the 2nd and 3rd order geodetic control.
5 satellites: 25 min In absence of 2nd and 3rd within 10 km dist from
6 or more satellites: 20 min project bdry, connection shall be made to any ref
certified by LMB. These ref shall be transformed
8. To achieve into PRS 92 if not in PRS 92.
1st order: min of 3 obs, reco 4 or more
2nd order: min of 2, reco 3 or more Sec 49.
3rd order: min 2, reco 2 Sec 50-52.
Sec 65. POLITICAL BOUNDARY SURVEY Sec 72. Political boundary monuments is in square
a. Determine the exact coverage of base frustum
project/municipality MBM – 50 above ground; 70 below ground; 25x25
b. Det exact location of lots top cross; 35x35 bottom cross
BBM – 30 above ground; 70 above ground; 20x20
Sec 66. SO issued by RED in conduct of cadastral top cross; 35x35 bottom cross
project shall cover this.
If independent, the LGU shall hire a GE. The LGU Sec 73. Markings –
shall submit a resolution of the local council. If the PBS is conducted under a cadastral project,
Issuing agency for SO is the RTD for lands. LMB the cadastral project number shall be indicated
DIRECTOR if PBS with dispute, RED if PBS is with Inscribed also is the province, municipality. Except
no dispute. if it is a CBM, province is not inscribed.
In case a BBM is common to two or more brgy, the
Sec 67. monu number for each brgy and name of brgy is
Sec 68. Survey team shall be the political boundary chiseled in the face of monu such that when
survey team of the cad survey. reading the marker, person is also facing towards
If independent, direction of the brgy.
1. Project main office – for general supervision Corners already defined by the PBM, shall be given
2. Office operations – for data research, its equivalent MBM and BBM number without
computations, and cartographic activities altering the monu old inscription. It shall be
3. Field operations – for reconnaissance, indicated on the sketches
monument setting, observations All letters and numbers must be in arial bold
a. political boundary survey team
b. Reconnaissance and monument recovery Sec 74.
team 1. PBM shall be est at every prominent turn
c. Monu setting team and where they cross roads and streams.
2. Where said bdry lines follow roads, streams
sec 69. The work plan shall be included in the and other natural features, a monu shall be
CSMP. placed near their junction pts
If independent, it shall not be required to submit a 3. Intermediate pts along said roads need not
work plan. However, docs like survey authority, be placed with monuments but 2 witness
LGU council resolution, availability of funds, and monuments will do.
others are required. 4. Bdry interval shall not be more than 1km
except when it crosses forest lands, not
Sec 70. Preliminary data to be used as reference: more than 5 km.
1. Laws or EO creating the municipality. 5. Bdry defined by law or eo shall be located
2. Torrens titles of lots issued in the as well as those claimed by the municipality
municipality 6. All corners accepted as common by the
3. Approved surveys in the municipality, LGUs shall be defined by monuments
especially those covering large tract of 7. No attempt shall be made to settle conflicts
lands like Pls, Gss, Mr, Ts, during conduct of survey.
4. Approved CLUP Sec 75. In case of bdry disputes,
5. Existing municipality tax map 1. The corner shall be temporarily defined by
6. NAMRIA topo map hard wood post or monuments with dia of at
7. LC map from NAMRIA of Bureau of forestry least 10 cm. and 2 m length. 50 cm below
8. Maps from government agencies ground
9. NAMRIA admin map 2. Dispute area shall be drawn on sketch and
10. Basemaps produced by organizations which report shall be forwarded to the RTD for
is of acknowledged standard Lands
3. One LGU claim indicated by heavy dashed
Sec 71. Presurvey conference at least 1 month line
before start of survey headed by RED asst by RTD 4. Other LGU claim indicated by heavy dotted
for Lands. All local chief executives, adjacent lines.
municipalities shall be informed. Reference data 5. Heavy full line shall mark division of LGU
shall be discussed indicated by tax declarations.
6. Lot lines indicated by ordinary full lines. It shall be the lot survey team of the survey project.
Divided into subgroups
Sec 76. If dispute is not settled before completion 1. Sketching (BAP and PIS)
of field work of cad project, the disputed area with 2. Manufacturing and monument setting
all lots therein shall be surveyed and treated as 3. Lot survey
separate cadastral case. There shal be LMO from cenro concerned in lot
The said area in dispute when it comes to LMB survey team
land area statistics, shall still be credited to the
LGU occupying it. Until the dispute is settled Sec 79.
amicably, or resolved in the court of law. Sec 80.
After 30 days after SO no GE shall conduct a
CADASTRAL LOT SKETCHING, survey on the project area except when already
MONUMENTING, SURVEY started prior to SO.
Sec 77. Lot survey as part of large survey projects
shall be conducted using TERTIARY PRECISION. LOT SKETCHING AND MONUMENT SETTING
It shall constitute activities such as sketching, Sec 81. Sketching and monument setting – done
monument setting, and lot survey. independently or simultaneously.
Further subdivided into: If separately, the monument setting must follow
1. Data research and survey notifications immediately after sketching, otherwise the
a. Data for planning purposes temporary markers made be the sketching party
b. Research for old survey data may be removed.
c. Prep of sketch base map Lot sketching – the activity is done to gather
d. Prep of survey notif letter information in the field, prepare preliminary maps,
e. Databasing of preliminary list of det est number og lots, which shall serve as a
claimants guide to lot survey team. It may also include
2. Lot sketching information dissemination, issuance of notification
a. Meeting with brgy officials for proper letter.
coordination The following shall be observed:
b. BAP with individual lot claimants. 1. Sketches shall be made using compass and
c. Filling out of PIS steel tape. 100 m in length. Base map to be
d. Actual lot sketching prepared may be on any mapping paper in
3. Manufacture and setting of corner standard size in scale of 1:4000. However,
monuments larger scale may be prepared for lots that
a. Manufacture are too small to be shown on standard scale
b. Hauling 2. Each sketch sheet shall be given cadastral
c. Setting map number
4. Lot survey 3. All approved survey draw in pencil
a. Secure approval of main and 4. All new monument and control shall be
subsidiary control survey inked
b. As well as PBS 5. Sketches shall be made free hand method
c. Lining of traverse stations 6. All lots, unsurveyed or surveyed, titled or
d. Lot survey untitled, patented, leased or decreed, shall
e. Posting of 30-day notif to give be reflected on the sketch sheet
chance to claimants 7. All corner marker shall be located and
f. Final list of claimants definitely identified as original monument
g. Final lot lines connections 8. All lots, titled or not, shall be subject to BAP
h. Correction work 9. All corners sketched shall be marked
5. Final lot data computation and SR temporarily by stakes in presence of
Some may be done simultaneously. claimants.
- Data gathering and research of old survey, 10. In case in dispute, the disputed area shall
manufacturing. Posting od public notice be sketched as separate lot. It will only be
Some are pre-requisites of others marked with monu upon verification and
- BAP before lot sketching before monu approval of survey
setting before lot survey 11. Lot corners, marks and bdry shall be
indicated on the sketch. Trees shall be
Sec 78. Organization of survey party.
marked on the side opposite the lot in which a. Written authority from RTD for Land
they are claimed b. If subject to land case, an order from
12. Natural and man made features shall be RTC
plotted and their local name 5. In case approved survey not marked with
13. Name of muni, cad survey number, scale, monu, the monu shall be relocated and
and sketch sheet number shall be shown in marked
ink and on the lower right hand border 6. Portions of surveyed lots which now form
14. Corners shall be numbered consecutively in part of river, estero, arroyo, creek, shall be
clockwise direction sketch and later surveyed as separate lots
15. No single lot shall be in more than one muni and indicated as such in cadastral map
or brgy
16. Cadastral project area shall be divided in SKETCHING AND MONUMENT SETTING IN
cadastral cases. One brgy one case. Lots PUBLIC WORKS
shall be numbered in each cadastral Sec 83. Claims traversing these features (roads,
case/brgy railways, manmade canals etc) shall not be
17. Extent of public land shall be determined allowed. The sketch team shall reflect the road
18. In case private claims extend beyond limit of network, ROW, facilities and other improvement in
cultivation, investigation shall be made to the sketch map.
det the nature of claim 1. Portion of lots which fall within ROW as det
19. Claimants of a n d public lands shall be by district, ME shall be sketched and
advised to file the appropriate public land numbered separate lots when claimed as
application. private property. Such claims however,
should be discouraged.
Monument setting – includes manu, hauling, actual 2. The owners of land adjoining public
setting of monument on ground highways or street shall be advised of the
1. All corners shall be marked with monu min ROW meas from lot line to lot line for
2. All corners not possible to be marked shall that particular street.
be marked: 3. In view of ROW the ffg shall be consulted on
3. In case 1 and 2 is still unavailable, at least 2 the width and center line of road, railway,
witness monument located as near as ROW
possible to the true corner. Ex. along both a. District enginerer of the DPWH on
side of road along river banks existing and proposed public
4. Public land claims inspection has been highways
made and approved, shall be marked with b. Sangguniang bayan or brgy on the
mon municipal and brgy roads
c. LGU PDO on the roadways within
SKETCHING AND MONUMENT SETTING OF residential subdivisions
TITLED OR PREVIOUSLY APPROVED d. Railway company on railroad ROW
PROPERTIES 4. ROW of highway and railroad shall be
Sec 82. All properties covered by approved survey marked with monument as follows:
titled or not, shall be reflected on map. a. The PC and pt
1. Sketch men shall compare plan with the b. Points on the curve need not be
actual bdry on ground marked except if desired by owners.
2. In case there is a difference, the Position of pts along curve shall be
encroached area may be accepted provided det by computation using the
the adjacent owner agree and is not yet standard metric curve of 20m chord
titled or decreed. The lot as per approved 5. The municipal engineer shall be requested
plan shall be reflected on the /sketch plan to indicate the CL and width of all streets
which shall be later on adjusted accordingly and roads within their jurisdiction
in cadastral survey 6. The district engineer shall be notified before
3. Claims inside an approved survey but not sketching and monument setting on the
yet titled shall be sketched as separate lots. areas along provincial roads.
Claims inside titled lands shall be 7. If lot is along railways, the railway com shall
disregarded also be notified.
4. In case of lease untitled properties, the 8. If claimant insists of claiming a portion of
adverse claim must be supported by : ROW, the area claimed by him/her shall be
surveyed separately but monu shall be set c. The boundary line shall be the
only upon ROW line. shoreline which is the line reached
by the highest equinoctial tide.
SKETCHING AND MONUMENT SETTING OF d. Lands bordering SGBP shall be subj
LOTS THAT INDLUDES OR ADJACENT TO to easement of SALVAGE ZONE of
NATURAL FEATURES 20 m from shore line. Need not be
indicated in plan if within 40 m bank
Sec 84. Shall take into consideration the provisions protection of a forestland
of RA 1273, PD 705, and DAO 13-1992 e. Easement of coast police which is
The ffg shall be considered in sketching and the obligation to leave ROW 6m
monument setting of lots that include or adjoins wide within salvage zone.
natural features: 7. Buffer zone bet lots and natural boundaries
1. In case of doubt in classifying of stream as declared as sanctuary, protected,
arroyo, estero, creek or river, the local name ecologically critical, shall be sketched and
shall determine its classification established in the ground in the ffg manner:
2. If the adjoining AER 5 m or less in width, the a. 20m strip of land along edge of
claimant of opposite bank shall be indicated normal high waterline on RS with
in the sketch plan channels 5m wide/ less than 5m
3. If the AER 5 m or less in width but wide if water flow is continuous.
navigable, the claimant of opposite bank b. 50m strip of land fronting the sea
shall also be indicated on such plans that has mangrove forest. 20m on
4. Plans of tract of lands adjoining AERCI, both sides or RS that has mangrove
shall indicate: plantation
a. Width of WB c. In storm-prone areas, mangrove
b. Navigable or not forest strip 100m wide inward along
c. Lot is on right or left when facing shoreline fronting seas, 50m strip
downstream river bank protection.
d. Flow of water by arrow d. 20m strip of land outside bdry and
e. Dist in meter from bank to lot line immediately adjacent to designated
5. Along lake shores, all private claims bdry protected areas.
line shall be sketched up to high water mark e. 20m strip of land adj CBFMP
at greatest depth of water f. 20m along bdry or reforestation proj
adjacent to private/alienable or
The sketch plan shall show and indicate properly disposable land
the ffg: g. A buffer zone about 100m of residual
1. Stream 5m or more in width forest surrounding the old growth
2. Stream less than 5m in width but water forest stands.
flows continuously. Dir of flow
3. Irrigation ditches or canal BAP AND PIS
4. A strip of 40m wide from bank on each side Sec 85. BAP is a formal process which aims to
of RS obtain a graphical representation of the parcel to be
5. The following strips along edge of WB shall surveyed and document the agreement of parcel
serve as easement of public use boundaries by adj land owners in all original,
a. Urban area: 3 m cadastral, and other large survey projects.
b. Agricultural area: 20 m - Part of systematic adjudication activities
c. Forested areas: 40 m where land claimants, adj owners, brgy rep,
6. For lands bordering sea or its arms: survey team, denr rep(lmo from cenro,
a. Foreshore lands shall be sketched survey verifier from lms) participate in bap
as separate cad lot. which shall result to accom of PIS
b. Corners that fall into sea shall not be - PIS is a document to be prep during lot
marked with monument, but a sketching and prior to land survey, recording
witness monument shall be the boundary agreement by all concerned to
established along shoreline at low a public land, indicating on it the bdry of
tide. Using concrete monu, each parcel, its improvements, marks and
galvanized iron spikes, fixed rock, occupations
boulders, wooden post PIS shall be:
- Accomplished in legal size 80gsm 6. Road, ponds,streams, etc. within previously
substance 20 approved survey shall be located, assigned
- All entries shall be neat and legible in separate cadastral lot number, and
permanent black ink identified as road, ponds, streams, etc.
- All spaces must be filled with relevant
information STANDARD MONUMENTS AND OTHER
- Names and lot number of adj cl shall be ACCEPTABLE LOT CORNER MARKERS
indicated Sec 87. Monuments of permanent nature used in
- Name of signatories printed defining corners of lot, titled or to be subj to admin
- Rep shall have written authority and judicial titling:
Sketching instructions: 1. Standard monument – concrete and
1. Show bdry length inside and along bdry line cylindrical, 15cm dia, 50 cm long, 15 cm
in bolder number in clockwise direction above ground, 35 cm below ground.
2. All directions shall be oriented along the 2. If the loc of lot corner cannot be placed with
north-south line using a magnetic compass standard concrete monument, due to
3. All easement must be shown building, wall, tree, etc. the ffg shall be
4. All waterways, indicating width and flow dir accepted as corner marker:
5. Political boundary lines, name of adj muni a. Concrete post part of fence not less
and brgy than 10cm dia/ metal pipes not less
6. Info common to two lots than 2cm in dia
7. Title number if any b. Living edible fruit tree not less than
8. All physical and natural features 15 cm in dia or trees in first group
9. Road with width with dia not less than 15cm
10. Lot number c. Points of masonry or concrete wall
11. Adj lot number or name of claimant if no lot d. Immovable hard rock exposed surf
number of more than 1m in dia
12. Indicate land use classification- residential, e. Peg 50mm square for at least 100
commercial, industrial, institutional, mm from top and nlt 400 mm in
agricultural, reservation, forestland, etc. length.
Sec 88. Conditions to accept other corner markers:
Procedure: 1. Acceptable living trees, shall be blazed at
1. One will place marker, witnessed by other about 20cm above ground. Blaze shall be at
2. Measure distance of bdry line least 10 cm. a cross is chiseled.
3. Measure offsets and chainage for reference 2. Wooden post or narra, ipil, molave, yacal, of
marks nlt 15 cm in dia forming part of a
4. Complete sketch of land parcel house/fence may be a corner marker
5. Assignment of land parcel by GE 3. When concrete post, masonry, walls, rock,
6. Complete all entries on PIS form are used, the corner shall be defined by a
7. Signaturea on survey information sheet galvanized iron spike driven into the
8. 30 day period to present their evidence that structure. Or cross if not possible.
will support their claim 4. When metal pipes, such pipes shall be filled
with concrete
Sec 86. Precautions in sketching activities 5. When a cross is used, such mark shall be
1. Sketches must be prep with care. Spelling chiseled toa depth of at least 5 mm. arms
of all proper names. Lots occ by gov and be in 5cm long from pt of intersection.
private companies shall be properly
identified in their full name Sec 89. Construction of lot corner monu
2. No single lot fall in more than one brgy 1. Class A concrete speci in ratio 1:2:4 csg
3. Claims inside patented/decreed property 2. Top shall be centered by galvanized iron
shall be disregarded unless supported by spike or conical hole not exceeding 2cm in
RTC order dia and not less than 1cm in depth. It shall
4. In case dispute, party shall not side or be marked by CAD
intervene with one of the parties. 3. Galvanized iron spike used shall be at least
5. Mandatory areas for exclusions from lots 1 cm in dia and 8cm long
adjoining public works and bodies of water
shall be properly plotted on the sketch map. INDIVIDUAL LOT SURVEY
Sec 90. Shall only be conducted after 30 day a. When overlapping is bet surveys not
posting of the PIS. yet titled, the area in conflict shall be
made as separate cad lot
Sec 91. At least tertiary precision, using ETS or b. When overlap is bet titled prop, the
GNSS area conflict shall also be made as
1. Traverses shall start from a primary or separate cad lot.
secondary control and close to another c. When overlap bet title and untitled,
primary or secondary control. the latter shall be amended to
2. The chief may add subteams headed by a exclude therefrom the portion in
GE with approval of RTD fro lands conflict, except when there is a court
3. Tertiary stations for each cadastral projects order from RED
shall be numbered consecutively from 1. 1- 5. In case claimant of untitled covered by an
1000 to first GE, 1001-2000 to second GE. approved survey within a cadastral project
And so on. desires subdivision, he shall secure authorit
4. Sketches shall be used in field by party for from RTD for lands for change.
identifying lots and corners 6. Approved survey shall be adopted into
5. Lot corners shall be located by side shots. cadastral system
From nearest trv sta. not more than 1km a. Tie line of approved survey shall be
from ref pts. converted to the cadastral system
6. Corners outside margin of both sketches b. Common pt with previously
shall be included in only one sketch, by a patented, leased, or decreed survey
semi circle in ink to avoid missing corners shall be located
and duplication of work. c. Area in the lease, patent, or title
shall be final
Sec 92. The survey shall cover as much as d. The bearing shall be reduced to cad
possible all lots which where included in the sketch bearing either direct shot from
map and PIS. ground or convergence correction
Sec 94. All lands of public domain shall be
ISOLATED SURVEY WITHIN CADASTRAL surveyed as one lot. Private claim inside
PROJECT unclassified areas shall not be surveyed
Sec 93. Approved surveys
1. In case the lot with approved survey/ titled Sec 95.
and sketched lot differ and owner is claiming Sec 96. All gov lands inside a cadastral projects
additional land, additional area shall be shall be sketched, marked with monu, surveyed
separate cadastral lot. and assigned a cad lot number
2. In case not yet titled but survey, and the
claimant wants to combine the surveyed Sec 97. All patented mineral land within a cadastral
area and additional unsruveyed area in one project shall be surveyed as regular lots. All mineral
cadastral lot, he/she shall be required to land surveys indicated on the cad map by dotted
surrender the approved tracing cloth plan of lines.
the survey together with cert from the ROD
that the land in untitled, RTC or MTC sitting Sec 98. PLS and GSS inside cadastral project.
as cadastral court that the ladn is not a sub 1. The main control of the cadastral project
of any land registration proceeding, and shall traverse the PLS and GSS within the
affidavit requesting RTD FOR LANDS for cadastral project. Recovered BLLM, MBM,
cancellation of the subject plan. BBM shall be made part of the cadastral
3. The ffg shall be surveyed: main control
a. Titled/untitled prop without lot 2. When there is no BLLM, MBM, BBM
description recovered, BLLMS are est
b. Titled/untitled with erroneous or 3. BAP and PIS shall not be applicable inside
missing lot description the are covered by PLS and GSS
c. Titled/untitled with TD from magnetic 4. PLS and GSS plotted in cad map as one big
survey. lot. But the individual lot inside PLS and
4. When overlapping occurs bet previously GSS shall be indicated in cad map by
approved surveys; dotted red line.
ADVANCE SURVEY
Sec 99. AS pertains to the survey and prep of the
SR of cad lots and the verification thereof ahead of
other lots. Made after primary and secondary
control of the project have been completed, verified
and approved.
In conditions:
a. There is a court order for immediate
conduct of survey
b. There is a written authority from
RED upon reco of the RTD for lands
due to urgency for such survey and
applicant is willing to bear the
expenses.

Sec 100.
Sec 101. Once AS authority is granted:
a. Each contested area shall be made
a separate lot
b. After conduct of survey, the survey
returns shall be submitted to the
DENR regional office for verification
and approval.

Article 5. PUBLIC LAND SUBDIVISION PROJECT


Sec 103. Steps in PLS
1. Project control survey
2. Lot survey

Sec 104. PLS which shall cover only AnD lands


shall not be req to conduct PBS.