The grinding process


Control of the grinding process
Operation

Mai 2010

Progress is our tradition


fine product

raw material

hot gas

MPS vertical roller mill


TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
Pneumatic conveying

Mechanical conveying

Classifying

Compression grinding in material bed in


between rollers and table

Drying,
Drying, mixing,
mixing, conveying in fluidized bed above
nozzle ring

09/2001

Processes in MPS vertical roller mill


GEBR. PFEIFFER AG
Max. feed size: 3-5 % dR
Much finer feed may destabilize
material bed

Grinding: Compression of material bed


Gebr. Pfeiffer AG
grinding roller
TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
Aim:
Aim:
Always stable material bed during
compression,
compression, no sudden changes

grinding roller
(water spray)
dam ring
material on table
air flow through nozzle ring

MPS grinding zone


GEBR. PFEIFFER AG
(1) P = Wm x m needed

(2) P = β x FR x z x V introduced in
material bed

Wm spec
spec.. power consumption depending on
material, product fineness,
fineness, (dam ring), (wear
(wear)
wear)
β friction factor depending on material, product
fineness,
fineness, (air
(air volume)
volume)

Grinding force FR to be adapted,


adapted, maximum given by
mechanical design,
design,
number of rollers z and table speed v given by design
Power absorption P during compression of material bed
Gebr. Pfeiffer AG
TP/ Ne- 08 / 04

testing - MPS 40 BC and


wear determination equipment GEBR. PFEIFFER AG
TP/ Ne- 08 / 04

testing - MPS 40 BC
GEBR. PFEIFFER AG
6 1000

Wm mill in kWh/t

mF in kg/h
5 900
kWh/t
4 800

design
3 kg/h 700

2 600
10 11 12 13 14 15 16 17 18 19 20 21 22
R 90µm in %

dustload: < 750 g/m³ in this case

09/2001

Grinding test GEBR. PFEIFFER AG


Industrial MPS-mills with high efficiency classifier SLS,
not limited by heat balance or kiln process

1000
900
800
dust load in g/m³

700
600
500
400
300
MPS-mills with SLS-classifier
200
Mills with competitors' classifier
100
0
4 5 6 7 8 9 10 11 12
spec. power consumption in kWh/t

Dustload (air flow) depending on spec. energy


TP/ Ne- 07 / 05

consumption (grindability) GEBR. PFEIFFER AG


Blaine for OPC, slag cements and slag

residue on sieve from joint grinding


of mixed cements containing
components with good grindability
(e.g. limestone, puzzolana)

determination of the product fineness :


TP/ Ne- 07 / 05

specific surface (Blaine) / sieve method GEBR. PFEIFFER AG


drive Check of gap
fine product between rotor and
static classifyer
part

feed material

rotor

louver

Adjustment of fineness
by rotor speed: Higher
rotor speed gives
higher fineness
grit cone

classifier - type SLS


TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
coal mill

raw mill coal cement mill

cement raw material cement


calcium carbonate (CaCO3)
silicon dioxide (SiO2) = cement clinker
aluminium oxide (Al2O3) + extenders
iron oxide (Fe2O3) + gypsum
cement clinker

MPS in dry cement production line


TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
material Raw meal Coal Cement Slag

customer Ambuja, India Ambuja, India Dalmia, India Lafarge, China


grindability 9.0 kWh/t 45 HGI 15.4 kWh/t abt. 30 kWh/t
mill size MPS 5600 B MPS 3070 BK MPS 5600 BC MPS 5600 BC
Pinst 5400 kW 800 kW 5400 kW 5300 kW
throughput 566 t/h 64 t/h 300 t/h abt. 130 t/h
grinding fineness 1% R0.212 mm 11% R0.090 mm 3200 cm²/g 5300 cm²/g
spec.power cons. 14.6 kWh/t 20.7 kWh/t 24.2 kWh/t abt. 33 kWh/t
(measured on counters) (mill + fan) (mill + fan) (mill + fan) (mill +
separator)
TP/ Ne- 01 / 07

biggest mills commissioned


GEBR. PFEIFFER AG
air flow gas pressure

temperature

dp

gas pressure

Raw material grinding plant with Pfeiffer MPS mill


TP/ Ne- 07 / 05

dust collection in cyclone GEBR. PFEIFFER AG


temperature air flow

dp

gas pressure

grinding plant with Pfeiffer MPS mill


TP/ Ne- 07 / 05

dust collection in filter GEBR. PFEIFFER AG


Most of vibration problems are caused by
feed problems: lack of feed, sticking,
sudden change of feed size

cement grinding plant


TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
flowsheet
TP/ Ne- 08 / 04

GEBR. PFEIFFER AG
monitoring equipment for
TP/ Ne- 08 / 04

the avoidance of vibrations GEBR. PFEIFFER AG


Operation problems reasons/solutions

Sudden vibrations sudden lack of feed (component),


water or air or sudden change of
feed size (or moisture)
Sudden vibrations after increase of dp mill too full, so lower feed rate
and/or higher hydraulic pressure
and/or higher air flow
Higher vibrations after decrease of dp mill too empty, so higher feed rate
and/or lower hydraulic pressure
Higher kWh/t, lower throughput may be caused by wear, so
measurement, EVA anlaysis by
Gebr. Pfeiffer, then may be
reduction of dam ring or change/
hardfacing of wear parts

Operation
Gebr. Pfeiffer AG
TP/ Ne- 03 / 06

Hardfacing at Holcim (Italia) SpA, Merone plant


MPS 4250 BC GEBR. PFEIFFER AG