TEST REPORT Format No. PL/TR/18R
Sheet 1 of 3
Date: 13/04/2024
Test Report No.-PL/TR/N-09042401/01 a
Name of Customer and address | M/S Path India,76 mall road ,Indore (M.P.) -
Name of Project Four Lanning of Harda to Temagav Section Under Bharat
| ‘Mala Pariyojna Phase-1 (Economic Corridor) in the State
‘of Madhya Pradesh on Hybrid Annuity Mode Package-1
7
Name of Client/Consultant M/S Lion Engineering& Consultant
Customer Ref No. NA
| Lab Job No. i N-24040901,
‘Contact No. +91 76930 93287
Duration of Testing in days (09/04/2024 to 09/04/2024 =
Date of Casting of Member:- NA Equipment ID-PL/RH-01
Surface Condition:-Dry Make-Langry (HT-225N)
| Hammer orientation: [= Remark:-Exi
nino
7 CH-(-0+400) LHS
REBOUND HAMMER‘ TEST AS PER IS 516 Part-5 Sec-4-2020
AVERAGE Compressive
seno IOCATIONOFMEMBER/ | REBOUND | FesounD | strength to
i __NUMBER Rebound number
i
2 | —
:
3 a seer aso |
5. ‘Abutment
mi somo 4sb0
Pier aa
i
s4ee¢444¢+END OF TEST PAGE*#EEESEHEPARIKSHAN wesc tienen
tor er na
LABORATORY Mob: +91 9754103778
MATERIAL TESTING SOLUTIONS Email : parikshanlab@gmail.com
www.parikshanlaboratory.in
‘TEST REPORT Format No. PL/TR/18R
Sheet 2 of 3
Date: 13/04/2024
‘Test Report No.-PL/TR/N-09042401/01
“40
46
J a
AAPA a4
Girder no.03 a4
a2
aes
o 46
azepa | —*8 48.00 58.00
i 48 |
Girder n0.02 =
| 50
52
50 | |
a 54
Pa 52
Pedestal no.01 56
| 34
aa
38 |
AL&PL ae ‘40.67 44.00
Slab (Solid) ot
40,
40,
| = 44
A2&P2 a2 43,00
Slab (Solid) 4 530g
43,00 48.00
1
53.00 66.00
44
44,
40,
, 38
40.
nA 38] 38.33 40.00
Pedestal no.03 36.
38
‘su0we88*END OF TEST PAGE*™™PEGRIKSHEN —gesceicees nico
eerie
LABORATORY = res iiiatemve
MATERIAL TESTING SOLUTIONS
Email : parikshanlab@gmail.com
‘www.parikshanlaboratory.in
TEST REPORT Format No. PL/TR/18R
sheet 3 of 3
Date: 13/04/2024
Test Report No.-PL/TR/N-09042401/01
1 52
2 ; Eg
3) zara sy 5200 64.00
S| ero. 01 4
6. 50 -
1 36
2 36
3 qe 36 |
Pa 3667 38.00
“ pert) | 28
5 | 38
36
36
2 38
3 Qa Los
: re a 38.33 40.00
3. ‘Abutment 40
6. Ad 1 —
Not:
1 ep don te ans sine ote aban hep ot a
rte bomct tn pm,
2 Mata reno mle cme man
3) | 3 sree tobe me fica ay fon host ar Teg, here
‘ oe
fdSignatory |S partanan abortory sal not be response /ansmeabl for any dsrepancies
Gupta (Q.M) _| 5) parameter marked with * is not covered in our scope.
‘Thanking you, we look forward for your valuable feedback as it helps usin reverting better quality work.
‘+eane#0494END OF TEST REPORT#*N####*PARIKSHGN wee e.ciieesicum
Near Puspkunj Hospital,
LABORATORY — frrersters. nor wn
MATERIAL TESTING SOLUTIONS hanlab@gmail.com
‘www.parikshanlaboratory.in
TEST REPORT Format No. PL/TR/18R
Sheet 1 of 2
Date: 13/04/2024
‘Test Report No.-PL/TR/N-09042401/02
‘Name of Customer and address | M/S Path India,76 mall road ,Indore (M.P.) |
Name of Project | Four Lanning of Harda to Temagav Section Under Bharat
‘Mala Pariyojna Phase-1 (Economic Corridor) in the State
‘of Madhya Pradesh on Hybrid Annuity Mode Package-1
|_Name of Client/Consultant M/S Lion Engineering& Consultant
‘Customer Ref No. NA
Lab Job No. 1N-24080902
Contact No. — #91. 76930 93287 -
Duration of Testing in days (09/04/2024 to 09/04/2024
Date of Casting of Member:- NA ees ID-PL/RH-01
Surface Condition:-Dry Make-Langry (HT-225N)
Hammer orientation: In table Remark:- New minor bridge
a CH-(-0+400) RHS |
REBOUND HAMMER® TEST AS PER IS 516 Part-5 Sec-4-2020
| sano | LOCATION OF MEMBER/ | REBOUND | FrROUND ee
HAMMER ORIENTATION | NUMBER mNoeR Cay
= - “| -
2. 44
2 aL —— 45.66 54.00
Abutment Wall o
6 | 46
1 50 —_
7 52
3. 48
a Wall no. 01 —a—| 48.33 58.00
es 46
6 48
1 48 |
2. 46
3 Wailno. 01 4 44.66 52.00
4 4
(5s. aa
(6. a | |
s+euee044+#END OF TEST PAGE***H#0#PARIKSHEN see se-ciecnn comm
ce
ira
LABORATORY — rer ists
MATERIAL TESTING SOLUTIONS
Email : parikshanlab@gmail.com
www.parikshanlaberatory.in
TEST REPORT Format No. PL/TR/18R
Sheet 2 of 2
Date: 13/04/2024
‘Test Report No.-PL/TR/N-09042401/02
48
46
46
46
44
48 |
44
46
48
48
46
46
46
46.33, 54.00
46.33 60.00
46,00 54.00
46
m4 |
a
a6
48
Note:
1} Tae repr is purely based onthe samples submited tothe Laboratory; this report snot val fr
any legal purpose without permission.
2) Samples not drawn by unless therwise mentines.
53} samples may be removed /Sestoyes away ffom Laboratory aftr Testing, unless otherwise
cular equert i made for thee preserves.
1) Parksan Laboratory shal nt be responsible answerable fr any discrepancies.
5) Parameter marked with * Ino covered a our scope
king you, we look forward for your valuable feedback as it helps us in reverting better quality work.
sheaneeesEND OF TEST REPORT#*#EOHO##PGRIKSHGN Adress 9, Kishna Kun Colony
st Ee an
LABORATORY Mobs 919756102778
MATERIAL TESTING SOLUTIONS arikshonlab@gmeil.com
‘TEST REPORT Format No. PL/TR/18R
Sheet 1 of 2
Date: 13/04/2024
‘Test Report No,-PL/TR/N-09042401/03
[_Name of Customer and address _| M/S Path india,76 mall road ,Indore (M.!
Name of Project Four Lanning of Harda to Temagav Section Under Bharat
‘Mala Pariyojna Phase-1 (Economic Corridor) in the State
of Madhya Pradesh on Hybrid Annuity Mode Package-1
Name of Client/Consultant | M/S Lion Engineering Consultant
Customer Ref No._ [NA - -
Lab Job No. 'N-24040901
Contact No. +91. 76930 93287
Duration of Testing in days (09/04/2024 to 09/04/2024 I
Date of Casting of Member: NA Equipment ID-PL/RH-01
Surface Condition:-Dry Make-Langry (HT-225N)
Hammer orientation: In table Remark:- New minor bridge
- (CH-(-0+400) RHS
REBOUND HAMMER® TEST AS PER IS 516 Part-5 Sec-4-2020
| gp.no | LOCATION OF MEMBER/ | REBOUND ae Psat
HAMMER ORIENTATION | NUMBER RURaOeR Seen
1 50 |
, (-¥*s2
48
a ra 48.66 58.00
wall a6__|
48
46 -
“4 |
Wall no. 01 i 4633 ‘Bh
48
46 |
(6
3 oo a |
a Wall t—a 46.00 54.00
5. 46
6 | - [48
'***END OF TEST PAGE******9"%0P GR KS H G N Address 43, Krishna Kunj Colony,
oe
LABORATORY Movs "919788109778
MATERIAL TESTING SOLUTIONS 4
‘www.parikshanlaboratory.in
TEST REPORT Format No. PL/TR/18R
Sheet 2 of 2
Date: 13/04/2024
‘Test Report No.-PL/TR/N-09042401/03
1 L438
2 50,
5 Stab eI
a g a 48.66 50.00
5. 46
6 - 48
Note:
11 The reo pu asd onthe sample submited tthe abt hs repo tv or
doyle prose out perms.
2 Sars ot row yo nln otherwise mention
3) sampler may be removed esvoed sway fom tabratey ater Tesg, anes otherwise
parir eer ade or theresa
ted Signatory | 4) parkshan Laboratory shal not be responsible /answerable for any discrepancies.