You are on page 1of 7
PGRIKSHEAN wecceienicim ee LABORATORY — ferstez.tecr MATERIAL TESTING SOLUTIONS Email : parikshanlab@gmail.com wwrw.parikshanlaboratory.in TEST REPORT Format No. PL/TR/18R Sheet 1 of 3 Date: 13/04/2024 Test Report No.-PL/TR/N-09042401/01 a Name of Customer and address | M/S Path India,76 mall road ,Indore (M.P.) - Name of Project Four Lanning of Harda to Temagav Section Under Bharat | ‘Mala Pariyojna Phase-1 (Economic Corridor) in the State ‘of Madhya Pradesh on Hybrid Annuity Mode Package-1 7 Name of Client/Consultant M/S Lion Engineering& Consultant Customer Ref No. NA | Lab Job No. i N-24040901, ‘Contact No. +91 76930 93287 Duration of Testing in days (09/04/2024 to 09/04/2024 = Date of Casting of Member:- NA Equipment ID-PL/RH-01 Surface Condition:-Dry Make-Langry (HT-225N) | Hammer orientation: [= Remark:-Exi nino 7 CH-(-0+400) LHS REBOUND HAMMER‘ TEST AS PER IS 516 Part-5 Sec-4-2020 AVERAGE Compressive seno IOCATIONOFMEMBER/ | REBOUND | FesounD | strength to i __NUMBER Rebound number i 2 | — : 3 a seer aso | 5. ‘Abutment mi somo 4sb0 Pier aa i s4ee¢444¢+END OF TEST PAGE*#EEESEHE PARIKSHAN wesc tienen tor er na LABORATORY Mob: +91 9754103778 MATERIAL TESTING SOLUTIONS Email : parikshanlab@gmail.com www.parikshanlaboratory.in ‘TEST REPORT Format No. PL/TR/18R Sheet 2 of 3 Date: 13/04/2024 ‘Test Report No.-PL/TR/N-09042401/01 “40 46 J a AAPA a4 Girder no.03 a4 a2 aes o 46 azepa | —*8 48.00 58.00 i 48 | Girder n0.02 = | 50 52 50 | | a 54 Pa 52 Pedestal no.01 56 | 34 aa 38 | AL&PL ae ‘40.67 44.00 Slab (Solid) ot 40, 40, | = 44 A2&P2 a2 43,00 Slab (Solid) 4 530g 43,00 48.00 1 53.00 66.00 44 44, 40, , 38 40. nA 38] 38.33 40.00 Pedestal no.03 36. 38 ‘su0we88*END OF TEST PAGE*™™ PEGRIKSHEN —gesceicees nico eerie LABORATORY = res iiiatemve MATERIAL TESTING SOLUTIONS Email : parikshanlab@gmail.com ‘www.parikshanlaboratory.in TEST REPORT Format No. PL/TR/18R sheet 3 of 3 Date: 13/04/2024 Test Report No.-PL/TR/N-09042401/01 1 52 2 ; Eg 3) zara sy 5200 64.00 S| ero. 01 4 6. 50 - 1 36 2 36 3 qe 36 | Pa 3667 38.00 “ pert) | 28 5 | 38 36 36 2 38 3 Qa Los : re a 38.33 40.00 3. ‘Abutment 40 6. Ad 1 — Not: 1 ep don te ans sine ote aban hep ot a rte bomct tn pm, 2 Mata reno mle cme man 3) | 3 sree tobe me fica ay fon host ar Teg, here ‘ oe fdSignatory |S partanan abortory sal not be response /ansmeabl for any dsrepancies Gupta (Q.M) _| 5) parameter marked with * is not covered in our scope. ‘Thanking you, we look forward for your valuable feedback as it helps usin reverting better quality work. ‘+eane#0494END OF TEST REPORT#*N####* PARIKSHGN wee e.ciieesicum Near Puspkunj Hospital, LABORATORY — frrersters. nor wn MATERIAL TESTING SOLUTIONS hanlab@gmail.com ‘www.parikshanlaboratory.in TEST REPORT Format No. PL/TR/18R Sheet 1 of 2 Date: 13/04/2024 ‘Test Report No.-PL/TR/N-09042401/02 ‘Name of Customer and address | M/S Path India,76 mall road ,Indore (M.P.) | Name of Project | Four Lanning of Harda to Temagav Section Under Bharat ‘Mala Pariyojna Phase-1 (Economic Corridor) in the State ‘of Madhya Pradesh on Hybrid Annuity Mode Package-1 |_Name of Client/Consultant M/S Lion Engineering& Consultant ‘Customer Ref No. NA Lab Job No. 1N-24080902 Contact No. — #91. 76930 93287 - Duration of Testing in days (09/04/2024 to 09/04/2024 Date of Casting of Member:- NA ees ID-PL/RH-01 Surface Condition:-Dry Make-Langry (HT-225N) Hammer orientation: In table Remark:- New minor bridge a CH-(-0+400) RHS | REBOUND HAMMER® TEST AS PER IS 516 Part-5 Sec-4-2020 | sano | LOCATION OF MEMBER/ | REBOUND | FrROUND ee HAMMER ORIENTATION | NUMBER mNoeR Cay = - “| - 2. 44 2 aL —— 45.66 54.00 Abutment Wall o 6 | 46 1 50 —_ 7 52 3. 48 a Wall no. 01 —a—| 48.33 58.00 es 46 6 48 1 48 | 2. 46 3 Wailno. 01 4 44.66 52.00 4 4 (5s. aa (6. a | | s+euee044+#END OF TEST PAGE***H#0# PARIKSHEN see se-ciecnn comm ce ira LABORATORY — rer ists MATERIAL TESTING SOLUTIONS Email : parikshanlab@gmail.com www.parikshanlaberatory.in TEST REPORT Format No. PL/TR/18R Sheet 2 of 2 Date: 13/04/2024 ‘Test Report No.-PL/TR/N-09042401/02 48 46 46 46 44 48 | 44 46 48 48 46 46 46 46.33, 54.00 46.33 60.00 46,00 54.00 46 m4 | a a6 48 Note: 1} Tae repr is purely based onthe samples submited tothe Laboratory; this report snot val fr any legal purpose without permission. 2) Samples not drawn by unless therwise mentines. 53} samples may be removed /Sestoyes away ffom Laboratory aftr Testing, unless otherwise cular equert i made for thee preserves. 1) Parksan Laboratory shal nt be responsible answerable fr any discrepancies. 5) Parameter marked with * Ino covered a our scope king you, we look forward for your valuable feedback as it helps us in reverting better quality work. sheaneeesEND OF TEST REPORT#*#EOHO## PGRIKSHGN Adress 9, Kishna Kun Colony st Ee an LABORATORY Mobs 919756102778 MATERIAL TESTING SOLUTIONS arikshonlab@gmeil.com ‘TEST REPORT Format No. PL/TR/18R Sheet 1 of 2 Date: 13/04/2024 ‘Test Report No,-PL/TR/N-09042401/03 [_Name of Customer and address _| M/S Path india,76 mall road ,Indore (M.! Name of Project Four Lanning of Harda to Temagav Section Under Bharat ‘Mala Pariyojna Phase-1 (Economic Corridor) in the State of Madhya Pradesh on Hybrid Annuity Mode Package-1 Name of Client/Consultant | M/S Lion Engineering Consultant Customer Ref No._ [NA - - Lab Job No. 'N-24040901 Contact No. +91. 76930 93287 Duration of Testing in days (09/04/2024 to 09/04/2024 I Date of Casting of Member: NA Equipment ID-PL/RH-01 Surface Condition:-Dry Make-Langry (HT-225N) Hammer orientation: In table Remark:- New minor bridge - (CH-(-0+400) RHS REBOUND HAMMER® TEST AS PER IS 516 Part-5 Sec-4-2020 | gp.no | LOCATION OF MEMBER/ | REBOUND ae Psat HAMMER ORIENTATION | NUMBER RURaOeR Seen 1 50 | , (-¥*s2 48 a ra 48.66 58.00 wall a6__| 48 46 - “4 | Wall no. 01 i 4633 ‘Bh 48 46 | (6 3 oo a | a Wall t—a 46.00 54.00 5. 46 6 | - [48 '***END OF TEST PAGE******9"%0 P GR KS H G N Address 43, Krishna Kunj Colony, oe LABORATORY Movs "919788109778 MATERIAL TESTING SOLUTIONS 4 ‘www.parikshanlaboratory.in TEST REPORT Format No. PL/TR/18R Sheet 2 of 2 Date: 13/04/2024 ‘Test Report No.-PL/TR/N-09042401/03 1 L438 2 50, 5 Stab eI a g a 48.66 50.00 5. 46 6 - 48 Note: 11 The reo pu asd onthe sample submited tthe abt hs repo tv or doyle prose out perms. 2 Sars ot row yo nln otherwise mention 3) sampler may be removed esvoed sway fom tabratey ater Tesg, anes otherwise parir eer ade or theresa ted Signatory | 4) parkshan Laboratory shal not be responsible /answerable for any discrepancies. Qh Gupta (CLM) | 5)parmete mare wih et coverednout scope ‘Thanking you, we look forward for your valuable feedback as it helps usin reverting better quality work EsaSacaEnMCRTTST REECE eTeteaaes

You might also like