1.
Contract Details
Contractor name:
Contractor ABN:
Contractor address:
Contractor Safety
representative:
Phone: -
Contract description:
Location of works:
Start date:
End date:
Table of contents
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Contract Details.....................................................................................................................................
Safety Policy...........................................................................................................................................
Responsibilities.......................................................................................................................................
Scope and Construction Activity Details.............................................................................................
Safe Work Method Statements.............................................................................................................
Hazard & Risk control register............................................................................................................
First Aid and Injury Management.......................................................................................................
Emergency Procedures..........................................................................................................................
Public Protection....................................................................................................................................
Site Rules............................................................................................................................................
Incident reporting and investigation................................................................................................
Specialised Work or Licensing.........................................................................................................
Training and Induction Requirements............................................................................................
Plant and Equipment Register..........................................................................................................
Chemical Management......................................................................................................................
Safety Monitoring..............................................................................................................................
Subcontractor Management.............................................................................................................
Sign Off...............................................................................................................................................
Page 1 of 3
2.
Safety Policy
3.
Responsibilities
4.
5.
Attached any Safe Work method statements that are required under current legislation for the works that
are being conducted and how works will be trained in them.
6.
List the hazards of the works, what the risks are associated with those Hazards and what control measure
will be put into place to reduce the risks, this should be done using the Hierarchy of Control.
7.
Describe any specific Injury Management processes for this contract, including
reporting to WHS Division when required (Legislation reasons) and also reporting to
P&F / PM of serious incidents.
8.
Emergency Procedures
9.
Public Protection
Describe the plans / controls to protect the pubic and student for work activities
10.
Site Rules
List below some site rules which all persons working on site must abide by
11.
Describe how incidents will be reported, recorded and investigated and how you will report it to P&F.
You also must describe how you will advise PF if a Workplace Health and safety Inspector has visited
your worksite.
12.
13.
Induction Requirements
Inductions for contractors are to be completed in accordance with the P&F UQ Contractor Safety
Induction process. List any relevant communication or training methods used during the works in
relation to safety, for example weekly toolbox meetings or safe procedure training.
Plus explain how all works will undergo a job site safety induction.
ALL WORKERS MUST HAVE UNDERGONE THE OHS CONSTRUCTION SAFETY INDUCTION (BLUE
CARD) BEFORE WORKING ONSITE
14.
15.
Chemical Management
16.
Safety Monitoring
List any ongoing inspections, hazard management and near miss reports
17.
Subcontractor Management
If you will be using any subcontractors, they must be supervised and understand UQ polices and
procedures.
Attached Subcontractor List detailing the subcontractors to be used and the details of the subcontractor
management
List methods of Sub-contractor site specific inductions and also Sub-contractors SWMS requirements.
18.
Sign Off
Page 3 of 3