Progress Update data from the Site
Status Date: 14/09/2024 (Sat)
Task Name Actual Actual Phys. % Actual Remaining Actual Rem.
Start Finish complete Duration Duration Work Work
04-09 11-09 Grading
crew-350
Grading and hr
Site Prep
Supervisor
– 25 hr
12-09 14-09 JCB – 11hr*
Dig Diesel- 110
Foundation litres*
Lay 14-09 1d Concrete Concrete
Foundation crew – 80 h Crew -
drains 40h
*Actual Work Details for Dig Foundation
Date JCB Diesel
12/09 (Tue) 2.5h 25 liters
13/09 (Wed) 4.5h 45 liters
14/09 (Thu) 4h 40 liters
10 | P a g e
Status Date: 28/09/2024 (Sat)
Task Name Actual Actual Phys. % Actual Remaining Actual Rem
Start Finish complete Duration Duration Work Work
Grading 04-09 11-09 Grading
and Site crew-350
Prep hr
Supervisor
– 25 hr
Dig 12-09 14-09 JCB – 11hr
Foundation Diesel –
110 ltr
Lay 14-09 16-09 Concrete
Foundation crew – 120
drains h
16-09 16-09 Concrete
Rough in
Crew –
drainage
70h
17-09 17-09 Concrete
Crew – 78
h
RMC – 11
Pour cum
Footings Plywood –
2.5 sqm
Timber – 6
cft
16-09 17-09 100% Concrete
crew -450
h
Pour RMC-23
basement cum
floor Plywood –
38 sqm
Timber -24
cft
11 | P a g e
Task Name Actual Actual Phys. % Actual Remaining Actual Rem
Start Finish complete Duration Duration Work Work
19-09 20-09 Concrete
crew -145
h
RMC-11.5
Pour
cum
basement
Plywood –
walls
34 sqm
Timber -19
cft
Cure 21-09 23-09 Concrete
basement Crew – 30
walls h
24-09 27-09 Framing
Crew –
Frame 195 h
Walls Framer
(Contract)
– 200 h
28-09 2d 1d Framing Framing
crew – 90 crew
h 75h
Roof Joists
Framer Framer
(Contract)- – 75 h
90h
28-09 60/500 = 1d 3d Framing Framing
12% crew -40 h crew -
Roof
Framer – 10h
Sheathing
40h Framer
– 10h
Installation 28-09 4/28 = 1d 6d Framing 310h
of 14% crew – 40
windows/ h
doors
12 | P a g e