Project Report
Project Report
DONE:
- Nagpalit ng gulong ng lifting
door
L-HOUSE RESIDENCE - Installed screen lifting door
Blk18 lot18&16 Phase 1A, Marquee - Punchlist 2nd floor
6 Place Subd., Angeles City, Pampanga - Palit ng mga damaged GB - 4pcs. Fix glass w22
DONE:
- Silicon repair Balance: 1pc. angular for
- Dismantling railing and Jalouse for family area G/F,
cleaning security screen for jalouplas
- Railing sliding door G/F and 2F (measurement
- Checking all the doors and done on 8/10/2024- kaya nung
window's handle araw lang na yan nasukatan
dahil babaguhin dapat ang
7 ATTY. LIM 8/10/2024 jalou as per sir Joshua)
DONE INSTALLING: Balance: 6 sets roll-up screen;
- CLEANING OF ALL DOORS all sliding doors security screen;
AND WINDOWS W15, W16 and lifting door
ALDOUS RESIDENCE - EXCEPT- W15, W16 and Lifting cleaning (hindi pa malinis dahil
8 Lipa, Batangas city door may obstruction pa)
DONE:
- Baon ng floor hinge
- installing transom fixed glass
- Door lock, handle patch
- Done cleaning- Door 5 and
W3 2 sets of cylinder key
MORPHE RESIDENCE - Checking cylinder lock replacement (not working);
9 Lipa, Batangas City (function hall) cleaning
10 LIU CECI DONE -
11 SAM RESIDENCE DONE -
DONE CLEANING:
*Living area high window and
venetian hall tiles living area
*3F 2F GF area
*Dirty kitchen ang formal
BENITO LIM - KAKUEN kitchen
12 Victoneta Potrero, Malabon City *Cleaning tiles stair GF 2F 3F -
Done installing:
DONE:
- windows and doors
- br-1 Hb, Br-3 t&b
- mbr- br-1, br-2, br-3
JOHN FINSTER CALUBAQUIB - hallway stair
lot12 blk28 Sun Valley, West End, - retouch- windows and doors
14 Antipolo, Rizal (gasgas sa mga profile) Cleaning
DONE:
- windows and doors
- br-1 Hb, Br-3 t&b
- mbr- br-1, br-2, br-3
MICHAEL CALUBAQUIB - hallway stair
lot12 blk28 Sun Valley, West End, Antipolo, - retouch- windows and doors
15 Rizal (gasgas sa mga profile) Cleaning
TRANSPHIL MAPUA
blk25 lot17 Phase 8 corner
Montefiore metropolis St., Portfino On-going- Cleaning ground cleaning LG, Maids room,
16 Heights floor area 8/7/2024 drivers' room
DONE:
Cleaning- Unit 1 3F, 4F
-screen delivery
-Installed security screen door
& window 2F, 3F, 4F
-Installed 2F unit-1 sliding door
TRANSPHIL ASTORIA UNIT 1 & window retouch unit-1 door
R.O Santos St., Barangay New Zaniga & window na may mga maliit
17 Mandaluyong City na gasgas at awang. Leak test
VILLAFLOR -SORIANO
RESIDENCE
5 Flamingo St., Green meadows -DONE:
25 Subd., Quezon City - roll-up cleaning
DONE INSTALLING:
W1- Drain hole for installation
install, alignment, sealant, 2
face glass glazing
W2- 2 set install drain hole,
glass glazing, sealant cleaning,
6pcs glass installed, alignment
W1 2set install
- drilling the hole for
installation
- Alignment, sealant
- 12 pcs. glass glazing
W2 2 set installed
-Drilling hole
-Alignment sealant
- 6pcs glass glazing
19 set roll-up screen installed,
sealant, alignment
2 set roll-up screen GYM area
and arcade
2 set gear awning replacement
(Jose Marie Villa)
2 set handle awning
replacement (Jose Marie Villa)
8 set Handle and gear Grotto- tubular 2x4; handrail
AMARA replacement in Villa full view and ocean view;
29 Marinduque City 8 set awning only (takip) AC- TUBULAR 2X2
31 NAVAL RESIDENCE - -
34 R.PASCUAL DONE -
35 THERESE ALONZO DONE -
36 CHUAHIOCK RESIDENCE DONE: Leak test and frosted 1pc. Glass masters' area
37 GARCIA RESIDENCE (MONTALA) for Turnover Arch Gian -
Done installing:
Hauling kasitas 7/12;
2F Kasitas 19 handle and
sealant 7/13
Sliding door- glazing fix glass
and sash 7/13
Hauling (gagamitin ni kuya
Arman for glass railing) 7/14
Kasitas 19 GF sliding door &
handle 7/15
Kasitas 21 2F sliding door
handle, sealant 7/16
Kasitas 21 GF sliding door
handle, sealant 7/17
PUERTO DEL SOL UNIT 19&21 Cleaning Kasitas 19 & 21,
38 Bolinao, Pangasinan turnover 7/18 -
PEREZ RESIDENCE
18 King George St., Kingspoint subd done installing: 20 sets window
39 Bagbag,Quezon city with glass; 1 set door with sash; Jalou and cleaning
40 PATRICIA SANMOCTE DONE -
41 SIR GABBY DONE -
42 ABEL COVERED COURT - -
Done:
1 set awning
leaktest
54 SALAO RESIDENCE cleaning -
55 TORIBIO - -
65 POLARIS - -
66 ANVAYA-VILLAFLOR on-going in fabrication -
68 FERDIE DALISAY - -
69 TRANSPHIL INWOOD - -
70 CHELSEA -
MONTIERO
73 BF Homes, Parañaque - -
Actual measurement by
79 NANCY LIM Ronald 8/14/2024 -
80 SONNY YAO Done installing: Canopy -
81 MC6 BAYLON - -
- (2set w13-wala
m coat kaya hindi pa
W16 on-hold by sir Oliver;
ditional awning MBR frame and sash on-going on
Kitchen area fabrication 7/11/2024; isasabay
nalang sa ibang balances -sir
going in fab 8/17 Oliver 8/9/2024; COMPLETION 8103 (REORDER W16)
r area additional OF BALANCE 'TIL 2ND WEEK OF 6PCS. 6MM CLR TEMP ordered 7991- accordion screen Augu
2F SEPT. RANDY on August 24, 2024 10, 2024
2 PCS. W26,W.1-13
e: dummy lever type 6MM EURO GRAY TEMP RE-
le & gear handle, ORDER rec on August 9, 2024 5pcs. Re-powdercoat on Au
of sash & frame, glass - JEFF 16, 2024
TURNOVER CLEANING-
cs. Fix glass w22 6/29/2024; RONALD - -
- - NR - -
- - -
cleaning - RONALD - -
- ask NR update NR - -
waiting for client's approval for tubular for swing door scree
- screen quotation. NR - received July 9, 2024
ready for deliver, glass; "kahit
wag na muna magdala ng
bracket kasi, mag llayout #8101
big stairs, sliding door palang, pero kung gusto nila TQMP
lifting door, powder magdala, ok lang rin" -sir Oliver 2PCS. 10MM CLR TEMP transom fix GB order on Aug
room 8/16/2024 JEFF ordered on August 21, 2024 10, 2024
- - DANTE SUBCON - -
- - - - -
- - BOY - -
- - BOY - -
'1PC. MBR
10MM CLR TEMP RE-ORDER
naputol yung accessories ng rec on AUGUST 9, 2024
pang leak test kaya hindi c/o Orly sub-con with help of
Glass masters' area natapos nung Aug 9 RANDY Mamba team -
- - NR - -
on-going: railing (Arman
Miramon & Jeff group)
- 7/18/2024 RONALD - -
W10- #7985
8pcs. rec on August 5, 2024
3pcs. rec on August 8, 2024
1pc. for return Aug 8, 2024
(malaki ang size)
- w10 seroho
rec on August 12, 2024, 3pcs. Jalou bracket angle ba
ou and cleaning - ARMAN complete for received on July 16, 202
- - BOY
- - - - -
- - BOY - -
3SET- ROOM 1, 2, 3,
agyan ng roll-up, naka
ti guard walang susi.
6/29/2024 - BOY - -
- - RONALD - -
1 PC. RE-ORDER
6MM CLR TEMP (reflective
green) rec on August 16, 2024
- - NR -
done installing: 1 set additional
security screen living area
8/3/2024
- 're-cut screen, malaki 8/3/2024 NR - -
- - BOY - -
old and cleaning July 20, 2024 tentative date ARMAN - -
CORONEL SHOWER
*T-type kulang ng isa 8023
*Hinges- may part na hindi 3 PCS. 10MM CLR TEMP
shower nakulayan- 8pcs. ARMAN received on August 20, 2024 7988- accessories
- - RANDY - -
- - BOY - -
#8026
CHAIN
10PCS. 6MM/8MM CLR TEMP
rec on AUGUST 23,2024
balance 1pc 63pcs. Profile p.coat rec. o
new order AUGUST 22,2024 July 17, 2024; 50pcs. flat bar
#8027 (2 sides)
target delivery and installation TQMP 10pcs. flat bar .5 (2 sides)
- on August 27, 2024 ARMAN 20PCS. 6MM CLR TEMP rec on Aug 2, 2024
- - - - -
- - ARMAN - -
- - RANDY - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - RANDY - -
- - RANDY - -
- - RONALD - -
- - - -
- - - - -
- - - - -
- - - - -
- - RONALD - -
(SAMPLE)
TQMP
1PC. IGU GLASS 6+12+6 CLR
TEMP ordered on August 19,
- - - 2024 -
- - - - -
POWDERCOAT PULL-OUT
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
-
- -
- -