Again, I would like to congratulate, Carlos, his team and Wellington/ Veritas for the continuous improvement of the appearance ,condition and operation of 192 Claremont building., keep your good work. The following is the follow up visit report from 03/7/2012.
Concrete wall have been repaired, but work area still need to be cleaned from the debris and pieces of the old wall.
General
notes:
A
meeting
with
the
Heat
co.
maintenance
company
owner,
Larry
was
held
at
the
basement
in
the
boiler
room.
The
boiler
was
inspected
and
is
in
good
condition.
The
whole
operation
procedure
was
reviewed
with
the
Super
Carlos
Valoy
and
his
assistant.
A
quote
for
the
installation
of
cameras
on
each
floor
will
be
submitted
for
approval.
An
Internet
service
will
be
required
at
the
basement
for
the
cameras
,
the
cost
must
be
included
at
the
quote.
The
camera
will
monitored
traffic
of
tenants
and
common
area
premises.
Conclusion:
Please feel free to reply with comments or suggestions Regards, Gus Quattrone