Questionnaire PT
Questionnaire PT
Authorization.
Execution.
Planning.
Prioritization.
(25) Regarding the statements below. Mark the correct alternative.
The Issuer accompanies the Requester in the workplace verification for inspection and clearance of the
Work Permit.
The Security Professional must indicate the RAS in the PT when visiting the site for high-risk work.
risk potential or when requested by the issuer.
The Co-issuer accompanies the Requester in the workplace verification for inspection and closure of the
Work Permit.
All alternatives are correct.
Who will be responsible for ensuring the application of the requirements of the Permission standard for
Work on the Equipment or System in which the work will be carried out?
Issuer.
Co-issuer.
Requester.
Security Professional.
Which of the statements below is correct regarding the responsibilities of the Requester?
Perform only the work specified therein.
Provide all necessary resources for the execution of the work.
Start or authorize the work only after receiving the Work Permit.
All alternatives are correct.
How should services with APN-2 be monitored?
For work with APN-2, periodic verification and signature in the PT by the Co- is mandatory.
Issuer beyond the inspections for the release and clearance of the Work Permit.
For work with APN-2, regular verification and signature in the PT is mandatory, by
Issuer beyond the inspections for the release and settlement of the Work Permit.
For work with APN-2, periodic verification and signing in the PT is mandatory, by
Safety Professional in addition to inspections for the release and clearance of the Work Permit.
For the work with APN-2, periodic verification and signature in the PT is mandatory by
Requester in addition to the inspections for the release and settlement of the Work Permit.
(29) When work is to be carried out on Equipment or System that is in location of
responsibility of another area, what is necessary for the issuance of the Work Permit?
Signature of the Installation Manager responsible for the safety of the location where the equipment is installed.
Signature of the Issuer, responsible for the safety of the location where the equipment is installed.
Signature of the Co-Issuer, responsible for the security of the location where the equipment is installed.
Signature of the Executor responsible for the execution of the service in the Work Permit.
At the end of the service, the Requester must call the Issuer to perform the test on the Equipment
or System. How should you proceed after this test?
After the test has been performed, if the service is not completed, the security seal must be reapplied and
the execution of the work resumed.
After the test is completed, if the service is not finished, the blue label must be removed and the execution
of work resumption.
After the test is completed, if the service is not finished, the yellow label must be replaced and the
work execution resumed.
After the test is completed, if the service is not finished, the blue label must be reapplied and the
work execution resumed.
What are the cards that are affixed to the equipment or systems called?
Warning Label.
Signage Label.
Indication Label.
Safety Label.
The planning of an intervention must include at least:
Work planning
Operational planning
Risk analysis and preparation of Work Permit.
All the answers are correct.
Can a Boilermaker request a Work Permit within their specialty?
No, only the employee who holds a qualified and accredited supervisory level.
Yes, a qualified and accredited Boilermaker can request, including for other specialties.
Yes, a qualified and accredited Boilermaker can request only for their specialty.
Yes, a Boilermaker may request several Work Permits for the Boilermaking team.
Who can suspend a Work Permit?
Petrobras Employee Responsible for the equipment or system.
Petrobras employee or employee of a contracted company that effectively performs the service.
Petrobras Employee Responsible for the area.
All the answers are correct.
In what situation can the Work Permit be renewed?
If the Requester's work shift has not been completed, after a re-evaluation of the location and the
working conditions, the Work Permit may be renewed, limiting the renewal to the work shift of
work of the Security Professional.
If the Requirer's work shift has not been completed, after a re-evaluation of the location and the
working conditions, the Work Permit can be revalidated, limiting the revalidation to the work shift
work of the Requester.
If the Requirer's workday has not been completed, after a reassessment of the location and the
working conditions, the Work Permit may be renewed, limiting the renewal to the working hours of
work of the Issuer.
If the Requester's work journey has not been completed, after a reassessment of the location and the
working conditions, the Work Permit can be renewed, limiting the renewal to the work shift of
work of the Executor.
Who is authorized to request Work Permit?
Petrobras employee performing or at the Supervisory level, properly trained.
Employee of the contracted executing company or at the Supervisory level duly trained.
Petrobras employee and contracted executing company or at the supervisory level duly qualified
and accredited.
Employee of Petrobras and contracted executing company or at a trained Supervisory level.
The employee of the contracted company who does not hold a supervisory level may request
Work Permit?
You may request a Work Permit for any other specialty.
You may request a work permit only for services within your specialty.
You may only request a Work Permit for services defined by the inspection.
If the Requester is the executor of a job, they may request a Work Permit.
for the execution of other works.
To ensure that the Equipment or System is released for Intervention in a proper manner
To ensure, the requester must:
Request the presence of the Installation Manager on-site for the functional test.
Request the Issuer's presence at the service location for the necessary checks on the Equipment or System.
as well as the installation of necessary blocking, locking, and warning devices prior to the issuance of
Work Permit.
Request the presence of the Co-issuer at the service location for the necessary checks on the Equipment or
System, as well as the installation of necessary blocking, locking, and warning devices beforehand
issuance of the Work Permit.
Request the presence of the Safety Supervisor at the workplace for the necessary checks.
Equipment or System, as well as the installation of locking, blocking, and warning devices.
necessary before the issuance of the Work Permit.
Who can perform services under a Work Permit?
The Petrobras employee and contracted company, trained and accredited to request Permission for
Work, according to N-2162.
The Petrobras employee, qualified to request Work Permit, according to N-2162.
The Petrobras employee and the contracted company, qualified and trained to request Permission for
Work, according to N-2162.
The Petrobras employee and contracted company, trained and authorized to request Permission for
Work, according to N-6221.
What is the validity of the Requester's credential?
The credential is valid for one (01) year, as long as the employee belongs to the company's staff.
The credential is valid for three (03) years, as long as the employee belongs to the company's staff.
The credential is valid for two (02) years, even if the employee becomes part of the employee roster.
from another company.
The credential is valid for an indefinite period, as long as he remains in the employee roster of
company.
Which of the items below does not constitute a serious violation in the issuance of Work Permit?
The issuance of a work permit in blank, without the definition of the work to be performed, without the
identification of the equipment or system, without the exact delimitation of the location, without the date and time of issuance.
The clearance of the Work Permit, after the completion of the work, before the end of the work shift.
The non-compliance with any of the recommendations contained in the Work Permit.
Illegible, incomplete, or unsigned entries on warning labels, in addition to their removal
unprovided by them.
(42) For work that will be performed by employees of a contracted company, together with
Petrobras employee, who should sign the Work Permit as the Requester?
The Installation Manager will sign as the Requester.
The Petrobras employee will sign as the Requester.
The Supervisor of the company will sign as the Requester.
Any employee of the contracted company will sign as the Requestor.
(43) For work on electrical equipment, what will be necessary to ensure the conditions of
Security for your release?
The endorsement of the Installation Responsible Person will be required on the Work Permit.
The endorsement will be required on the Work Permit of the Person Responsible for Electrical Isolation, a
Authorized Professional, according to NR-10.
The endorsement of the Area Responsible's Work Permit will be required, an Authorized Professional.
according to NR-10.
Endorsement will be required on the Work Permit for the Security Professional, according to NR-10.
When will periodic checks not be required for work with APN-2?
When the Co-Issuer decides to monitor the execution of the work continuously, signaling in
specific field in the Work Permit form.
When the Requester decides on the ongoing monitoring of the work execution, signaling in
specific field in the Work Permit form.
When the Issuer decides to monitor the execution of the work continuously, signaling in the field
specific in the Work Permit form.
When the Security Professional decides on the permanent monitoring of the work execution,
signaling in a specific field on the Work Permit form.
What is the responsibility of the Requester's Management when receiving the work demand?
You must develop the planning for the execution of the work, including a risk analysis of the tasks.
You must execute the task planning, together with the Installation Manager.
You must prepare the task planning for overtime work.
Must summon the requester to board the unit to meet the demand.
What is a Specific Routine Work?
It is a routine task that is performed several times a day in a Released Area-AL.
It is frequent high-risk work, in a predefined area or equipment, where its execution does not interfere.
the processes and the risks do not change over time.
It is the frequent low-risk work, in a predefined area or equipment, where its execution does not interfere
the processes and risks do not change over time.
It is the frequent work done by the person responsible for the equipment or system without the need for
issuance of the Work Permit.
The systematics of Work Permit can be simplified with the use of other
tools:
Routine and Specific Work - TRE, Released Area - AL, Work Permit - PT
Released Area -RA, Routine and Specific Work -RSW, Renewed Work Permit
Released Area -AL, Routine and Specific Work -TRE, Renewed Work Permit, APN1 and APN2
Routine and Specific Work - TRE, Released Area - AL, Permit for Temporary Work - PTT
(48) When should the Execution Planning phase be completed?
At least, the day before the execution of the work.
At least two days before the execution of the work.
At least one week before the execution of the work.
At least one hour before the execution of the work.
The cancellation of the Work Permit implies the issuance of a new Work Permit. Who should issue it?
Requester.
Installation Manager.
Security Professional.
Issuer
Regarding isolation, maneuvering, and locking devices, select the correct option.
The isolation device is the element that interrupts the transmission of energy.
The control device is the element that interrupts the flow or transmission of energy.
The locking device is the element that prevents accidental handling or operation of the device.
maneuver.
All the answers are correct.
Regarding the monitoring of the execution of the work, we can affirm that:
The Co-issuer must carry out periodic checks, indicating the times on the back of the Work Permit.
in which these checks will be carried out.
The Facility Manager should designate the Area Operator to monitor the work.
The issuer must conduct periodic checks, indicating on the back of the Work Permit the times at
that these verifications will be carried out.
All answers are correct.
Regarding the Work Permit, it is correct to state that:
Before the issuance, the person responsible for the area and the requester must inspect the equipment and the location.
execution of the work.
Before the issuance, the Responsible for the equipment or system and the Requester must inspect the
equipment and the location of the work.
Before the issuance, the Installation Manager and the Requester must inspect the equipment and the location of
completion of the work.
Before the issuance, the Executor and the Safety Professional must inspect the equipment and the location of the
execution of the work.
(53) For the preparation of the Level-2 Hazard Analysis, at least the following should be convened:
Issuer, Requester, Security Professional, and Co-Issuer.
Issuer, Installation Manager, Responsible for the endorsement and Co-Issuer.
Diving Inspector, Rescue Boat Leader, Facility Manager, and Co-Issuer.
Issuer, Executor, Security Professional, and Co-issuer.
At the time of issuing the Work Permit, who should visit the workplace to
carry out a risk assessment to ensure that there are no risks with the equipment, in
system and in the area, any conditions not anticipated during the planning phase, of new risks.
Installation Manager.
Responsible for the area.
Security Professional.
Issuer.
What is the definition of Class A Equipment?
Equipment that contains or has contained toxic, asphyxiating, corrosive, flammable substances or
fuels.
Equipment used to measure the thickness of metal surfaces.
Equipment that does not contain toxic, asphyxiating, corrosive, flammable, or combustible substances.
Equipment or system that receives drinking water.
For the accomplishment of any task, it is certain to say that:
The executor must perform an inspection of the tools, accessories, machines, and equipment to be
used before the start of activities.
The issuer must conduct an inspection of the tools, accessories, machines, and equipment to be
used before the start of activities.
The requester together with the executor must conduct an inspection of the tools and accessories.
machines and equipment to be used before the start of activities.
The Requester must carry out an inspection of the tools, accessories, machines, and equipment to be
used before the start of activities.
Who is responsible for the effective service to N-2162 and the Standard PP-1E1-00210?
Issuer.
Security Professional.
Requester.
Responsible for the Installation.
(58) The Norma - 2162 defines what a Released Area is. Mark the correct option.
Location with established geographical limits, where for a determined time the issuance of PT is waived.
Location with established geographic limits, where the issuance of PT is waived for an indefinite period.
Local without established geographical limits, where for a determined period the issuance of PT is waived.
No previous answer.
What is the minimum filing period for the Work Permit issued for work done in a Space location?
Confined and Shipbuilding and Repair Works.
3 years
30 days.
02 years
5 years.
(60) According to a requirement of NR-34, for Shipbuilding and Repair Work in installations
maritime, the Work Permit must also be signed by which professionals?
By the members of the rescue team, as well as by the Security Professional.
By the members of the production team, as well as by the Safety Professional.
Any Petrobras employee and contracted company employee at the Supervisory level.
By the members of the executing team, as well as by the Security Professional.
For shipbuilding and repair work, how many copies of PT must be issued at a minimum?
At least in 03 (three) copies for the Issuer, the Executor, and one copy to be posted at the location.
At least in 02 (two) copies for the Issuer and one copy to be posted on location.
At least in 03 (three) copies for the Issuer, Requester, and one copy to be posted on the site.
The quantity is defined by the Facility Manager.
What is the responsibility of the Co-Issuer in the process of issuing a Work Permit?
Responsible for managing the material and human resources necessary for the execution of the work.
Responsible for ensuring the faithful compliance with the Additional Security Recommendations.
Responsible for answering for the working conditions of the place where the work will be carried out.
Responsible for ensuring the safety conditions of the location where the work will be conducted.
What is the maximum work permit limit per issuer, in the case of UMS connected to UM?
It is up to the Installation Manager.
Maximum limit of 7 (seven), simultaneous, per issuer. Out of these 7 (seven), only 4 (four) can be for
hot services, of which only 2 (two) can be issued for work involving the use of flame
open.
Maximum limit of 12 (twelve), simultaneous, per issuer. Of these 12 (twelve), only 4 (four) can be for
hot services, of which only 2 (two) can be issued for work involving the use of flame
open.
Maximum limit of 14 (fourteen) simultaneous by issuer. Of these 14 (fourteen), only 8 (eight) can be
for hot services, of which only 4 (four) can be issued for work using
open flame.
What Warning Label should be affixed and removed by the Issuer or their substitute?
White label.
Blue Label.
Green Label.
Yellow Label.
It is necessary to carry out some functional test of the equipment or system during the execution of
work, what must the Requester ensure?
That the performers under your supervision are aware and guided about the execution of the test, as well as
remove the blue warning label.
That the performers under your supervision are aware and guided about the execution of the test and leave the
blue warning label stay in place.
That the executors under your supervision are aware and instructed about the performance of the test, as well as
remove the yellow warning label.
That the Issuer remove the Blue label for the execution team to carry out the functionality test.
Under what conditions can work be carried out without the issuance of a Work Permit?
The work will be executed by the person responsible for the equipment or system.
There is a specific procedure for carrying out the work based on risk analysis.
The blue warning label has been affixed to the equipment or system under intervention and has been made.
installation of locking and blocking devices, according to PP-1E1-00212 and PP-1E1-00219.
All options are correct.
(67) Regarding the PPE, we can affirm that:
The job requester must define complementary PPE.
The Safety Professional must define complementary PPE.
Low-risk jobs do not require the use of PPE.
The issuer of the work must define complementary PPE.
(68) Regarding PPE, it is correct to state:
The employee must appropriately use, and whenever necessary, the protective equipment.
individual protective equipment (EPI), provided by the employer for the performance of their activities.
The employee is responsible for the maintenance and safekeeping of the PPE provided to them.
In the operational areas, the following basic PPE must be used: safety footwear without laces and
with slip-resistant sole, helmet with chin strap, safety glasses, ear protection, and gloves.
All alternatives are correct.
What is the main purpose of Warning Labels?
Indicate to the Performers the safety recommendations to be followed.
Indicate to the Executors that the service is not authorized to be performed on the Equipment or System.
Indicate to the Executants of the work that a certain Equipment or System may go into operation at
any moment.
Inform the operators that the Equipment or System should not be operated and that it is being repaired.
For each Yellow Label attached, there must be another label also attached, related to each
specialization in intervention on Equipment or System. What Warning Label will this be?
The label is white.
The label is red.
The label is blue.
The label is yellow.
(71) For Work on the Sea, which Professional should endorse in the appropriate field of the Permit for
Work regarding the local inspections and a possible man overboard scenario?
Installation Manager.
Coordinator of the Vessel.
Security Professional.
Leader of the rescue boat crew.
How should labeling be done on equipment powered by electric motors?
The area around the equipment must be marked with striped tape.
Warning labels must be affixed to the triggers.
Security labels must be affixed to the push buttons and the starters.
Warning labels must be affixed to the push buttons and the derailers.
(73) Regarding the care of the tools, it is correct to say:
Before carrying out any work, the equipment, tools, and accessories to be used must be
to be inspected by the requester and executor, in order to ensure that they are in perfect condition for use.
Before carrying out any work, the equipment, tools, and accessories to be used must
to be inspected by the Facility Manager, in order to ensure that they are in perfect condition for use.
Tools with minor defects or presenting minor faults may be used, as long as they do not
they pose a risk to the service.
Before carrying out any work, the equipment, tools, and accessories to be used must
to be used without the need for inspection.
Regarding the care of the tools, we can affirm that:
After the completion of the services, the tools used must be cleaned and preserved for storage.
If any tool has been damaged, this fact must be reported to the supervisor for replacement.
same.
The safety requirements provided by the manufacturers regarding operation and maintenance must be met.
the tools, machines and equipment.
All the answers are correct.
What is the act that constitutes the Issuance of a Work Permit?
The issuance consists of the signature of the Security Professional at the time of issuing the RAS.
The issuance occurs at the moment of signing by the Applicant, a moment in which they may take
your material and tools for the work site.
The issue occurs at the moment of the Area Operator's signature.
The issuance occurs at the moment of the Issuer's signature, in which they authorize the Requester access to the
local of the service, in order to prepare it for the start of the task.
The Safety Manual is divided into three stages. What are they?
Authorization, Planning, and Execution.
Planning, Special work condition, and Specific activity.
Planning, Specific Activity and Execution.
Authorization, Special work condition and Specific activity.
(77) Which of the alternatives below applies to the use of sledgehammers?
The use of this tool is only permitted when all possibilities of completing the work have been exhausted.
hydraulic tools, pneumatic tools, mechanical torque multipliers or similar.
Repairs to the mass or the cable are allowed as long as they are approved by the Installation Manager.
The use of this tool is only allowed when the Issuer accompanies the Executor in the service.
The use of this tool is only permitted when the Security Professional confirms the lack of tools.
hydraulic, pneumatic, mechanical torque multipliers or similar.
After fulfilling the recommendations contained in the Work Permit, what is necessary
for the start of the work?
The Installation Manager must sign in the appropriate field on the Work Permit after verifying on site.
if the recommendations have been met, this act constitutes the effective authorization to begin work.
The Security Professional must sign in the designated field on the Work Permit, after verifying on-site if
the recommendations were met, constituting this act the effective authorization for the start of the work.
The Contractor must initial the Work Permit after verifying on site that the recommendations have been implemented.
attended.
The person responsible for the equipment or system must initial in the designated field on the Work Permit, after
check on site if the recommendations have been met, constituting this act the effective authorization for the start
of work.
Who should fill out and sign the Checklists (LV) outlined in specified work
no Safety Manual- MS?
The person responsible for supervision together with the area operator.
The Installation Manager together with the Requisitioner.
The Security Professional together with the Executor.
The Responsible person for the equipment or system along with the Requester.
What is a qualified worker as a Requester?
Qualified worker registered with the competent class agency.
Trained, evaluated, and approved worker to perform the activity established in N-2162
Worker who proves completion of a specific course in their area of expertise recognized by the system.
education officer.
All the alternatives are correct.
Can the Requester be the same as the Service Provider?
Yes, the Requester can be the Performer of the work, but cannot request another Work Permit.
Yes, because to be a Requester, the Petrobras employee or that of a contracted company must have a level of
Supervision.
No, the requester must accompany the service, not allowing the task to be carried out in a manner
individualized.
No, the Requester cannot be the executor of the work, but can request another Work Permit.
(82) The Safety Manual consists of how many specific standards and what is the standard about
Work Permit?
34 standards and PP-1E1-00209
33 patterns and PP-1E1-00209
34 patterns and PP-1E1-00210
32 patterns and PP-1E1-00210
What is the validity of the Work Permit?
The PT is valid during the working hours of the Requester.
The PT is valid during the working hours of the Executor.
The PT is valid during the working hours of the Issuer.
The PT is valid during the working hours of the Co-Issuer.
(84) Regarding the safe conduct that must be adopted on the platform by the worker. Mark the alternative
correct.
The worker must move along their left side, using the handrail, when crossing walkways.
The worker should avoid staying in areas where activities are being carried out that they are not involved in.
participating.
It is permitted to work alone in uninhabited areas as long as you have the authorization of the Facility Manager.
It is allowed to use the practice of pressurizing drums with compressed air to force the transfer of liquids.
as well as cleaning the clothes using compressed air.
Upon the expiration of the validity period set in the Work Permit, if the service has not yet
Once it is completed, can this Work Permit be renewed?
Yes. After a reassessment of the location and working conditions, limiting its validity to the working hours.
of the Performer.
No. Even after a reassessment of the location and working conditions, the team needs to rest.
Yes. After a re-evaluation of the location and working conditions, limiting its validity to the work shift
from the Issuer.
Yes. After a reassessment of the location and working conditions, limiting its validity to the working hours.
from the requester.
(86) Regarding the validity of APN-1, mark the correct alternative.
The APN-1 is valid for the work shift of the Requester.
The APN-1 is valid for 14 (fourteen) days.
The APN-1 is valid for the entire duration of the work, and a new APN-1 is not required for jobs that will have
continuity the next day, unless there is a change in planning, in which case the work will return to
Planning phase.
The APN-1 is not valid for the entire duration of the work, and a new APN-1 is required for works that will have
continuity on the following day.
(87) To use the Safety Manual, three phases must be observed. Mark the alternative
correct.
Spatial working condition, Survey and Specific Activity.
Special working condition, Specific Activity and Survey.
Planning, Special working condition and Specific activity.
Prioritization, Planning and Execution.
What is the condition required for the handling of any Chemical Product during the execution of
any work?
The chemical products used must have their Safety Data Sheets stored in the cabinet under the responsibility of
supervisor of the contracted company.
The chemicals used must be accompanied by the respective Safety Data Sheet.
Chemical Product Safety Data Sheet (FISPQ), which must be kept in a location easily accessible to workers.
The chemicals used must be accompanied by the respective Individual Health Sheet with Product
Chemical Safety Data Sheet (FISPQ), which must be kept in an easily accessible location for workers.
The chemicals used must be accompanied by the respective Safety Data Sheet.
Chemical Product (SDS), which must be kept in a location easily accessible to workers.
(89) Regarding the SMS requirements, what does N-2162 establish for the worker: Mark the option
more correct.
The SMS requirements, specific to the execution of each job, should not be consulted with the
Area Operator.
The SMS requirements, specific to the execution of each job, must be consulted in the standards.
instructions and procedures for each specialty.
The SMS requirements specific to the execution of each job should only be consulted in case of
work with High Potential Risk.
The specific SMS requirements for carrying out each work activity must be consulted with
The Security Professional.
Upon boarding the maritime installation, the Issuer or Requester of the contracted company in relation to
the credential must:
Present your Credential to the Security Professional, duly signed and with a photo for verification or
registration in the APLAT system.
Present your Credential to the Issuer, duly signed and with photo for verification or registration.
APLAT system.
Present your Credential to the Installation Manager, duly signed and with a photo for verification or
registration in the APLAT system.
Present your Credential to your Supervisor, properly signed and with a photo for verification or record in
APLAT system.