ENI Paksitan ( Kadanwari Gas Field)

Permit to Work ( Test)

Name:
Designation:
Company:
Date:

1 How many work permits do we have.


a) Two
b) Three
c) Four

2 How many certificates do we have?


a) Five
b) Six
c) Seven

3 Competent worker who is authorized by the Company to enter in a confined space


and he complies with confined space entry certificate requirements.
a) HSE Officer
b) Fire Watch
c) Authorized Entrant

4 A person formally authorized in writing by his Employer after formal training and assessment as Authorizing Authority,
in charge of verifying at site the presence and effectiveness of control measures as indicated in the PTW forms.
a) Production Supervisor
b) Production Operator
c) O&M TL

5 A person formally authorized in writing by his Employer after formal training and assessment as Requesting Authority,
explaining the job scope to Performing Authority and agreeing on the conditions / precautions ;
and work method
a) Production Supervisor
b) Maintenance Supervisor
c) O&M TL

6 Who will be authorized for acceptance and return of work permits and certificates.
a) Performing Authority
b) Requesting Authority
c) Area Authority

7 Who will conduct the HSE Toolbox talk prior to the work commencing and esnure that all memebers
of the work team have a clear understanding of the scope of the work.
a) HSE Coordinator
b) Requesting Authority
c) Performing Authority

8 A person formally authorized in writing by his Employer after formal training and assessment as Issuing Authority,
responsible for the planning and approval of safe execution of activities under PTW system,
by issuing PTW forms and certificates to the Performing Authorities.
a) Production Supervisor
b) Resident Engineer
c) O&M TL

9 PTW Authorities will be re-validated after their competent assessment of every two years.
a) TRUE
b) FALSE

10 Who will authorize the work for safely execuation after checking all identified prevention
and protection measures are sufficient and implemented as per requirement.
a) Performing Authority
b) Requesting Authority
c) Authorizing Authority

11 Sequence of Cold & Hot Work Permit issuance is as follows during Non-SIMOPS Activities, which one is correct:
a) Area Authority
Requesting Authority
Authorizing Authority
Performing Authority
Issuing Authority

b) Requesting Authority
Performing Authority
ENI Paksitan ( Kadanwari Gas Field)
Permit to Work ( Test)

Issuing Authority
Authorizing Authority
Area Authority

12 Who is Simultaneous Operations Authority for Kadanwari O&M activities.


a) Resident Engineer
b) O&M TL
c) Kadanwari Resident Manager

13 Sequence of Cold & Hot Work Permit issuance is as follows during SIMOPS Activities, which one is correct:
a) Area Authority
Requesting Authority
Authorizing Authority
Performing Authority
Issuing Authority

b) Requesting Authority
Performing Authority
Issuing Authority
Authorizing Authority
SOA Authority
Affected Party (Shall sign as per requirements)
Area Authority

14 Who will appoint the Authorized Gas Tester for each Permit to Work.
a) Requesting Authority
b) Performing Authority
c) Issuing Authority

15 Authorized Firewatcher are trained in the use of gas monitors for detection
of flammable/toxic gases, and the use of portable fire extinguishers.
a) TRUE
b) FALSE

16 A Person formally appointed in writing by the company after Formal Training &
Validation, to monitor Emergency / Hazardous Situations that may develop
inside a Confined Space.
a) Authorized Confined Space attendent
b) HSE Coordinator
c) Autorized Fire watcher

17 Class is defined as an entry where breathing appratus is


not required.
a) Class A
b) Class B

18 HSE Coordinator will be responsible to carry out risk assessment


for new scope of work
a) TRUE
b) FALSE

19 All wellheads, flow lines, valve stations & other process areas are examples of
Hazardous Areas
a) TRUE
b) FALSE

20 No permit to be issued until relevant certificates/permits (Cold Work Permit


,excavation certificate, Energy Isolation certificate etc.) have been issued
and signed.
a) TRUE
b) FALSE

21 Work permit will be considered closed once the card copy (Area copy)
has been signed off by the area authority and performing authority.
a) TRUE
b) FALSE

22 Any combination of two or more sets of macro-activities carried out simultaneously within a defined area,
either by different organizations or under different management systems which may interact adversely that is called
a) CONOPS
b) SIMOPS
c) Both
ENI Paksitan ( Kadanwari Gas Field)
Permit to Work ( Test)

23 Hazardous Materials, which are toxic, corrosive, flammable, explosive, pyrophoric, asphyxiates, or radioactive in nature.
Includes materials, which are over 3 bar g pressure and / or above 60°C or below minus 5°C.
a) TRUE
b) FALSE

24 A uniquely numbered form, for the purpose of documenting the authorization for the defeat of plant ESD and F&G including the pressure relief valves (PSVs).
a) Energy Isolation Certificate
b) Safety defeat Certificate
c) Excavation Certificate

25 Positive Isolation is mendatory for any cold job to be performed on equipment


a) TRUE
b) FALSE

26 Specify and implement process, mechanical, instrument and prove effective isolation through testing is called
a) Area Authority
b) Isolation Authority
c) Authorizing Authority

27 one can authorize / issue a work permit for work that he will carry out by himself.
a) Yes
b) No

28 In case of absence of Requesting, Issuing and authorizing authorities due to emergency,


changeover or night shift, their delegates are authorized to sign permit to work/ certificate.
a) Yes
b) No

29 A generic PTW cannot be valid for more than a shift.


a) TRUE
b) FALSE

30 For Spading/ Breaking of lines /Positive isolation/ to carry out hot job under
hot work permit a separate cold work permit is required
a) TRUE
b) FALSE

31 Confined Space Entry permit is required in all cases, where excavations are
a) 2 meters deep or more
b) 1 meter deep or more
c) 3 meters deep or more

32 Validity of a permit to work is for


a) 12 hours shift
b) 12 hours but extendable to another 12 hours shift
c) Normal work shift and or max. 7 days

33 If work is to be continued in the next shift, Work Permit must be extended


on the Job Site within 60 minutes by the incoming Issuing Authority.
a) TRUE
b) FALSE

34 PTW Sequence of the copies shall be displayed to


a) Requesting Authority
Performing Authority
Area Authority

b) At the main central co-ordination room / (O&M TL Office)


Issuing Authority
Authorizing Authority
Performing Auhority

35 Who will display the card / hard copy of the PTW at work location.
a) Area Authority
b) Performing Authority

36 For Kadanwari O&M activities, original copies of the permits & certificates will be displayed at
a) O&M TL Office
b) Eni Resident Manager
c) HSE Coordinator
ENI Paksitan ( Kadanwari Gas Field)
Permit to Work ( Test)

37 Work Suspension and Cancellation of PTW if


a) In the event of an emergency e.g. hazardous situation may develop in working area;
b) For operational reasons to prevent interaction with another activity;
c) If there is a change to the nature or scope of the work;
d) Where there is a conflict with another scope of work;
e) Work to be carried out during another shift;
f) All of the above

38 In case of loss of the Original active Work Permit and / or the certificate,
who immediately stopped the work and forced closure of PTW.
a) Area Authority
b) Issuing Authority
c) Authorizing Authority

39 In case of loss of original energy isolation certificate, Who will approve the removal of Isolation after satisfying himself.
a) O&M TL Office
b) Kadanwari Resident Manager
c) HSE Coordinator

40 In chase of shift change over / hand over of Performing Authority, Issuing Authority, Authorizing Authority
and work site condition / methods change between shifts, which statement is correct .
a) Existing permit and certificates are valid.
b) New PTW and associated documents and Tool Box Talks shall be re-issued

41 On completion of work, the issued copy (hard / card copy) of the permit shall be signed off by
a) Performing Authority
b) Area Authority
c) Both

42 Who will final closed the permits and relevant certificates.


a) Area Authority
b) Issuing Authority
c) Authorizing Authority

43 Who will conduct an inspection of the worksite to confirm that it has been left in a satisfactory condition
before signing off permit.
a) Area Authority
b) Performing Authority
c) Issuing Authority

44 Sampling/ Testing of atmosphere will be carried out as close as possible to


the time of Confined Space Entry and will not be more than
a) 2 hours
b) 12 hours
c) 30 minutes

45 Who will complete section C (C1 to C4) of cold work permit by identifying the hazards involved,
precautions to be taken, PPE’s and safety equipment required for Permits / Certificates.
a) Area Authority
b) Issuing Authority
c) Authorizing Authority

46 Who will fill the section A for cold work permit.


a) Requesting Authority
b) Issuing Authority
c) Authorizing Authority

47 Hot Work Permit will only be issued if LEL is < 5% for Methane & < 2.1% for propane.
a) TRUE
b) FALSE

48 Hot Work Permit will only be issued for confined space if LEL is
a) Zero %
b) 2%
c) 5%

49 For the deactivation of fire alarms / Gas detectors, Issuing Authority shall get the approval on
a) Energy Isolation Certificate
b) Safety Defeat Form

50 Sequence of Confined Space Entry Certificate Issuance and Acceptance signatures is


a) * Authorized Gas Tester (AGT) Nomination by Issuing Authority;
ENI Paksitan ( Kadanwari Gas Field)
Permit to Work ( Test)

* Atmospheric Gas Testing of Confined space by Authorized Gas Tester (AGT);


* Confined Space Attendant Nomination by Requesting Authority;
* Additional Confined Space Attendant Nomination (in case of Class B entry) by Requesting Authority;
* Requesting Authority;
* Issuing Authority;
* Area Authority;
* Performing Authority;

b) Requesting Authority
Performing Authority
Issuing Authority
Authorizing Authority
SOA Authority
Affected Party (Shall sign as per requirements)
Area Authority
ENI Paksitan ( Kadanwari Gas Field)
Permit to Work ( Test)
Answers
1 a
2 c
3 c
4 c
5 b
6 a
7 c
8 a
9 a
10 c
11 b
12 c
13 b
14 c
15 a
16 a
17 b
18 b
19 a
20 a
21 b
22 c
23 a
24 b
25 b
26 b
27 b
28 a
29 a
30 a
31 b
32 c
33 a
34 b
35 b
36 a
37 f
38 b
39 b
40 b
41 c
42 b
43 a
44 c
45 b
46 a
47 a
48 a
49 b
50 a