Name:………………

Eni Pakistan Limited Permit to Work Design:…………


Karachi Office Test Paper Date:………………

Q1 How many work permits do we have.


a) Two
b) Three
c) Four

Q2 How many Isolation Forms do we have?


a) Five
b) Three
c) Two
Q3 Who will complete section C (C1 to C4) of cold work permit by identifying the hazards
involved, precautions to be taken, PPE’s and safety equipment required for Permits /
Certificates.

a) Area Authority
b) Issuing Authority
c) Authorizing Authority

Q4 Who will be authorized for filling the Section-A of Cold permits?

a) Performing Authority
b) Requesting Authority
c) Issuing Authority

Q5 Sequence of Cold Work Permit issuance is as follows, which one is correct?

a)
 Requesting Authority
 Issuing Authority
 Authorizing Authority
 Area Authority
b)
 Issuing Authority
 Authorizing Authority
 Area Authority
 Performing Authority

Q7 A person formally authorized in writing by his Employer after formal training and
assessment as Authorizing Authority for Karachi Office including Roof Top, in charge of
verifying at site the presence and effectiveness of control measures as indicated in the
PTW forms.

a) Sr. TL HR&O
b) Administration & General Services Team Leader
c) All of Above

Q8 Who will be authorized for acceptance and return of work permits and certificates?
a) Performing Authority
b) Issuing Authority
c) Area Authority

Q9 Who will conduct the HSE Toolbox talk prior to the work commencing and ensure that
all members of the work team have a clear understanding of the scope of the work.

a) HSE Coordinator
b) Requesting Authority
c) Performing Authority

Q10Karachi Office including Roof Top PTW Authorities will be re-validated after their
competent assessment of every two years.

a) TRUE
b) FALSE

Q11 Who will authorize the work for safely execution after checking all identified prevention
and protection measures are sufficient and implemented as per requirement.

a) Performing Authority
b) Requesting Authority
c) Authorizing Authority

Q12 A Person who is authorized to perform gas test for the presence of flammable vapors,
toxic gases and oxygen by the Issuing Authority before and during work performed under
a PTW.

a) Authorized Gas Tester


b) Authorized Fire Watcher

Q13 Who will carry out Mechanical isolation; lock out on equipment?
a) Area Authority
b) Issuing Authority
c) Authorizing Authority
d) B & C

Q14 Live work is permissible on MV equipment.

a) TRUE
b) FALSE

Q15 Who is the permit issuing authority for the Karachi Office building Roof Top?
a) Sr. HSE Specialist
b) Administration & General Services Team Leader
c) Office Facilities Administrator

Q16 The Cold work will cancel automatically if the job is not started within……..

a) 2 hours
b) 12 hours
c) 24 hours

Q17 Work permit will be considered closed once the card copy (Area copy) has been signed
off by the area authority and performing authority.
a) TRUE
b) FALSE

Q18 Who will suspend the Permit to Work?

a)
 Company Management
 HSE Manager
 Requesting Authority
 Issuing Authority
 Authorizing Authority
 Area Authority

b)
 Company Management
 Site HSE Representative
 Issuing Authority
 Authorizing Authority

Q19 Hot Work Permit will only be issued if LEL is < 5% for Methane & < 2.1% for propane.

a) TRUE
b) FALSE

Q20 Authorized Electrical person can carry out electrical isolation; lock out on LV and MV
equipment?
a) TRUE
b) FALSE

Q21Validity of a permit to work is for

a) 12 hours shift
b) 12 hours but extendable to another 12 hours shift
c) Normal work shift and or max. 7 days

Q22 Karachi office PTW Sequence of the copies shall be displayed to

a)
 Requesting Authority
 Performing Authority
 Area Authority

b)
 Main control/co-ordination room or Issuing Authority Office
 Authorizing Authority Office
 work location

Q23 Who will display the hard copy of the PTW at Karachi work location?

a) Area Authority
b) Performing Authority

Q24 Work Suspension and Cancellation of PTW for Karachi if


a) In the event of an emergency e.g. hazardous situation may develop in working area;
b) For operational reasons to prevent interaction with another activity;
c) If there is a change to the nature or scope of the work;
d) Where there is a conflict with another scope of work;
e) Work to be carried out during another shift;
f) All of the above

Q25 Can one individual act simultaneously as Permit Issuing Authority and Permit
Performing Authority for the same permit?

a) TRUE
b) FALSE

Q26 Common jobs will be performed without Permit to Work after approval of necessary
Risk Assessment by Site Manager.

a) TRUE
b) FALSE

Q27 A generic PTW cannot be valid for more than a shift.


a) TRUE
b) FALSE

Q28 Permit Authorizing Authority is a senior person, formally nominated after assessment
test by……… …….to act as the final authority for issuance of permit to work and shall
hold the overall charge of the operations for the area(s) of operational ownership.

a) Managing Director
b) HSE Manager
c) HRO Manager
d) Technical Manager

Q29 Who will be having the hard copy (card copy) of the permit till the job is finish?
a) Issuing Authority
b) Performing Authority
c) Area Authority

Q30 If work permit is not cancelled after suspension of work, then it can be continued
provided that the site has been inspected and all controls and precaution are reinstated
and verified by performing authority.

a) TRUE
b) FALSE