1. Where do we need work permits must be obtained before the works begin?
a) Restricted Area
b) Non- Restricted Area
c) Outside Aramco Facility
2. Before signing a work permit, the issuer & the receiver must conduct a ____________?
a.) Receiver Inspection
b.) Join Site Inspection
c.) Issuer Inspection
3. Both issuer & the receiver must be certified and poses a valid work permit ___________?
a.) Certification Card
b.) Aramco Identification Card
c.) Hydrogen Sulphides (H2S) Certification
4. _____________ was developed to minimize the risk of possible injury to employees while
working in restricted areas and to help prevent property damage.
a.) Certificate
b.) Issuer & Receiver
c.) Work Permit System
16. A specific area is not normally categorized as restricted area. Who makes the final
decision whether are is should be categorized as restricted area?
a.) Department Manager
b.) Production operator
c.) Receiver
18. When work permit issuer decide that a work permit is not needed in a Restricted area?
a.) When he decides the work is high risk
b.) When he decides the work is low risk.
c.) When he decides the work is in process area
27. What do you call an area where a work permits are required?
a.) Non-restricted area
b.) Restricted area
c.) Central Control Room
31. Who can decide that work is a low risk and that a work permit is not needed?
a.) Issuer
b.) Receiver
c.) Superintendent
32. What responsibility do issuer and receiver share when signing work permit?
a.) Maintaining accident on site
b.) To allowed unsafe work activity
c.) Maintaining safety condition at site
34. What type of work does the work permit system authorize?
a.) Not specific construction
b.) Specific construction, maintenance, or repair work
c.) Incomplete work details
35. What join responsibility does issuer and receiver share?
a.) Safety at the worksite
b.) Unsafe activity at the work site
c.) Discussion for family conversation
36. Why is it important that the issuer tell the receiver about safety hazards he may find at job
site?
a.) The receiver may not have worked in the area before
b.) The receiver is familiar on the work area
c.) The receiver work on the area before
38. What two things must the receiver do before receiving a work permit?
a.) Do not read the work permit and go to the site
b.) Read the work permit and not agree to all conditions
c.) Read the work permit and agree to all conditions
39. Where must the receiver keep the work permit after it is issued?
a.) Displayed at the jobsite or in his possession
b.) Inside office
c.) Office of issuer
42. What would the issuer require when welding on in-service hydrocarbon equipment?
a.) Standby man
b.) Medical representative
c.) Fire watch
45. What do we call the person who is required to be at a job site because of a special skill
he has?
b. Standby man
c. Operator
d. Fire watch
48. What must be check during the joint site inspection? Select all items that apply?
a.) Safety devices
b.) Equipment condition
c.) Workers personality
49. Who should point out all hazards and write the hazards on the work permit?
d.) Issuer
a.) Designated representative
b.) Superintendent
51. Who should ask for the work permit before they start working?
a) The receiver
b) The issuer
c) The Superintendent
55. The receiver can leave the job site anytime as long as he gets the permission of his
supervisor?
a.) True
b.) False
c.) May be
57. When preparing equipment for maintenance work, the issuer must make sure it?
a.) Not shutdown and energized
b.) Not isolated and continue energized
c.) Shutdown isolated and de-energized
60. Removing fuses from an electrical circuit or disconnecting electric wiring is an example
of what?
a.) Isolating electrical equipment
b.) Mechanical isolating equipment
c.) Civil works
63. Give some examples of the equipment that we should isolate? (5 points)
a.) Electrical equipment
b.) Mechanical equipment
c.) Hydraulic Equipment
d.) Air or gas-operated systems
e.) Vessels, pipes and confined spaces
f.) Formworks
g.) Sloping & shattering
h.) Excavation
64. For Locks/Tags sequence before issuing or receiving a Work Permit you must: (3 points)
a.) One craftsman from each work crew, who will work on the equipment, must also
install his lock and tag.
b.) During operations do not install their locks and tags
c.) Put labourer for standby man.
d.) Identify all locations where locks and tags must be installed
e.) Operations must install their locks and tags must be installed
f.) Read and make picture
65. Normally how many hours per shift before work permit can be renewed?
a.) 8 hours per shift
b.) 9 hours per shift
c.) 10 hours per shift
67. During emergency situation or if the condition specified on the work permit change what
permit receiver do?
a.) Continue the work & ignore the emergency situation
b.) Stop all work & close the permit
c.) Close the permit & continue all work
68. How many months should the permit issuer keep the original copy of the work permit?
a.) 1 month
b.) 3 months
c.) 5 months
69. Give 1 example of Hot Work Activity?
a.) Welding
b.) Visual Inspection
c.) Manual Excavation