7. Which of the following explain the most the definition of Simultaneous Operations
(SIMOPS)
A. SIMOPS is when the work programme means the mechanical and electrical
engineers are working on the same piece of equipment
B. SIMOPS is when more than one activity is being carried out on the same site at
the same time
C. SIMOPS is when more than one activity or operation is being carried out and
where the type of work of either may pose a risk to the other
D. SIMOPS is when both gas and oil production are on going at the same time on
the same site *
(1 Point)

8. Select all options where you think a Permit to Work is required?


A. Routine production operations activities where work is covered under SOP
When the job is carried out as per the SOP/SMP
B. When work between different groups needs to be coordinated
C. Visual inspection not involving confined space entry or Use of tools and
equipments
D. When the job or task is carried out rarely but in hazardous condition
E. Processes involving naked flames/ hazardous substances in approved
laboratories / workshops in non hazardous area *
(1 Point)

A
B

9. Performing Authority is the :


A. Person requiring the job to be done
B. Person working under the terms of the permit and actually performing the
activity
C. Person authorising or approving the permit
D. Person issuing the permit *
(1 Point)

10. In your opinion which of the following list explains what Section 3 of the Open
Flame Permit is for?
A. It is for Identifying the controls needed to ensure the work can be done safely
B. It is for Identifying the atmosphere is safe for the work to be carried out
C. It is for Identifying the persons who authorise the work to be carried out
D. It is for Identifying the potential hazards associated with the work *
(1 Point)

D
11. Which of the following Certificate is/ are required for making drill holes inside
wall?
A. LV Isolation
B. HV Isolation
C. Excavation/ Penetration Certificate
D. Radiography Certificate
E. No Certificate required *
(1 Point)

12. Which of the following choices do you think are correct?


A. Contractor workers do not need to understand the permit system if they have a
supervisor to sign the permit
B. Contractor workers involved with the work activity need to participate in and
contribute to the pre-job Toolbox meeting
C. The contractor supervisor is responsible for ensuring his/her workers are
competent to carry out the task
D. The contractor Supervisor can be the Issuing Authority *
(1 Point)

D
13. As the Performing Authority what things do you need to ensure when you sign off
a permit for closure
A. All tools and equipment have been removed, All manpower is clear from site
and the site is ready for handover
B. The workforce have left the site, there are some bits and pieces left which will be
removed later
C. All tools and equipment have been removed and few crew members will leave
after completing leftover work
D. All locks and tags have been removed and associated certificates are also
closed. *
(1 Point)

14. How Many Copies are there of a Cold Work Permit?


A. 1 Copy
B. 2 Copies
C. 3 Copies
D. 4 Copies *
(1 Point)

D
15. Select those which you believe are correct?
A. Open Flame Hot Work and Spark Potential permits are not to be issued for the
same area
B. The number of permits to be issued at any point of time is at discretion of
Installation Manager
C. Hot work permits must be autherised by installation manager
D. Open Flame Hot Work requires continuous gas testing *
(1 Point)

16. From the list select which do you think refer to permits?
A. Spark Potential
B. Work at height
C. Cold Work
D. Excavation
E. Confined Space *
(1 Point)

E
17. For carrying out a internal inspection and cleaning of closed vessel through hydro
jetting involving DG set, which of the following will be required according to our
PTW System
A. Confined Space Certificate and log sheet
B. Job Safety Analysis and Rescue Plan
C. Continues supervision by Area Authority
D. Continues supervision of Safety Watcher/ Hole Watcher
E. Continues Supervision of HSE Manager
F. Gas testing by AGT in regular intervals
G. Open Flame Permit
H. Spark Potential Permit
I. Cold Work Permit *
(1 Point)

18. From the following list select any you think are correct choices
A. The Installation/Site Manager does not have to authorise confined space
certificate
B. The Area Authority is responsible for the day-to-day management of the permit
system
C. The Area Authority can also be the Performing Authority
D. The Performing Authority signs on the permit after the Area Authority *
(1 Point)

A
B

19. Which certificate shall be used in case of Energy Isolation up to 650 V?


A. LV Isolation Certificate
B. HV Isolation Certificate
C. Process Isolation Certificate
D. Temporary Trip Override *
(1 Point)

20. Atmospheric/Gas tests are only required for Confined Space Entry?
A. TRUE
B. FALSE *
(1 Point)

21. Which of the following do you think is right?


A. Gas Tests are always required where there is chance of presence of hydrocarbon
gas or fumes
B. Gas testers need to be trained and authorised by the Site / Installation Manager
C. For cold work job inside confined spaces, Gas testing is not required
D. Gas testers shall report negative test results to the Area Authority/Issuing
Authority *
(1 Point)
A

22. How many types of Work Permit and certificates are there in total ?
A. 10
B. 12
C. 9
D. 11 *
(1 Point)

23. In your opinion which of the following statements are correct?


A. Only certain types of Permit to Work need to be recorded in the site Permit
register
B. The Area Authority is responsible for ensuring the permits are cross referenced
C. Each Permit to Work has a specific period of validity, usually to the end of the
shift
D. Copies of the Permit to Work need not to be present at the work location at all
times *
(1 Point)

D
24. In your opinion which of the statements are correct?
A. Toolbox talk shall be conducted right before the job starts
B. Toolbox talk meeting is conducted to share hazards and controls related to job
to the crew
C. Toolbox talk meeting is required only if significant risk is involved in work
activity *
(1 Point)

25. Select all those you think are correct statements among the given below
A. Daily PTW meeting is conducted to discuss all permits planned for next day
B. Permit for planned activities should be submitted 24hrs before the job
C. Permit to Work system is an adminstrative control against hazards in plant area
D. None of the above *
(1 Point)

26. Which of the following statements do you believe are correct


A. Confined Space Entry Certificates need not to be used for work in trenches
B. Confined Space Entry Certificates are used for work where there is limited
access/egress
C. if Confined Space certificate and Log is taken then Job Safety Analysis need not
to be done
D. Confined Space Entry Certificates require gas testing to be done in regular
interval or as defined by area authority *
(1 Point)

A
B

27. It is Cairn policy to avoid Open Flame hot work in hazardous areas wherever
practicable ? Necessary steps must be taken to minimise need for hot work
through planning and provide cost effective alternatives
A. TRUE
B. FALSE *
(1 Point)

28. Who do you think is responsible for holding a Toolbox Meeting?


A. Safety watcher in case of confined space job.
B. The Area Engineer
C. The Permit Authority
D. The Performing Authority *
(1 Point)

29. Which of the following do you think are correct?


A. For vessel entry work removal of spools/pipework is the preferred method of
isolation
B. Valves used as part of the isolation process must be secured
C. Valves can be used for isolation if the supervisor says so *
(1 Point)
A

30. Select from the options given below, all those that you think are correct
A. The Area Authority must ensure the correct PPE for the work has been identified
on the Permit
B. The Performing Authority is responsible for ensuring the workers use the correct
PPE while working
C. The Authorized Gas Tester AGT is responsible for identifying the type of PPE
required for the work to be done *
(1 Point)

31. Which of the following are correct for completing this sentence - "Work under a
Permit shall only proceed if"
A. There is clearly defined and understood scope of work and communicated to
workers in TBT
B. The work has been authorised by a responsible person
C. Most of the hazards of the job have been identified and included on the permit
D. The majority of controls identified as required have been put in place before the
work starts *
(1 Point)

D
32. Select which one of the following suggests a reason for having a Permit to Work
System
A. Contractors need them
B. PTW system is required to ensure control over hazardous activities inside plant
C. All companies use a Permit to Work
D. Permit to Work is a legal document, and statutory requirement as per OISD 105
*
(1 Point)

33. Area should be cleared of any tools or manpower before closing of permit
A. TRUE
B. FALSE *
(1 Point)

34. Which of the following statements do you think are correct options?
A. The Performing Authority must notify the Area Authority if there is an
interruption in the work programme
B. The Performing Authority can sign as the Area Authority for insignificant jobs
C. Vehicle entry should be restricted in hydrocarbon areas
D. Performing Authority can make changes in permit after permit issue *
(1 Point)

C
D

35. The Area Authority can approve and issue the permit directly to performing
authority in absence of Area Engineer.
A. TRUE
B. FALSE *
(1 Point)

36. What is the normal duration of a Permit?


A. 6 hrs
B. 12 hrs
C. 18 hrs
D. 24 hrs *
(1 Point)

37. In your opinion which of the following activities requires a Cold Work Permit?
A. Use of Laser
B. Working with mineral fibre products.
C. Dry grit/shot blasting in Hazardous Areas
D. Painting *
(1 Point)

C
D

38. From the list select those statements which you think are correct
A. A Job Safety Analysis is mandatory for confined space work
B. A Job Safety Analysis is not applicable for Cold work.
C. A Job Safety Analysis is required for all high risk work
D. All of the above *
(1 Point)

39. Section 4 of the Open Flame & Spark potential Permit covers authorisation, select
from the following those who should authorise the work activity
A. The Area Authority
B. The Performing Authority
C. Installation/Site Manager
D. The Production or Maintenance Supervisor *
(1 Point)

D
40. Area Engineer is the:
A. Person requiring the job to be done
B. Person in control of the operations which may be affected by activity done at
other locations
C. Person Incharge of the work location and final issuing authority
D. Person responsible for atmospheric gas testing *
(1 Point)

41. If the work is not going to be completed by the end of your shift, which of the
following will you do?
A. Complete the work by extending hours if it is only going to take another hour
or two
B. Make sure the team to speed up and get the work finished before the permit
expires
C. Request the permit is re-validated to allow the work to continue *
(1 Point)

42. Which of the following are correct as per you opinion?


A. The Hazards and Controls sections have space to include any additional
requirements considered necessary
B. Section 2 on the permit is for identifying the hazards associated with the work
C. The check boxes in Section 3 of the permit cover both hazards and controls
D. Section 2 Hazards section is filled by permit applicant and cross verified by area
authority *
(1 Point)
A

43. From the following given statements select those which you believe are correct?
A. Permits are required for all jobs inside plant.
B. A Permit or Certificate is not normally required for Excavation (Ground
Disturbance) work
C. There are nine (9) certificates used on Rajasthan sites
D. The site HSE Manager is responsible for ensuring contractor personnel are
competent
E. The Area Authority is responsible for specifying the site route for mobile
equipment *
(1 Point)

44. As the Performing Authority how do you ensure the isolations needed for the work
are in place?
A. Ensure that the permit with isolation certificate is complete with isolating
officers verification.
B. Have the authorised isolating officer check the isolation points and tell you they
are all in place.
C. Ensure the authorised isolating officer knows where the isolation points are.
D. Have the authorised isolating officer show you the isolation points and
demonstrate their integrity by showing adequate locks and tags as per isolation
procedure *
(1 Point)
A

45. If work conditions change from those identified on the permit what should the
Performing Authority do?
A. The Performing Authority should return the permit to the Area Authority for
updating
B. The Performing Authority should allow the work to continue and monitor the
conditions
C. The Performing Authority should ensure the workforce are made aware and tell
them to take care
D. The Performing Authority should stop the work immediately *
(1 Point)

46. In your opinion who is responsible for completing the work description details in
Section 1 of the Permit?
A. The Area Authority
B. The Permit Authority
C. The Issuing Authority
D. The Permit Applicant *
(1 Point)

D
47. If work is complete as per permit, Permit is void and can be discarded
A. TRUE
B. FALSE *
(1 Point)

48. Which the following choices do you suggest are CORRECT option?
A. The Performing Authority ensures person working are trained and competent to
do so
B. The Performing Authority does not have to organise the Toolbox Meeting
C. The Area Authority is responsible for the day-to-day management of the PTW
system
D. Permits for planned work can be applied for at any time *
(1 Point)

49. Which one of the following activities require a Spark Potential Permit?
A. Use of flare guns
B. Electrical welding
C. Dry grit/shot blasting in hazardous zones
D. Use of Portable Grinders
E. Work involving explosives and perforation guns in hazardous zones *
(1 Point)

B
C

50. From the following select all the correct statements


A. A Fire Watcher is responsible for ensuring the work area is clear of flammable
materials
B. A Fire Watcher is not required if adequate fire extinguishers are placed at site as
a control
C. A Fire Watcher should be a person who is a trained fireman
D. A Fire Watcher is responsible for ensuring gas tests have been carried out at the
location of the work *
(1 Point)

51. The boxes in Section 3 of the Permit is for listing and identifying all the controls
required
A. TRUE
B. FALSE *
(1 Point)

B
52. Which combinations of sections of Permit are used for Putting controls
A. Section 2
B. Section 3
C. Section 4
D. Section 1
E. Section 2 and Section 3 *
(1 Point)

53. From the list of activities which is the one that require Hot Work Open Flame
Permit
A. Welding, flame cutting
B. Use of lasers
C. Work involving explosives and perforating guns
D. Use of flare guns *
(1 Point)

D
54. Which of the following are correct with respect to Isolation Procedures
A. Master lock should be installed first and removed last
B. Personal locks for all people working on any equipment are not required, only
supervisors lock is sufficient
C. Isolation officer for electrical isolations is any senior autherised electrical
personal
D. Long term isolations are isolations where work is suspended but isolations must
remain in place *
(1 Point)

55. Which of the following is NOT Correct


A. Copies of permit shall be signed by relevant authorities for each revalidation
B. All Results of gas tests shall be logged on the Gas Test section and signed by
AGT
C. For Confined space entry authorisation for initial gas testing need to be taken
D. If work is inside open excavation there is no need for doing Gas Testing *
(1 Point)

D
56. Which of the following is correct colour for Confined Space Entry Certificate?
A. Blue
B. Yellow
C. Green
D. Pink *
(1 Point)

Submit

Never give out your password. Report abuse

This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is not
responsible for the privacy or security practices of its customers, including those of this form owner. Never give out your
password.

Powered by Microsoft Forms |


The owner of this form has not provided a privacy statement as to how they will use your response data. Do not provide
personal or sensitive information.
| Terms of use

You might also like