LAYING OF OPTICAL FIBER CABLE (OFC) FROM RAWALPINDI TO KHUNJRAB ALONG WITH INSTALLATION OF HIGH CAPACITY TERMINAL EQUIPMENT

(DWDM/SDH) AND SUITABLE BACK-UP SYSTEM

PROJECT NAME

Construction of Cross-Border Optical Fiber Cable (OFC) System between China and Pakistan for International Connectivity of Voice I Data Traffic (Project No I/2009-2010)

ROUTE MAP OF OPTICAL FIBER CABLE


DEPLOYMENT AREAS MAIN ALIGNMENT
S/N O a. b. FROM Rawalpindi Mansehra TO Mansehra Naran DISTANCE 140 130

c.
d.

Naran
Chilas

Chilas
Danyore (Gilgit)

110
135

e.
f. g.

Danyore
Karimabad Sust

Karimabad
Sust Khunjrab Pass

90
115 100 820

Total Approximate Distance (in Km)

PROPOSAL
Technical Proposal:- Understanding about SCO Network and complete technical proposal Financial Proposal:- Amount for deployment and commissioning of complete Network as well as five (5) years (O&M) period which shall start after the completion of one year warranty period

FINANCIAL STRENGTH
Ane tworth of not less than USD 35,000,000 Possession or access to a line of credit equal to USD100,000,000 Bidder must provide copy of its Financial Audit reports for last five years

FINANCIAL PLAN & PAYMENTS


Complete year-wise financial plan that must be in-line with project plan spanning total project duration 85% (FEC) from Banks/DFI for this project with the assistance of SCO 15% funding will be arranged by SCO through Government of Pakistan Recurring cost will be arranged and incurred by SCO.

PAYMENT TERMS / CONDITIONS FOR BIDDER


Rates are inclusive of all costs. These shall also include all profits, taxes, transportation and costs of accepting all special and general risks, liabilities and obligations to the GOP Payment will be done on, as per actual basis 30% Advance upon submission of Bidder Invoice with Bank Guarantee equaling to Advance amount from reputable Bank acceptable to SCO 60% payment upon issuance of Provisional Acceptance Testing (PAT) 10% upon issuance of Final Acceptance Certificate (FAC)

VALIDITY PERIOD OF PROPOSALS


Proposal shall remain valid for 210 days from the closing date of this RFP which can be extended at the discretion of SCO

PROJECT TEAM Dedicated and experience team on its permanent payroll for entire
duration of project include fol: Project Manager experience of at least 15 years and managed at least 3 projects of more than USD 5 million and/or at least 5 projects of OFC deployment of 200 kms each. Project Management Certification or Degree is desirable 2 X Civil Engineers experience of at least 10 years including five projects of OFC deployment of 100 kms 3 X OFC Systems Engineers(Telecom) experience of at least 10 years including 5 projects of OFC deployment of 100 kms OFC Terminal Systems Engineers(Telecom) experience of 5 years on DWDM and SDH equipment installation, operations and configuration 3x Microwave Engineers experience of 10 years on Microwave at STM Level, Link budgeting, path profiling, installation, operations and configuration in this or similar terrain NMS Engineer 5 years experience on installation of at least 5 NMS in 1+1 configuration 2x Electrical Engineer 10 years of experience on design and installation of electrical and power equipment Logistics Specialist Supply-Chain Specialist Legal Specialist Financial Specialist

SELECTION PROCESS
Qualified Bidders who shall score 75% weight in Technical Evaluation would be intimated and invited in writing (through FAX, email or postal letters) for the opening of Financial Proposals For the award of Contract, 30 % weight will be given to Financial Proposals of Bidders and 70% weight will be given to the detailed Technical Evaluation The formula for financial evaluation and overall scoring is that the lowest bidder gets 30 points and the other bidders score 30 multiplied by the ratio of the lowest bid divided by the quoted price Points obtained in the detailed technical evaluation will be carried forward and normalized to 70%. Tender will be awarded to the Bidder with maximum accumulative points (Technical + Financial)

PROJECT IMPLEMENTATION PLAN (PIP) WITH TIMELINES


Contract Signing Formalities to arrange 85% financing from Banks/DFIs Kick-off of the Project Design and Resource Planning period Survey and conceptual plan rings conceived by SCO included in this RFP Site Preparation Manufacturing & Logistic including Shipment, Custom Clearance and Transportation to designated Sites Project Implementation including RoW permission for deployment, Installation and testing Hardware Installation and Test Station Commissioning System Integration Provisional Acceptance Certificate Commercial Launch of Project Final Acceptance Certificate Bidders are expected to complete the project commissioning in Fifteen (15) months.

POINTS FOR TIMELINES


Work to be immediately start with the excavation from KHUNJRAB towards SUST and at the same time from SUST to KHUNJRAB to complete the deployment of OFC during the summer of year 2013 Bidders shall ensure availability of minimum eight asphalt/concrete machines with Diamond Cutters to be utilized in this project Excavation of Trenches and civil works must start in minimum following eleven sections (twelve sites) simultaneously; Excavation of trenches shall be 500 meters/ per day/ section which is mandatory
Rawalpindi Hassanabdal Hassanabdal Haripur Haripur - Mansehra Mansehra Naran Naran Chillas Chillas Danyore Danyore Karimabad Karimabad - Passu Passu - Sust Sust Khunjrab Khunjrab Sust