You are on page 1of 62

You are about to undergo

Safety Induction
Training

Please enjoy
your seat and
pay attention
carefully
Potential Hazards at
Workplace
Hazard is anything that can
cause harm
Potential Hazards at
Workplace
a. Fall from trap into deep
height, hole

deep
hole
Potential Hazards at
Workplace
a. Fall from trap into deep fall into
height, hole, sea
Potential Hazards at
Workplace
b. stabbeand lacerated by sharp
Cut, d, objects/tools
Potential Hazards at
Workplace
c. electric shock and
Fire explosion
,
Potential Hazards at
Workplace
d. Falling crushed by heavy
object, object,
Potential Hazards at
Workplace
d. Falling crushed by heavy
entangled by rotating
object, object,
hit machines/parts,
by moving
vehicles
Potential Hazards at
Workplace
e. Exposure of harsh weather as storm,
heavy rain, sun heat
Rain

Guys, its rain


now. Stop the
activity and
Oh.. Its so hot
go sheltering
today.. I need more
drink water,
otherwise I will get
dehydration
Potential Hazards at
Workplace
a. Bitten by noxious animals or insects as
snake, scorpion, and bee/wasp
Be careful of
my stings too

My bite is even
more noxious
then yours… My tail and
tweezers, they
are so noxious
..
Potential Hazards at
Workplace
g. Exposure to noise, radiation, and
poisonous materials
Exposure to
excessive noise
for long period
may lead to
injury of
hearing system

Drt!!! Drt!!!
Drt!!! Drt!!!
drt!!!!
Controlling Hazards
Hazards are controllable
Controlling Hazards
a. Engineering control
Installation of proper scaffolding (proper flat-form,
handrails, ladder, bracing, jack-plate, etc.)
Controlling Hazards
a. Engineering control
Use of safe ladder. Never use defect ladder or drum
while working
Controlling Hazards
a. Engineering control
Furthermore, when personnel must use long I ladder
make sure there is another person to hold the ladder or
make sure the ladder secured to fix structure

Assign one person Secure to


to hold the ladder fix structure
Controlling Hazards
a. Engineering control
Cover of hole/opening. Every hole/opening with
hazard of people fall into it must be covered properly.

I must cover this


hole / opening
properly, otherwise
people will fall into
it
Controlling Hazards
a. Engineering control
Installation of safety barrier means to isolate the
hazard and to keep people away from the hazard.
Hey, you have
to stay
Ups.. outside the
Sorry barrier
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Manner
Example: Acetylene tanks must be place on upright position
and be secured to fix structure as rack.
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Manner
Example: Bend all protruding nails on waste of woods to
prevent foot punctured by nails. Are you
For our own OK? Let me
safety, we help you
must bend all
this protruding
nails

Ouch… I forgot
to bend that
nail. Now, my
foot punctured
by nail
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Manner
Materials laid down in unsafe place may endanger
employees in the vicinity
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Live cable must be with proper insulation, proper
Manner
connection, grounding, and to be arrange in such way to
Whentrailing
avoid necessary, post warning signs in the vicinity.
cable.
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Flammable materials must be stored in separate room that
Manner
free from spark of fire or excessive heat and with sufficient
Storage must be posted with warning sign “flammable
ventilation.
materials”, prohibition sign “no smoking”, and Material
Safety Data Sheet (MSDS).
Controlling Hazards
b. Arrangement of Equipments and
Materials on the Safe Place and Safe
Harmful substances to be stored in separate room with
Manner
restricted access and completed with warning sign and MSDS
Only competent and authorized person may deal with
harmful substances.
Controlling Hazards
c. Provision of safety signs in the
strategic area of the Workplace
Prohibition sign: white background, circular red border with
diagonal cross bar, black symbol.
Prohibition sign means that particular action is
prohibited in the area.

No Smoking
Controlling Hazards
c. Provision of safety signs in the
strategic area of the Workplace
Warning sign: triangle shape, yellow background, black
border, and black symbol.
Warning sign means to warn attendance about potential
hazard that may happen in the vicinity
Controlling Hazards
c. Provision of safety signs in the
strategic area of the Workplace
Mandatory sign: round shape, blue background, and white
symbol
Mandatory sign means that action must be done as
mandated by the sign.
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Safety Helmet, means to protect head from impact caused
by falling object, moving object, and etc.
Safety helmet must be worn properly at all time while
personnel present on the premises

Helmet is
very
Important
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Safety Shoes is steel toe shoes means to protect feet from
falling object, sharp object, impact, insect, chemical, and etc.
Safety shoes must be properly worn at all time while on
the premises.

Safety Shoes
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Safety belt / body harness is a mean of falling protection. In
case personnel fall from height, safety belt / body harness
will catch the
Personnel person.
working at a place 2 meters high or more and
with hazard of falling person, must use safety belt / body
harness.
Safety belt /
body harness

2m
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Another example of safe use of safety belt / body harness.
Anchor safety belt to fix structure, do not anchor it to unfix
structure.

Correct Method Incorrect Method


Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Working at height without safety belt / body harness is very
dangerous.

Unsafe action
(no safety belt)

>2m
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Use of face shield for cutting and grinding work. Face shield
means to protect face from spark of fire or flying-broken
cutting / grinding disk.
So, remember to use face shield
while grinding or cutting

I didn’t wear face shield


while grinding. Suddenly
the disk broken and hit my
face. Look at my face, it so
badly injured.
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Welding work requires welder to use welding mask, welding
gloves, welding apron, and smoke maskmask
Welding (if necessary).
No welding mask

No apron

Welding clothes

Apron

No welding gloves

Welding gloves
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
When exposed to excessive noise, personnel must use ear
plug / ear muff to reduce the noise to acceptable level.

Ear plug
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
When exposed to excessive noise, personnel must use ear
plug / ear muff to reduce the noise to acceptable level.

Ear muff
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
Use of proper hand gloves to protect hands
from injury.
When hand gloves OK Sir
get defected,
change it with the
new one
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
When working on or over water, wear life
jacket

Its easier for


your buddy to
help you if you
use life jacket

Life jacket will


keep you
floating when
you fall in to
water
Controlling Hazards
d. Use of proper Personal Protective
Equipment (PPE).
When driving, fasten your seat belt. To see why seat
belt is important to you, take a look at this….

So.. Remember to use


seat belt while
driving!!!
Controlling Hazards
e. Periodic Safety Training and Safety
Campaign is held for new personnel prior to
Safety
work on site. Personnel undergone induction to be
induction
informed about hazards on site, hazards control, site
safety regulation, emergency response, and etc.

Indoor Safety Induction Outdoor Safety Induction


Controlling Hazards
e. Periodic Safety Training and Safety
Toolbox is held daily to maintained
Campaign
meeting
awareness of personnel, conducted by supervisor or
safety officer attended by a group of workers.
Controlling Hazards
e. Periodic Safety Training and Safety
Campaign
Safety Mass Meeting is a monthly meeting
conducted by MES and attended by all subcontractors
personnel.
Management shall give general safety talk on the meeting.
Our objective is zero
accident

Remember to
work safely at
all time
Controlling Hazards
e. Periodic Safety Training and Safety
Campaign
Fire Fighting Training
Controlling Hazards
e. Periodic Safety Training and Safety
Campaign
First Aid Training
Controlling Hazards
e. Periodic Safety Training and Safety
Campaign
The Best Safety Performance - Subcontractor is
subcontractor that performed the best safety implementation
on site.given to the subcontractor by Safety Committee
Reward Thank you
Pak Patrick
Congratulation!
Pak Sujadi

The Best Safety Performance – Subcontractor


The Best Safety Performance – Subcontractor
(Period of January 2009) (Period of February 2009)
Site Safety Regulation
Regulation for better
performance
Site Safety Regulation
a. Every personnel must commence
work in safe manner, never try to work
in unsafe manner that may endanger
him self, other people, equipments and
materials.
My friend, don’t Oh…help!!
ascend the ladder I am
with one hand!!. falling !!
U should not
bring any material
while ascending
Site Safety Regulation
b. Every personnel must obey Health and
Safety Regulation at Workplace and
make sure to pay attention to safety
signs in the area before commencing
task.
Guys, remember to
follow work method
and site safety
regulation. We have to
remind each other to
work safely. I don’t
want anyone of us get
accident. We come here
safe, we go home safe.
Site Safety Regulation
c. Every personnel is prohibited to fight,
gamble, steal, consume liquor and
illegal drug.
Breaching this regulation shall
impact to immediate dismissal
from site project.
Site Safety Regulation
d. Every personnel is prohibited to carry
any gun or weapon to work place.
We,
workers,
are not
And also allowed
not to carry
allowed gun to
to bring work
any such area
weapon
like this
Site Safety Regulation
e. It is prohibited to any body to operate
any equipments / heavy equipments
without authorization from his
employer. Only competent person will
be authorized to operate equipments /
heavy equipments. Hmm..
I want to operate
this heavy
equipment but I
don’t have any
license
Sorry Sir, you
are not
allowed to
operate the
heavy
equipment
Site Safety Regulation
f. Every personnel is obligated to report
unsafe condition, near-miss, and
incident/accident to supervisor or
safety officer.
Investigation will be carried out based on your report to take necessary
prevention of the same occurrence in the future.

Sir, this sling


is defect,
really unsafe

OK lets
change it
with the
good one
Site Safety Regulation
g. Every personnel is obligated to keep
work area clean and tidy. Wasting
garbage elsewhere is prohibited.

I will make this area


clean at all time.
Garbage brings
hazards to our
health.
Site Safety Regulation
h. Every personnel is prohibited to
smoking in workplace. Smoking is only
allowed in designated smoking area.
Site Safety Regulation
When you need to go smoking, please
go to designated smoking area
Site Safety Regulation

i. Every personnel should drive or ride


any vehicle in project area with
maximum speed 25 km/h.
Violation and Disciplinary
Action
Violation is indicator of lack awareness
Violation and Disciplinary
action
MES Management committed to encourage all personnel
on the premises to comply with site safety violation.
Necessary efforts such safety trainings, safety campaigns,
safety awards, and safety inspections have been taken and
will be kept continue.
Next necessary step to be taken by MES Management is to
take disciplinary action against those who violate site safety
regulation.
Every body from top management to the workers should take
it seriously. Safety is every body responsibility.
Violation and Disciplinary
action
First Violation Disciplinary Action Reprimand

1st Warning
Second Violation Letter and 2
Disciplinary Action
days
suspension

2nd Warning
Third Violation Letter and 5
Disciplinary Action
days
suspension

Fourth Violation Dismissal form


Disciplinary Action
project
End of Induction Training
Should you need more information,
please contact safety team. We will be
please to assist you.
Safety Contact
 I Gede Sumantra, MES,
(081379454399)
 R Bagus Teguh KW, MES, (0813
90565309)
 Dodi Achmad, SSP, (0812 20707786)
 Dodi Fahrodi, SSP, (0812 25592702)
 Lukman, SSP (0815 73565567)
 Ali Efendi, SWI, (0813 25373846)
 Muklish, SWI, (0852 31149115)
 Siswoyo, GEOTEC, (0815 53103042)
 Hendra Permana, CEM, (0856
93610638)
 Sony Setiawan, ACSET, (0813
90758455)
 Krismantomo, INDOMIX, (0813
90484651)
 Gilang Grishnanda, SKS, (0856
1948468)
 Adi Wijaya, KYUEI, (0813 57952420)
Emergency Contact
 Hospital Bangsri (0291 771097)
 Hospital Kartini (0291 591175)
 Police Station Bangsri (0291771110)
 Police Station Jepara (0291 591110)
 Military Quarters Bangsri (0291 771003)

You might also like