Eliminate 3M Eliminate 3M: Achieve World Class Manufacturing
Eliminate 3M Eliminate 3M: Achieve World Class Manufacturing
ELIMINATE 3M
3M
3M is a Japanese concept derived for shop
floor improvement
It contains 3 elimination activities
Since it starts with letter M it is called as
3M
ELIMINATE 3M
ELIMINATE 3M
MUDA(WASTE)
MUDA stands for eliminating Non Value Added
activities
ELIMINATE 3M
7 TYPES of MUDA
MUDA
ELIMINATE 3M
MUDA of PRODUCTION
Production more than requirement
Production earlier than requirement
ELIMINATE 3M
MUDA of WAITING
Machine breakdown
Die breakage or die problem
Pallet shortage
Die set up time (SMED)
ELIMINATE 3M
MUDA of CONVEYANCE
Panel changing from WIP pallets to
Despatch Pallets
Operation pending production
Unnecessary movement of fork lifts
Changing
panels from
WIP pallet to
CC pallet
Operation
pending
production
ELIMINATE 3M
MUDA of CONVEYANCE
ELIMINATE 3M
ELIMINATE 3M
MUDA of STOCK
MUDA of WORKMEN
MOVEMENT
Non value added operator movement
ELIMINATE 3M
No panel
diverter
Panel
diverter
available
Difficult to
pick the
panel
Easy to pick
the panel
ELIMINATE 3M
MUDA of Defects
Production of defective parts
ELIMINATE 3M
ELIMINATE 3M
Muri
Overburdening people results in Safety and
Quality problems
Overburdening Equipment causes Break
ELIMINATE 3M
2.762 Ton
with 5T
forklift
WRONG
CORRECT
ELIMINATE 3M
Two dies
lifted at time
One die
lifted at time
Strain while
moving the
pallet
No Strain
while
moving the
pallet
ELIMINATE 3M
MURA (Unevenness)
MURA stands for any activity that contains
inconsistency or ineffective utilization
ELIMINATE 3M
MURA (Unevenness)
Unevenness results from an irregular
ELIMINATE 3M
MURA
(Unevenness)
ELIMINATE 3M
ELIMINATE 3M
ELIMINATE 3M
ELIMINATE 3M
Traditional
(Unleveled)
Mixed Model
Production
(Leveled)
ELIMINATE 3M