The document is a request for clarification on the proposed CCTV system for Menelik's Palace Museum Park restoration project. It asks 12 questions to determine system requirements such as the needed picture quality, recording hours, day/night capability, equipment room location, operating team, and whether redundant infrastructure is required.
The document is a request for clarification on the proposed CCTV system for Menelik's Palace Museum Park restoration project. It asks 12 questions to determine system requirements such as the needed picture quality, recording hours, day/night capability, equipment room location, operating team, and whether redundant infrastructure is required.
The document is a request for clarification on the proposed CCTV system for Menelik's Palace Museum Park restoration project. It asks 12 questions to determine system requirements such as the needed picture quality, recording hours, day/night capability, equipment room location, operating team, and whether redundant infrastructure is required.
Renovation PROPOSED CCTV SYSTEM PLEASE COMMENT ON THE SYSTEM
B1. CORONATION HALL - ZUFAN ADARASH
CLARIFICATION REQUEST 1. 2. 3. 4.
Do you want to see a scene and know if something is happening?
Do you want to see an event and determine exactly what is happening? Do you want to see the individual and determine exactly who is involved? what is the picture quality needed? How clear the image should be ? And Picture Size to be viewed? 5. Do we need to record for each camera and if so how many hour record is needed per camera? 6. Do wee need both Day & Night Security OR just Day Time ? 7. where should Main control station and Equipment room should be ? 8. Who is the operation team or who will run the museum and accounted for the security concern? 9. What is the specific CCTV requirement by the Operation team? 10.What is the minimum lighting illumination (so as to protect the art from hot lighting) when the museum is empty of visitors ? 11.Do we need two way audio signal at each Camera? 12.Do we need to plan for redundant Back bone FO core, Core switch , and Fire wall?