Highlights of Inst. Jobs in N.

FY 2012-13
Field jobs
DCU fire job
New scheme for dcu sump level control
Tankages lt commissioning
Furnace combustion control
implementation for dcu and vgo
Nucleonic inst commissioning for v-25,c-
01 and v-04
Faulty gas detectors replacement
Faulty skin T/C replacement in VGO
Bitumen truck loading stabilizaion
PR
Skin t/c
Dcu pass flow c/v
Sampling system fittings
Density meter for vgo combustion control
Speed probes for dcu p-01
Repair
Faulty barrier repair from MTL
Faulty Thermal mass flowmeter repair
SM faulty power supply replacement
Faulty O-ring Diode replacement
Restoration after fire in of DCU F-01:Pass
flow instruments for all six passes were
replaced with new one. Cable laying,cable
glanding and calibration for new inst.
Kaizen /suggestions
VGO C-03 level stabilization
VGO annunciator reliability improvement