FMEA On Time Lost/ Idle
FMEA On Time Lost/ Idle
VIJIT SAHU
GP PROJECT
2017
Power Failue
Air Supply
Mainten
ance Steam Supply
Trims Unavailable
Plannin
g PP Meeting Not Done
Workaid Unavailable
ER Meeting
ER ER Activities
Line Meeting
Pending Decision
Manage
ment
1st Hour 2nd Hour 3rd hour 4th Hour 5th Hour 6th Hour 7th Hour 8th Hour
TOTAL
Machine Breakdown
Power Failue
Air Supply
No Plan
Trims Unavailable
Style Changeover
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
Unavailability of labels
[17th Feb Reliance khakhi , 14th -15th Feb
UTOC Jackets]
[ 17th Feb all styles, 7th Feb
Radium could not arrive on time
SRM Coverall, 6 -7 Feb Arjyle
th th
Jackets]
Trim Store take much time to procure trims
[ 11th Feb UTOC
Jackets ]
Materials
Minimise
Waiting
FRC label not label itself not for work
ready from the available from
mill buyer
Label
arrived
late
Label
attachment
done at last Communicated
to merchant
SOLUTIONS
No
Radium
available
Radium could
not arrive on Workers sitting idle
time
No tracing
of
common
trims
No
reminder if
it finishes
from the Last minute order for
store radium from nearby
supplier
Delay in
receiving the
Method radium tape
RADIUM NOT ARRIVE ON TIME
trim store
take much Workers sitting idle
time to
procure trims
Takes much
time
Finds
carton and
check if it
has the
required
trims
Method
TRIM STORE TAKE MUCH TIME TO PRECURE TRIMS
SOLUTIONS
LOCATION OF TRIMS
UPDATED SOP
STEP 1: MATERIAL RECEPT
STEP 2 : MATERIAL UNLOADING AND STORAGE
STEP 3 : QUANTITY CHECK
STEP 4 : SWATCH PREPARATION
STEP 5 : VISUAL INSPECTION/ QUALITY CHECK
STEP 6 : STORAGE IN THE RACKS
STEP 7 : UPDATE THE BOARD LOCATION OF TRIMS
STEP 8 : ISSUING OF MATERIALS
STEP 9 : RETURNS
Extracted SOP_Trims.pp
from
UPDATED BIN CARD
Before After
Man No Work
Variation in in the
seam assembly
allowance
MACHINE
Worker
sitting idle
Plotter in not
calibrated
No proper
SOP
No rechecking is done
Method
PREPARATORY NOT DONE
SOLUTIONS
Maximum prevention is
already done Daily Checking of
Calibration of the plotter
and SOP implementation
Fabric
came late
Fabric not
Available
Workers sitting idle
Reliance
brand is given
priority
Priority
wise
planning
Method
FABRIC NOT AVAILABLE
SOLUTIONS
Marking
done
wrong
Marking
Done Wrong Delay in Production
Marking pattern
given without
instructions
No
demonstratio
n
Method
MARKING DONE WRONG
SOLUTION
Production Masterji
Extra
Work and
extra time
Fabric came
late
Embroidery
panel Workers sitting idle
received late
(back patch)
Embroidery patch
requirement is high
then vendor capacity
Method
EMBROIDERY PANEL RECEIVED LATE
SOLUTION